You are on page 1of 11

Martabe Gold

Mine Project

Notes

FIGURE 2
1. Coordinates provided in relation to WGS84 in UTM values, Zone 52 South
2. Basemap is based on contour generated from bathymetry and LiDAR shown at 5 m vertical
intervals.

Client Project
Revision Description Date
GRM PT Ground Risk PT Merdeka Mining Services WETAR PYRITE PROJECT
Management
Scaale Title
Gedung 88 Tower A, Level 38 Field Test plan
Suite GH 16 Project Number Figure Number
Jl. Casablanca Raya Kav.88 1 : 2,000 19 MMS 001 2
Jakarta 12870, INDONESIA PT Merkeda Mining Servis Drawn Drawing Date
SHB 12 Dec 2019
Phone. +62 (021) 2963 6701 The Convergence Indonesia Lt.20 Checked Checked Date
Email: contact@groundrisk.com Jl. Epicentrum Boulevard Raya NYR 12 Dec 2019

Web: groundrisk.com Size Designed Design Date


A3
APPENDIX A

REPORTS TO GEOTECHNICAL BOREHOLES AND CORE PHOTOGRAPHS

PT Ground Risk Management


Plaza Kuningan
CLIENT : PT Merkeda Mining Servis North Tower, Level 3
ENGINEER : Phil Hall Gedung 88 Tower A
Level 38 Suite GH
PROJECT : Wetar Pyrite Project - Outloading Kota Kasablanka
LOCATION : Wetar, Indonesia Jl Casablanca Raya Kav.88
GRM PROJECT No. : 19 MMS 001 Jakarta 12870
INDONESIA

AREA : Onshore RIG : YSB YSO 01


EASTING : 204370.0 m LOGGED BY : EPS Borehole: DH-01
NORTHING : 9148287.0 m START DATE :
COORD. SYS. : WGS 84 UTM ZoneEND
40 DATE :
SHEET : 1 OF 1
ELEVATION : 74.00 m MSL CHECKED BY :
STATUS :
INCLINATION : -90° CHECKED DATE:
SPT

Rock Fracture

(fractures / m)
Graphic Log

Frequency
Rock RQD (%)
Depth (m)

Samples Rock

90 90 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 Rock TCR (%)
Elevation
(m MSL)

Soil / Rock Material Description

Seating Drive
or Depth Inferred Strength Rock Discontinuity
Soil: TYPE, consistency, colour, grain size, N
Field RL moisture, type. Stratigraphy Estimated Description
Test UCS in MPa

N Value
Rock: TYPE, colour, weathering, grain size,

Blows 1
Blows 2
strength, fracturing, type.

VH
EH
EL
VL
10
20
30
40

10
15
20
M
H
L

5
0.50m 74.00 BASALT: dark grey, massive, low

28 62 20 40 30 65 70 85 85 80 90 90 93 55 75 90 90 100 100 90 80 100 100 100 95 85 80 90 100 75 70 95 80 100 90 35 10


50 50
1.50m
weathering, very strong, quarz
filled fractures, schoria at random 50 50
JT 35° Qz PR S
2.50m locations, some oxidation
50 50
3.50m
50 50
70 4.50m
50 50
5
6.00m
50 50

7.50m JT 35° Qz PR S
50 50

9.00m
65 50 50 JT 35° Qz PR S
10 JT 35° Qz PR S
10.50m
50 50

12.00m
50 50 JT 35° Qz PR S
JT 55° Qz PR S
13.50m
50 50
60 JT 35° Qz PR S
GRM LIB 1.01.GLB Log GRM BOREHOLE 19 MMS 001 WETAR.GPJ <<DrawingFile>> 12/Dec/2019 19:17 10.01.00.11 Datgel CPT, Photo, Fence and Map, Monitoring Tools

