CONSTRUCTION CLAIMS - EOT DELAYS ANALYSIS PAGE 1 OF 6

Construction
Claims EOT
Delay
Analysis
Techniques
WWW.PLANNINGENGINEER.NET

www.PlanningEngineer.net

PRESENTED BY:
HANY ISMAEL, MSC., PMP

Recorded Videos
5

31
Construction Claims - EOT Delay
Practicing Hours

Analysis Techniques 36
Total Duration

Self-study online course with full support by Email & WhatsApp.


CONSTRUCTION CLAIMS - EOT DELAYS ANALYSIS PAGE 2 OF 6

Why should you study claims management? Why our course, specifically?
In today's competitive corporate environment, efficient time Our course aims to be a game-changer for project managers looking to
management and timely project completion are crucial for organizations level up their work efficiency and competence. But its scope goes far
to remain competitive. Despite the growing need for time management beyond project management - this course is designed to benefit
in construction projects, many projects are failing to meet their anyone involved in construction projects, including Planning
deadlines. Engineers, Contract Administrators, Construction Managers,
Technical Managers, and other relevant professionals.
This can have serious consequences for the hiring company, such as
increased costs and halting of processes. Project managers must be By providing in-depth knowledge of construction claims, project
competent in managing time and carrying out operations and activities delays, and delay analysis techniques, this course offers valuable
to reduce the time period. To prepare project managers for such insights that can be applied to a wide range of occupations dealing with
scenarios, it is essential that they understand the Extension of Time and construction projects. Whether you're a seasoned project manager or
delay analysis. just starting out, this course is an excellent opportunity to enhance
your skills and knowledge.
Unfortunately, many courses on similar subjects tend to focus on theory
rather than application, with a heavy emphasis on memorization. This
course sets itself apart by providing opportunities for practical
application of real-life claims in the construction industry.

Why do we focus on practical application? Course Overview


In project management and time management for construction The course structure is designed to challenge trainees and expand their
projects, theoretical knowledge alone is insufficient for effective thinking capacities by exposing them to a wide range of academic
learning. This field requires practical application of course content to stimuli.
ensure comprehension and mastery of the material. It's like giving a
driver a manual on road rules and car mechanics, but never letting Claims Management and Delays analysis involve six main steps, and
them get behind the wheel. trainees are expected to complete all challenges to gain competency in
the field. The course aims to challenge the trainees' perspective and
Without practical experience, the driver would struggle to apply their thinking, so they must have a thorough understanding of the course to
knowledge effectively, just as trainees struggle to apply theoretical defend the six challenges they undertake.
project management content without sufficient practical experience.
Extension of Time can be a challenging concept for clients to agree
This course focuses on practical application of claims and EOTs upon, which is why trainees need to be Smart, Fast, Confident, and
because this gap in the market exists. As a student, I personally Convincing.
experienced the shortcomings of courses that only skimmed the
surface of theoretical concepts, leaving students without the necessary The objective of the course is to equip trainees with the necessary tools
skills to execute them in real-world situations. and techniques to provide legitimate claims with sufficient information
to convince clients to grant an extension. To facilitate the learning
This proved problematic in my professional life when I had to prepare process, the course will provide trainees with EOT, claims, and delay
claims for two large construction projects in Saudi Arabia. The more analysis Techniques.
complex project involving international parties highlighted the need
for practical knowledge and skills to execute theoretical concepts. Course Instructor
My practical experience from these projects proved invaluable when I The course material has been crafted in collaboration with a skilled
pursued my MSC and had to write a dissertation on the cause of delays planning and control manager who possesses 20 years of practical
in construction projects. It was the practical application of my learning experience in managing high-end mega projects. In addition to this,
that allowed me to succeed. This highlights the need for a balance
the course instructor holds a degree in management of construction
between theory and practical application in project management
studies for effective learning and skill development. projects and infrastructure from Liverpool University, United Kingdom.

www.planningengineer.net
CONSTRUCTION CLAIMS - COURSE DESCRIPTION AND CONTENT PAGE 3 OF 6

Our ultimate goal is to equip planning engineers with top-notch course Completion Certificate
content that will help them acquire invaluable planning techniques and
develop the necessary skill set to excel in their field. Upon completion of this course, the trainees will be awarded a course
completion certificate.
Course case study This certificate will testify to the fact that the trainees undertook the
required learning sessions, quizzes, and did course related work,
The competitive advantage this course provides is that trainees will be enabling them to have gained the right skill set and relevant
given a real case study project, in which they will be given the
knowledge.
opportunity to execute and practice all the claims techniques they
learn in the course. The aim of this case study will be to enable trainees
to develop the following essential documents:

1. Finding different project documents and correspondences.


2. Development of events document, along with a transcript of
possible discussion topics, for project manager.
3. Template for each event for team discussion and client
clarifications.
4. Preparation of a supporting letter for all relevant events.
5. Development of an EOT log, including all relevant data.
6. Primavera Influence schedule with all the events.
7. 11 Primavera Influence schedules (one for each event).
8. Narrative report for your claim showing the delays.

