PROJECT NAME DETAILS OF ACTIVITY ID

FILTER BY W.B.S FILTER BY W.BS FILTER BY LOCATION

PROJECT STATRT: ELEVATOR EV EARTH WORK EW BSMNT FLOOR 0


PROJECT FINSH : ALUMITAL AL FOUNDATION F GROUND FLOOR G0
LOCATION : HANDRILL&STEEL GATES HG CONCRETE CO 1ST FLOOR 1
SUBJECT: CARPENTRY WORKS CA PLASTER PS 2nd FLOOR 2

REMARKS: FINSHISHING FI MASONRY BR 3rd FLOOR 3

RESOURCES
TOTAL COST MARBLES MA ELECTRICTY EC 4th FLOOR 4
PLANNING ENGINEER: Eng.Mohamed Mesbah Mohamed Supplementary WORKS SW PLUMBING PM ROOF FLOOR 5
PAINTING PA OUT SIDE 6

planning for(building no.1)-new cairo

activity
MAN POWER -DAYES Equipment MATRIAL
id
Activity discription SUCCESSORES OD (O) type uunit Qty total
SALARY SALARY /
SYMA DISC. SALARY /DAY SYMA DISC. SYMA DISC.
/DAY UNIT
PROJECT
B1EW00S1 site preparation B1EW00S2 3.00 task L1 MANAGER
266.6666667 E1 LOADER 266.66667 M1 CEMENT 266.6667
B1EW00S2 earth works start B1EW00S3 1.00 task 0.000 L2 T.O.ENGINEER 166.6666667 E2 VIBRATOR 70 M2 AGG. 50
B1EW00S3 excavation B1EW00S4 10.00 task B1.0A20 L3 SITE ENGINEER 133.3333333 E3 SITE EQUIP. 10 M3 SAND 10
B1EW00S4 soil replacement&compaction B1CO00S1 5.00 task B1.0A30 L4 FORMAN 83.33333333 E4 GENRATOR 150 M4 STEEL 4500
B1CO00S1 pour pc B1CO00S2 3.00 task B1.0A40 L5 ACCOUNTANT 66.66666667 E5 HUMMER 1100 M5 TIE WIRE 150
ORDINARY
B1CO01 RC working 15.00 task B1.0A50 L6 LABOR
60 E6 COMPACTOR 200 M6 LUMBER 2000
finish mile
foundation complete 0.00 ston
B1.0A60 L7 PLASTER CREW 19 E7 CRAIN 1000 M7 MARBLES 150
start
Basement floor 0.00 mileston
B1.1C00 L8 ELELC.CREW 400 E8 M8 ALUMINUIM 500
B1CO00S2 RC Basement columns B1EW05 6.00 task B1.1C10 L9 PLUMBING CREW 1333.333333 E9 M9 GEPSUM 20
B1EW05 betomin B1EW06 2.00 L10 CARPENTER 120 E10 M10 ELE. 500
B1EW06 filling B1CO00S3 2.00 L11 STEEL FIXER 120 E11 M11 PLUMBING 20000
B1CO00S3 pc with grade 4 basmnt B1CO002 3.00 L12 CASTING 300 E12 M12
B1CO002 RC Basement slab B1COG0S04 12.00 task B1.1C20 L13 MASNON 170 E13 M13 BRICK 450
basement concrete complete 0.00 finsh M.S B1.1C50 L14 GARD 16.66666667 E14 M14
DESIGN
Ground floor 0.00 start M.S B1.2C00 L15 ENGINEER
5000 E15 M15
B1COG0S04 ground floor columns B1COG0S05 6.00 task B1.2C10
B1COG0S05 ground floor slab B1CO01S05 12.00 task B1.2C20
ground floor concrete complete 0.00 task B1.2C30
1st floor 0.00 task B1.3C00
B1CO01S05 1st floor coulmns B1CO01S06 6.00 task B1.3C10 COST ACCOUNT
B1CO01S06 1st floor slab B1CO02S07 12.00 task B1.3C20 PROJECT MANAGER P001