15.00m
15 50 50
JT 55° Qz PR S
16.50m
50 50
JT 35° Qz PR S
18.00m
50 50

55 19.50m
50 50
20 JT 35° Qz ST SL
21.00m
50 50
JT 35° Qz PR S
22.50m
50 50
JT 35° Qz PR S
24.00m JT 55° Qz PR S
50 50 50

25 25.50m
50 50

27.00m
50 50

28.50m
50 50
45
30.00m
30 50 50

40
35

37.00
37.00 CORE LOSS
0

0
0

39.00
35
35.00 Hole Terminated at 39.00 m
40
Plaza Kuningan
CLIENT : PT Merkeda Mining Servis North Tower, Level 3
ENGINEER : Phil Hall Gedung 88 Tower A
Level 38 Suite GH
PROJECT : Wetar Pyrite Project - Outloading Kota Kasablanka
LOCATION : Wetar, Indonesia Jl Casablanca Raya Kav.88
GRM PROJECT No. : 19 MMS 001 Jakarta 12870
INDONESIA

AREA : Onshore RIG : YSB YSO 01


EASTING : 204419.0 m LOGGED BY : EPS Borehole: DH-02
NORTHING : 9148397.0 m START DATE :
COORD. SYS. : WGS 84 UTM ZoneEND
40 DATE :
SHEET : 1 OF 1
ELEVATION : 40.00 m MSL CHECKED BY :
STATUS :
INCLINATION : -90° CHECKED DATE:
SPT

Rock Fracture

(fractures / m)
Graphic Log

Frequency
Rock RQD (%)
Depth (m)

Samples Rock

Rock TCR (%)


Elevation
(m MSL)

Soil / Rock Material Description

Seating Drive
or Depth Inferred Strength Rock Discontinuity
Soil: TYPE, consistency, colour, grain size, N
Field RL moisture, type. Stratigraphy Estimated Description
Test UCS in MPa

N Value
Rock: TYPE, colour, weathering, grain size,

Blows 1
Blows 2
strength, fracturing, type.

VH
EH
EL
VL
10
20
30
40

10
15
20
M
H
L

5
40.00 SANDY CLAY, High Plasticity,
0.50m Dark Brown - Brown, Moist, Very
4 14 29 43
Stiff, Massive, organic material at
top, intercalation with gravel

1.50m
42 50 50

2 38
JT 35° Qz PR S
2.65 JT 35° Qz PR S
37.35 BASALT: dark grey, massive, , low JT 35° Qz PR S
weathering, very strong, fractured
at random spaces filled with
quartz, schoria at random places,
oxide at random places

100

55
4 36

100

65
GRM LIB 1.01.GLB Log GRM BOREHOLE 19 MMS 001 WETAR.GPJ <<DrawingFile>> 12/Dec/2019 19:17 10.01.00.11 Datgel CPT, Photo, Fence and Map, Monitoring Tools

6 34
JT 55° Qz PR S
JT 35° Qz PR S
100

75
100

88

8 32
JT 35° Qz PR S
100

60
100

100

10 30 JT 35° Qz PR S

JT 55° Qz PR S
JT 35° Qz PR S
100

55

JT 35° Qz PR S
JT 35° Qz PR S
12 28 JT 55° Qz PR S
JT 55° Qz PR S
100

60

JT 35° Qz PR S
100

80

14 26
JT 55° Qz PR S
JT 55° Qz PR S
JT 55° Qz PR S
15.00
25.00 Hole Terminated at 15.00 m

16 24
Plaza Kuningan
CLIENT : PT Merkeda Mining Servis North Tower, Level 3
ENGINEER : Phil Hall Gedung 88 Tower A
Level 38 Suite GH
PROJECT : Wetar Pyrite Project - Outloading Kota Kasablanka
LOCATION : Wetar, Indonesia Jl Casablanca Raya Kav.88
GRM PROJECT No. : 19 MMS 001 Jakarta 12870
INDONESIA

