You are on page 1of 4

1.

QT Audit Hartland — Q&T Middle East

PlanGrid Issue Report - Jul 4, 2018


Prepared by Sobha Hartland Contracting

Description
1 issues in this report.

Contents

#447 4-E Expansion Joint Waterproofing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Prepared by Sobha Hartland Contracting on Jul 4, 20181 Created with PlanGrid


1. QT Audit Hartland — Q&T Middle East

#447 4-E Expansion Joint Waterproofing


List Status
03. Good Practice / Mock up Closed

Sheet Assignees
G+8 PH2 - 00 Basement Plan shcl.qc@sobha-me.com

Location Due Date


Good Practice - Michael Mar 29, 2018

Created
Description Mar 22, 2018 at 10:34am
Construction-Joint Waterproofing. qa@sobha-me.com
Excellent installing of Water-Bar. Last Updated
And additional installing of Apr 30, 2018 at 8:43am
Injection-Hose, witch are not
shown in the Drawing.
Area of G+8 Phase 1 ( existing
Building).

this allows for possible leaks. a


subsequent professional and safe
sealing.

Arranged by Construction Man-


ager
Mr. Joji Sam

Photos

Mar 22, 2018 at 10:34am Mar 22, 2018 at 10:36am

Prepared by Sobha Hartland Contracting on Jul 4, 20182 Created with PlanGrid


1. QT Audit Hartland — Q&T Middle East

Mar 22, 2018 at 10:36am

Prepared by Sobha Hartland Contracting on Jul 4, 20183 Created with PlanGrid


1. QT Audit Hartland — Q&T Middle East

Prepared by Sobha Hartland Contracting on Jul 4, 20184 Created with PlanGrid

You might also like