1st floor concrete complete 0.00 finsh M.S B1.3C30 T.O.ENGINEER P002

2ed floor concrete 0.00 start M.S B1.4C00 SITE ENGINEER P003
B1CO02S07 2ed floor coulmns B1CO02S08 6.00 task B1.4C10 FORMAN P004
B1CO02S08 2ed floor slab B1CO03S09 12.00 task B1.4C20 ACCOUNTANT P005
ORDINARY
2ed floor concrete complete 0.00 finsh M.S B1.4C30 P006
LABOR
3ed floor concrete 0.00 start M.S B1.5C00 PLASTER CREW P007
B1CO03S09 3ed floor coulmns B1CO03S10 6.00 task B1.5C10 ELELC.CREW P008

B1CO03S10 3ed floor slab B1CO04S11 12.00 task B1.5C20 PLUMBING CREW P009

3ed floor concrete complete 0.00 finsh M.S B1.5C30 CARPENTER P010
4th floor concrete 0.00 start M.S B1.6C00 STEEL FIXER P011
B1CO04S11 4th floor coulmns B1CO04S12 6.00 task B1.6C10 CASTING P012
B1CO04S12 4th floor slab B1CO05S13 12.00 task B1.6C20 MASNON P013
4th floor concrete complete 0.00 finsh M.S B1.6C30 GARD P014
DESIGN
B1CO05S13 roof concrete B1CO05S14 0.00 start M.S B1.7C00 P015
ENGINEER
B1CO05S14 roof colmuns&slab B1BR00S00 9.00 task B1.7C10
roof concrete complete 0.00 finsh M.S B1.7C20 LOADER H000
B1BR00S00 brick works B1BR00S00 0.00 start M.S VIBRATOR H001
B1BR00S00 brick works 4 basmnt B1BR00S01 SITE EQUIP. H002
B1BR00S01 brick works 4 outside walls B1BRG0S02 GENRATOR H003
B1BRG0S02 ground floor brick works B1BR01S03 12.00 task B1.2C30 HUMMER H004
B1BR01S03 1st floor brick works B1BR02S04 12.00 task B1.3C30 COMPACTOR H005
B1BR02S04 2ed floor brick works B1BR03S05 12.00 task B1.4C30 CRAIN H006
B1BR03S05 3ed floor brick works B1BR04S06 12.00 task B1.5C30
B1BR04S06 4th floor brick works B1BR05S07 12.00 task B1.6C30 CEMENT M000
B1BR05S07 roof brick works B1PSG0S01 8.00 task B1.7C20 AGG. M001
brick works complete 0.00 F.M.S SAND M002
finshing 0.00 start M.S B1.2f00 STEEL M003
1 B1PSG0S01 G.f floor palster 1 2.00 B1.2f10 TIE WIRE M004
2 B1ECG0S01 electrical worksG.-floor 14.00 task B1.2f20 LUMBER M005
3 B1CAG0S01 install frames of window&doors G f 14.00 task B1.2f30 MARBLES M006
4 B1PSG0S02 plaster works of G- floor 18.00 task B1.2f40 ALUMINUIM M007
5 finshing G- floor complete 0.00 task B1.2f50 GEPSUM M008
6 finshing 1st- floor 0.00 task B1.3f00 ELE. M009
7 B1PS01S03 1st floor palster 1 2.00 task B1.3f10 PLUMBING M010
8 B1EC01S02 electrical works1st-floor 14.00 task B1.3f20 CASTING M011