AREA : Offshore RIG : YSB YSO 01


EASTING : 204381.0 m LOGGED BY : EPS Borehole: DH-03
NORTHING : 9148593.0 m START DATE :
COORD. SYS. : WGS 84 UTM ZoneEND
40 DATE :
SHEET : 1 OF 1
ELEVATION : -2.30 m MSL CHECKED BY :
STATUS :
INCLINATION : -90° CHECKED DATE:
SPT

Rock Fracture

(fractures / m)
Graphic Log

Frequency
Rock RQD (%)
Depth (m)

Samples Rock

Rock TCR (%)


Elevation
(m MSL)

Soil / Rock Material Description

Seating Drive
or Depth Inferred Strength Rock Discontinuity
Soil: TYPE, consistency, colour, grain size, N
Field RL moisture, type. Stratigraphy Estimated Description
Test UCS in MPa

N Value
Rock: TYPE, colour, weathering, grain size,

Blows 1
Blows 2
strength, fracturing, type.

VH
EH
EL
VL
10
20
30
40

10
15
20
M
H
L

5
-2.30 SAND, loose, dark grey - grey,
fine-medium grained, well-graded,
subrounded dense-very dense,
0.50m
poorly cemented, intercalation with 8 9 11 20
gravel, highly weathered
-3

1.50m
10 16 24 40

-4

2.50m
14 24 26 50

-5

3
GRM LIB 1.01.GLB Log GRM BOREHOLE 19 MMS 001 WETAR.GPJ <<DrawingFile>> 12/Dec/2019 19:17 10.01.00.11 Datgel CPT, Photo, Fence and Map, Monitoring Tools

3.50m
50 50

-6

4.50m
15 50 50

-7

-8
6.00m 6.00
6 8 13 15 28
-8.30 BOULDER, grey, hard,
subrounded-rounded,
gravel-boulder sized particles, dry

-9

7.50m
17 18 24 42

-10

-11
9.00
9
-11.30 Hole Terminated at 9.00 m

-12
Plaza Kuningan
CLIENT : PT Merkeda Mining Servis North Tower, Level 3
ENGINEER : Phil Hall Gedung 88 Tower A
Level 38 Suite GH
PROJECT : Wetar Pyrite Project - Outloading Kota Kasablanka
LOCATION : Wetar, Indonesia Jl Casablanca Raya Kav.88
GRM PROJECT No. : 19 MMS 001 Jakarta 12870
INDONESIA

AREA : Offshore RIG : YSB YSO 01


EASTING : 204472.0 m LOGGED BY : EPS Borehole: DH-04
NORTHING : 9148576.0 m START DATE :
COORD. SYS. : WGS 84 UTM ZoneEND
40 DATE :
SHEET : 1 OF 1
ELEVATION : -4.80 m MSL CHECKED BY :
STATUS :
INCLINATION : -90° CHECKED DATE:
SPT

Rock Fracture

(fractures / m)
Graphic Log

Frequency
Rock RQD (%)
Depth (m)

Samples Rock

Rock TCR (%)


Elevation
(m MSL)

Soil / Rock Material Description

Seating Drive
or Depth Inferred Strength Rock Discontinuity
Soil: TYPE, consistency, colour, grain size, N
Field RL moisture, type. Stratigraphy Estimated Description
Test UCS in MPa

N Value
Rock: TYPE, colour, weathering, grain size,

Blows 1
Blows 2
strength, fracturing, type.

