Professional Documents
Culture Documents
LAHAN TERBANGUN (m2) (m2) (m2) (m2) 3.50 (%) (Lantai) (m2) (m2) % Unit Unit Unit Unit Unit Unit Unit Lot Lot Lot Lot Lot
A1 Podium komersil 9,970 9,970 9,970 29,910 349
Podium Parkir 6,979 6,979
Tower 01 729 18 13,122 13,122 310 83 19 62 17
Tower 02 16,080 11,152 11,152 69% 688 62% 18 12,377 12,377 98,717 6.14 292 1,625 78 433 18 100 2,158 58 16
Tower 03 756 18 13,608 13,608 321 86 20 64 325 17 87
Tower 04 - - - 756 20 15,120 15,120 357 95 22 71 19
Tower 05 729 20 14,580 14,580 344 92 21 69 18
B Podium Komersil 1,450 1,450 - - 2,900 34
Podium Parkir 4,970 4,970 4,970 5,259 - -
Tower 06 9,929 6,536 6,536 66% 729 65% 18 13,122 13,122 44,408 4.47 310 980 83 261 19 60 1,302 62 17
Tower 07a 671 20 13,428 13,428 317 85 20 63 196 17 52
Tower 07b 748 20 14,958 14,958 353 94 22 71 19
C Podium Komersil 2,467 2,467 - - 4,934 58
Podium Parkir 7,496 7,496 7,496 8,292 - -
Tower 08 729 20 14,580 14,580 344 92 21 69 18
Tower 09a 15,258 9,987 9,987 65% 729 65% 20 14,580 14,580 73,784 4.84 344 1,626 92 434 21 100 2,159 69 18
Tower 09b 672 20 13,446 13,446 317 85 20 63 325 17 87
Tower 10 729 18 13,122 13,122 310 83 19 62 17
Tower 11 729 18 13,122 13,122 310 83 19 62 17
D Podium Komersil 2,749 2,749 - - 5,498 64
Podium Parkir 5,853 5,853 5,853 5,853 - -
Tower 12 12,674 8,602 8,602 68% 810 68% 23 18,630 18,630 61,388 4.84 440 1,320 117 352 27 81 1,753 88 23
Tower 13 810 23 18,630 18,630 440 117 27 88 264 23 70
Tower 14 810 23 18,630 18,630 440 117 27 88 23
E Podium Komersil 2,706 2,706 2,203 - 7,615 89
Podium Parkir 2,977 2,977 2,977 3,508 -
Tower 15 11,035 7,027 64% 3,418 51% 23 78,614 78,614 86,229 7.81 1,709 1,709 569 569 133 133 2,411 342 114
- - - - - - 342 - 114
- - - - - - -
F Podium Komersil 1,935 1,935 - 3,870 45
Podium Parkir 5,122 5,122 5,122 5,122 -
Tower 16 11,377 7,619 7,619 67% 761 62% 23 17,512 17,512 56,407 4.96 413 1,240 110 331 25 76 1,648 83 22
Tower 17 761 23 17,512 17,512 413 110 25 83 248 22 66
Tower 18 761 23 17,512 17,512 413 110 25 83 22
G Komersil Ruko 01 936 936 936 - 2,808 22
3,586 5,706 1.59
Komersil Ruko 02 966 966 966 - 2,898 22
Total Lahan Terbangun 79,939 50,923 43,896 64% 23,179 23,179 11,872 - 17,526 62% 366,205 426,638 3.50 11,430
66% note: total GFA perijinan (bukan konstruksi)
PENDIDIKAN
1 TK
2 SD
3 SLTP
4 SMU
5 Perpustakaan
KESEHATAN
6 Balai Kesehatan
7 Rumah Bersalin
PERIBADATAN
8 Musholla
9 Masjid
BINA SOSIAL
10 Balai Warga
11 Gedung Serbaguna
OLAH RAGA / REKREASI
12 Tempat Bermain
13 Taman Warga
14 Taman Lingkungan
15 Lapangan Olah Raga
16 Gedung Olah Raga
17 Stadion Mini
18 Museum
19 Gedung Olah Seni
20 Bioskop / Theater
PELAYANAN PEMERINTAH
21 Pos Keamanan
22 Kantor Kelurahan
23 Kantor Pelayanan Umum
24 Pos Pemadam Kebakaran
25 Kantor Pos Pembantu
PERBELANJAAN / NIAGA
26 Warung
27 Pertokoan
28 Pasar lingkungan / Pertokoan
TRANSPORTASI
29 Pangkalan Kendaraan Umum
RASARANA
KEBUTUHAN (M2)
480,000 - 3000
480,000 - 3000
480,000 - 3000
250 182.88 50
3,000 15.24 1000
300
6000 7.62
RENCANA
LOKASI
Luas * (M2)
6,218 -
Area sekitar Site (radius 2-5km)
20,117 -
Area sekitar Site (radius 2-5km)
8,839 -
Area sekitar Site (radius 2-5km)
4,572 -
Area sekitar Site (radius 2-5km)
457 -
Area sekitar Site (radius 2-5km)
1,524 -
Retail Parcel
2,286 -
Parcel D
2,438 -
Per Parcel (Podium)
1,524 -
Pacel A
3,810 -
Per Parcel (Podium)
991 -
Per Parcel (Podium)
36,576 -
Per Parcel (Podium)
11,430 -
Area Taman KAA
3,048 -
Per Parcel (Podium)
9,144 -
Area Taman KAA
1,143 -
Per Parcel (Podium)
- -
- -
- -
- -
2,667 -
Per Parcel
1,143 -
Parcel D
305 -
Parcel E
229 -
Parcel A
229 -
Retail Parcel
9,144 -
Retail Parcel
15,240 -
Retail Parcel
991 -
Retail Parcel
2,286 -
LOKASI
e (radius 2-5km)
e (radius 2-5km)
e (radius 2-5km)
e (radius 2-5km)
e (radius 2-5km)
um)
ium)
ium)
ium)
A
ium)
A
ium)
Jumlah unit Apartment
Asumsi Jiwa per Unit x4
11,430
45,720
PERHITUNGAN UNTUK PERIZINAN BLOK PLAN
LUAS B
LUAS LAHAN
LUAS PERSIL
NOTASI TERBANGUN LT. 1 LT. 2
1,085
1,248
0.64 42,076 1,258
2,977 4 11,908
608
59