G+8 PH2 - 00 Basement Plan shcl.qc@sobha-me.com
Created
Description Mar 22, 2018 at 10:34am
Construction-Joint Waterproofing. qa@sobha-me.com
Excellent installing of Water-Bar. Last Updated
And additional installing of Apr 30, 2018 at 8:43am
Injection-Hose, witch are not
shown in the Drawing.
Area of G+8 Phase 1 ( existing
Building).