VH
EH
EL
VL
10
20
30
40

10
15
20
M
H
L

5
-5 0.50m -4.80 SAND with GRAVEL, dense-very 10 12 24 24
dense, poorly cemented, dark
1.50m grey - grey, fine-medium grained,
dry, well graded, subrounded, 12 24 44 44
intercalation with gravel, highly
2.50m
weathered, from 8 to 8.4m 18 28 50 50
becoming silt
3.50m
23 26 50 50

4.50m
20 23 46 46
5
-10
6.00m
22 23 45 45

7.50m
18 23 44 44
8.00
-12.80 SILT, very loose at top to very stiff,
9.00m high plasticity, dark grey - grey,
20 24 45 45
very sandy, with very fine - fine
9.80 grains of sand, moist
10 -14.60
-15 10.50m BRECCIA, yellowish grey - light
grey, very dense, matrix of SAND, 10 12 24 24
fine - medium grained, well
GRM LIB 1.01.GLB Log GRM BOREHOLE 19 MMS 001 WETAR.GPJ <<DrawingFile>> 12/Dec/2019 19:17 10.01.00.11 Datgel CPT, Photo, Fence and Map, Monitoring Tools

graded, subrounded, dark grey -


12.00m grey, dry, dense - very dense, 17 27 50 50
strongly cemented fragments,
gravel, subrounded - rounded,
13.50m gravel - boulder sized particles,
16 16 50 50
hard, dry, gradually becoming
basalt at 16 to 17 m
15.00m
15 -20
18 15 50 50

16.00
16.50m -20.80 BASALT: dark grey, massive, , low
50

10

20 21 50 50
weathering, very strong, fractured
at random spaces filled with
quartz, schoria at random places,
oxide at random places
100

15

20
-25
JT 35° Qz PR S
100

15

JT 55° Qz PR S
100

75

JT 35° Qz PR S
100 100

24

25 JT 55° Qz PR S
-30
10

JT 35° Qz ST SL
JT 35° Qz PR S
JT 55° Qz PR S
100

JT 55° Qz PR S
82

JT 55° Qz PR S
JT 55° Qz PR S
JT 35° Qz PR S
30.00 JT 55° Qz PR S
30
-35 -34.80 Hole Terminated at 30.00 m
Plaza Kuningan
CLIENT : PT Merkeda Mining Servis North Tower, Level 3
ENGINEER : Phil Hall Gedung 88 Tower A
Level 38 Suite GH
PROJECT : Wetar Pyrite Project - Outloading Kota Kasablanka
LOCATION : Wetar, Indonesia Jl Casablanca Raya Kav.88
GRM PROJECT No. : 19 MMS 001 Jakarta 12870
INDONESIA

AREA : Offshore RIG : YSB YSO 01


EASTING : 204578.0 m LOGGED BY : EPS Borehole: DH-05
NORTHING : 9148555.0 m START DATE :
COORD. SYS. : WGS 84 UTM ZoneEND
40 DATE :
SHEET : 1 OF 1
ELEVATION : -5.30 m MSL CHECKED BY :
STATUS :
INCLINATION : -90° CHECKED DATE:
SPT

Rock Fracture

(fractures / m)
Graphic Log

Frequency
Rock RQD (%)
Depth (m)

Samples Rock

Rock TCR (%)


Elevation
(m MSL)

Soil / Rock Material Description

Seating Drive
or Depth Inferred Strength Rock Discontinuity
Soil: TYPE, consistency, colour, grain size, N
Field RL moisture, type. Stratigraphy Estimated Description
Test UCS in MPa

N Value
Rock: TYPE, colour, weathering, grain size,

Blows 1
Blows 2
strength, fracturing, type.

VH
EH
EL
VL
10
20
30
40

10
15
20
M
H
L

5
0.50m -5.30 SAND with GRAVEL, dry, dense - 1 1 3 4
very dense, poorly cemented, dark
1.50m grey - grey, fine - medium grained,
well graded, subrounded, 2 2 3 5
intercalation with gravel, high
2.50m
weathered from 4.95m - 6.00 m 2 2 2 4
gradually becoming silt
3.50m
2 3 4 7

4.50m
2 5 7 12
-10
5
6.00m 6.00 1 2 2 4
-11.30 SILT, high plasticity, very loose at
top to very stiff at bottom, dark
7.50m grey - grey, very sandy, with very
fine - fine grains of sand, moist 1 8 11 19