9 B1CA01S02 install frames of window&doors 1st f 14.00 task B1.3f30 BRICK M012
10 B1PS01S04 plaster works of 1st- floor 18.00 task B1.3f40
11 finshing 1st- floor complete 0.00 task B1.3f50
12 finshing 2ed- floor 0.00 task B1.4f00
13 B1PS02S05 2ed floor palster 1 B1.4f10
14 B1EC02S03 electrical works2ed-floor 14.00 task B1.4f20
15 B1CA02S03 install frames of window&doors 2ed f 14.00 task B1.4f30
16 B1PS02S06 plaster works of 2ed- floor 18.00 task B1.4f40
17 finshing 2ed- floor complete 0.00 task B1.4f50
DESIGNED BY
18 finshing 3ed- floor 0.00 task B1.5f00
19 B1PS03S07 3ed floor palster 1 B1.5f10
20 B1EC03S04 electrical works3ed-floor 14.00 task B1.5f20 ENG.MOHAED MESBAH
21 B1CA03S03 install frames of window&doors 3ed f 14.00 task B1.5f30
22 B1PS03S08 plaster works of 3ed- floor 18.00 task B1.5f40
23 finshing 3ed- floor complete 0.00 task B1.5f50
24 finshing 4th- floor 0.00 task B1.6f00
25 B1PS04S09 4th floor palster s1 2.00 task B1.6f10
26 B1EC04S05 electrical works4th-floor 14.00 task B1.6f20
27 B1CA04S04 install frames of window&doors 4th f 14.00 task B1.6f30
28 B1PS04S010 plaster works of 4th- floor 18.00 task B1.6f40
29 finshing 4th- floor complete 0.00 task B1.6f50
30 finshing roof works 0.00 task B1.7f00
31 B1PS05S011 roof palster s1 B1.7f10
32 B1EC05S06 electrical works roof-floor 2.00 task B1.7f20
33 B1CA05S05 install frames of window&doors roof f 2.00 task B1.7f30
34 B1PS05S012 plaster works of roof- floor 12.00 task B1.7f40
35 inside finshing works finshed 0.00 task B1.7f50
36 B1HG06S1 steel handrill for terraces 5.00 start flag
37 B1HG06S2 handrill for stairs 3.00 task
38 out side finshing works 21.00 s.m.s B1.8f00
39 B1PS06S13 outside plaster for front view 21.00 task B1.8f10
40 B1PS06S14 outside plaster for side view 12.00 task B1.8f20
41 B1PS06S15 outside plaster for2ed side view 21.00 task B1.8f30
42 B1PS06S16 outside plaster for back view 12.00 task B1.8f40
43 B1PS06S17 plaster for opening 5.00
44 out side plaster finshed 0.00 task B1.8f50
45 B1PS06S18 gepsum works for outside faces 20.00 task B1.8f60
46 B1WS06S01 fixing outside condition stand 3.00
47 B1PL06S01 plumbing works for side view 15.00 task B1.8f70
48 B1PL06S02 plumbing works for 2ed side view 12.00 task B1.8f80
49 B1PL06S03 plumbing works for backend view 10.00
50 B1PL06S04 plumbing works for opining 7.00
51 B1PL06S05 plumbing works for main line 6" 20.00
52 B1EC0607 rising elec. For building 10.00
53 B1HG06S03 gate works for outside walles 3.00 task B1.8f90
54 B1PS06S18 painting for 3 faces with dry mass 3.00
55 B1PS06S19 painting with dry mass for opinings 3.00
56 B1PA06S01 painting for main view with special paint 15.00
57 B1AL06S01 alumital working 5.00 task B1.8f100
58 B1CA05S06 doors fixing for all units 3.00 task B1.8f110
59 B1EV06S01 fixing columns for elevator 7.00
60 B1EV06S02 fixingprating units for elevators 15.00
61 B1WS06S02 out side finshing (stone-electricety for walls 12.00 task B1.8f120
62 B1MA06S01 marbels working for stairs&corridores 21.00 task B1.8f150
63 B1MA06S02 marbels working for interface 15.00 task B1.8f160
64 B1EC0608 ligting for walls,corridors and.interfaces 3.00
65 B1WS06S03 cleaning 2.00 task B1.8f170
66 B1WS06S04 pouring ramp 3.00 task B1.8f180
67 B1WS06S05 land scape works 3.00 task B1.8f190
68 project has finshed B1.8f200