What is FIDIC and what do you need to know


in FIDIC?
Continuous Improvement
Our services do not end upon the completion of this course. We take
the initiative to support our trainees at all possible times, in all possible
manners. It is primarily due to this reason that we have developed a
special support mail.

Our support mail caters to the concerns and issues of the course
trainees from all over the globe. Trainees are free and encouraged to
share their ideas, problems, suggestions, and we will always be willing
to cater to them.

Furthermore, such a community which gathers all expertise interested


in Claims Management, Extension of Time (EOT) and Delays Analysis,
would be a great opportunity for exchanging information and jobs.

- Strategies for defending the organization against and preventing


Our Promise
penalties as a result of time delays in project completion.
- Analyzing areas of project delay and picking out and eradicating the At our organization, we are committed to providing our trainees with
most problematic ones more than just theoretical knowledge of project management. We are
- The right and most effective methods of reporting project delays dedicated to helping our trainees improve their skills and abilities in the
- Creating influence schedule in Primavera and providing evidence to field. We understand the desire for growth and development, which is
why we strive to provide course content that meets everyone's
support project delay claims.
expectations.
- How to estimate the project delays in days if you have more than one
delay events concurrently. Our promise to our trainees is to not only deliver conventional
- How to defend your claim and be ready for client discussion knowledge on Claims Management but also practical techniques that
- Step by Step case study with a certain scenario to develop an EOT. can be applied in real-world situations. We are dedicated to ensuring
our trainees' complete satisfaction with our courses.
- Continuous improvement in our website where you can ask
questions, meet colleagues from all over the world, and find relevant However, in the unlikely event that you are not satisfied with the
claims jobs. course and its material, we offer a full refund.
CONSTRUCTION CLAIMS - COURSE DESCRIPTION AND CONTENT PAGE 4 OF 6

Course Reviews Share Your Progress in our Community!


CONSTRUCTION CLAIMS - COURSE DESCRIPTION AND CONTENT PAGE 5 OF 6


Construction Introduction
❖ Definition of “Claim”
• Sources of Claims
• Stages of the Claim
• Extension of Time Claims

Claims EOT Delay •



EOT Claims Importance
Making Claims Responsibility
• Claim Building, Requirements, Steps

Analysis ❖ Find Events Step • Risk Events


• Events Sources
• Client Events
Techniques •

Direct Events
Hidden Events

❖ Collect and • Collect Supporting Documents During


Record Project Execution
Supporting • Collect Supporting Documents During
Claim Preparation
Documents
• Recording Supporting Documents
• Discussion Meeting Log
• Delays Tracking Log
• Record Events

❖ Analyze the • Claims Analysis


delays • Global Method for Delay Analysis
• As Planned Method for Delay Analysis
• As Built Method for Delay Analysis
• As Planned vs. As Built Method for Delay
Analysis
• Time Impact Analysis Method for Delay
Analysis
• Windows Snapshot Method for Delay
Analysis
• Additional Payment and Prolongation
Costs Claim
• Update Delays Tracking Log

❖ Build Your Case • As Planned vs. As Built Method for Delay


Analysis
• Primavera Practical Case
• Time Impact analysis technique
• Primavera Practical Case
• Events Schedules
• All Events Schedule
• Total Delays Duration
• Events Narrative documents

www.planningengineer.net
CONSTRUCTION CLAIMS - COURSE DESCRIPTION AND CONTENT PAGE 6 OF 6

❖ Get ready to • Different Methods for Dispute Resolution


defend your case • Claim Reports
• Reports Generation from Delays Log
Method

❖ Claims • FIDIC Contact Forms Introduction


Procedures • Claims Contractual Types
Under FIDIC • Claims Procedures Under FIDIC 1999
• Claims Negotiation and Settlement

DON’T HESITATE TO CONTACT US!


WE’RE EVERYWHERE

(+20) 12 777 677 28 @PlanningengineerNet

(+971) 563 444 875 @planningengineerest

@planning-engineer-est @PlanningEEst

@PlanningEngineerDotNet @planningengineerest

- CLICK HERE TO GO TO THE COURSE PAGE