9.00m
5 8 12 20

-15
10 10.35
10.50m
-15.65 8 12 14 26
BOULDER, subrounded -
GRM LIB 1.01.GLB Log GRM BOREHOLE 19 MMS 001 WETAR.GPJ <<DrawingFile>> 12/Dec/2019 19:17 10.01.00.11 Datgel CPT, Photo, Fence and Map, Monitoring Tools

rounded, gravel - boulder sized


particles, hard, dry
12.00m
9 18 21 39

13.50m
50 50

-20 15.00m
15 50 50
15.53
-20.83 BASALT: dark grey, massive, , low
JT 55° Qz PR S
100

35

weathering, very strong, fractured


at random spaces filled with JT 35° Qz PR S
quartz, schoria at random places, JT 35° Qz PR S
oxide at random places
100

JT 55° Qz PR S
JT 35° Qz PR S
100

10

-25 JT 35° Qz PR S
20
JT 35° Qz PR S
100

65

JT 55° Qz PR S

JT 35° Qz PR S
100

22

JT 55° Qz PR S
JT 55° Qz PR S
-30 JT 35° Qz ST SL
25 JT 55° Qz PR S
100

30

JT 35° Qz PR S
JT 35° Qz PR S
JT 55° Qz PR S
100

40

JT 55° Qz PR S
JT 35° Qz PR S
JT 35° Qz PR S
100

73

-35 JT 55° Qz PR S
30.00
30
-35.30 Hole Terminated at 30.00 m
APPENDIX B

REPORTS TO TEST PITS

PT Ground Risk Management


PT Ground Risk Management Excavation No.
Plaza Kuningan
North Tower, Level 3
Gedung 88 Tower A
Level 38 Suite GH
TP-01
Kota Kasablanka
Jl Casablanca Raya Kav.88 Page 1 of 1
Jakarta 12870 INDONESIA
Engineering Log - Excavation Project No.: 19 MMS 001

Client: PT Merkeda Mining Servis Commenced: 18/10/2019


Project Name: Wetar Pyrite Project - Outloading Completed: 18/10/2019
Hole Location: Logged By: EPS
Hole Position: 204433.0 m E 9148460.0 m N WGS 84 UTM Zone 40 Checked By:
Equipment Type and Model: PC200 RL Surface: 31.00 m
Excavation Dimensions: Datum: MSL Operator: EPS

Excavation Information Soil Description Observations

Density Index
Classification
Penetration

Consistency
Graphic Log
Samples Material Description Hand
Structure and

Condition
Recovery

Tests soil type: plasticity or particle characteristics, Penetrometer

Moisture
Support

Symbol Additional Observations


Method

secondary and minor components, colour (kPa)


Water

Remarks RL Depth
(m) (m)

100
200
300
400
500
Sandy CLAY, dark-grey to grey, high plasticity,
with very fine grains of sand, moist, very loose
at top to very stiff at bottom
30.5

0.5
30.0

1.0
29.5

1.5
SAND with GRAVEL, dark grey - grey,
fine-medium grained, well graded,
subrounded, dense-very dense, poorly
29.0

2.0 cemented, intercalation with gravel


28.5

2.5
GRM LIB 1.01.GLB Log GRM TEST PIT LOG 19 MMS 001 WETAR.GPJ <<DrawingFile>> 08/Apr/2020 20:59 10.01.00.11 Datgel CPT, Photo, Fence and Map, Monitoring Tools

BASALT, dark grey - grey, very strong,


28.0

3.0 massive, has fractures at random intervals


filled with quartz, has schoria at random
intervals, low weathering, some oxide at
random places
27.5

3.5
27.0

4.0
Hole Terminated at 4.00 m
26.5

4.5

Photo Sketch

Method Penetration Water Samples and Tests Moisture Condition Consistency/Relative Density
N - Natural Exposure No resistance Level (Date) U - Undisturbed Sample D - Dry VS - Very Soft
X - Existing Excavation ranging to D - Disturbed Sample M - Moist S - Soft
BH - Backhoe Bucket refusal Inflow CBR- CBR Mould Sample W - Wet F - Firm
R - Ripper VSt - Very Stiff
E - Excavator H - Hard
Plastic Limit VL - Very Loose
L - Loose
Classification Symbols < PL MD - Medium Dense
Support and Soil Descriptions = PL D - Dense
T - Timbering < PL VD - Very Dense
Based on Unified Soil
Classification System
PT Ground Risk Management Excavation No.
Plaza Kuningan
North Tower, Level 3
Gedung 88 Tower A
Level 38 Suite GH
TP-02
Kota Kasablanka
Jl Casablanca Raya Kav.88 Page 1 of 1
Jakarta 12870 INDONESIA
Engineering Log - Excavation Project No.: 19 MMS 001

Client: PT Merkeda Mining Servis Commenced: 19/10/2019


Project Name: Wetar Pyrite Project - Outloading Completed: 19/10/2019
Hole Location: Logged By: EPS
Hole Position: 204450.0 m E 9148446.0 m N WGS 84 UTM Zone 40 Checked By:
Equipment Type and Model: PC200 RL Surface: 28.00 m
Excavation Dimensions: Datum: MSL Operator: EPS

Excavation Information Soil Description Observations

Density Index
Classification
Penetration

Consistency
Graphic Log
Samples Material Description Hand
Structure and

Condition
Recovery

Tests soil type: plasticity or particle characteristics, Penetrometer

Moisture
Support

Symbol Additional Observations


Method

secondary and minor components, colour (kPa)


Water

Remarks RL Depth
(m) (m)

100
200
300
400
500
Sandy CLAY, dark-grey to grey, high plasticity,
with very fine grains of sand, moist, very loose
at top to very stiff at bottom
27.5

0.5
27.0

1.0
BASALT, dark grey - grey, very strong,
massive, has fractures at random intervals
filled with quartz, has schoria at random
26.5

1.5 intervals, low weathering, some oxide at


random places
26.0

2.0
Hole Terminated at 2.00 m
25.5

2.5
GRM LIB 1.01.GLB Log GRM TEST PIT LOG 19 MMS 001 WETAR.GPJ <<DrawingFile>> 08/Apr/2020 20:59 10.01.00.11 Datgel CPT, Photo, Fence and Map, Monitoring Tools

25.0

3.0
24.5

3.5
24.0

4.0
23.5

4.5

Photo Sketch

Method Penetration Water Samples and Tests Moisture Condition Consistency/Relative Density
N - Natural Exposure No resistance Level (Date) U - Undisturbed Sample D - Dry VS - Very Soft
X - Existing Excavation ranging to D - Disturbed Sample M - Moist S - Soft
BH - Backhoe Bucket refusal Inflow CBR- CBR Mould Sample W - Wet F - Firm
R - Ripper VSt - Very Stiff
E - Excavator H - Hard
Plastic Limit VL - Very Loose
L - Loose
Classification Symbols < PL MD - Medium Dense
Support and Soil Descriptions = PL D - Dense
T - Timbering < PL VD - Very Dense
Based on Unified Soil
Classification System
PT Ground Risk Management Excavation No.
Plaza Kuningan
North Tower, Level 3
Gedung 88 Tower A
Level 38 Suite GH
TP-03
Kota Kasablanka
Jl Casablanca Raya Kav.88 Page 1 of 1
Jakarta 12870 INDONESIA
Engineering Log - Excavation Project No.: 19 MMS 001

Client: PT Merkeda Mining Servis Commenced: 19/10/2019


Project Name: Wetar Pyrite Project - Outloading Completed: 19/10/2019
Hole Location: Logged By: EPS
Hole Position: 204498.0 m E 9148421.0 m N WGS 84 UTM Zone 40 Checked By:
Equipment Type and Model: PC200 RL Surface: 32.00 m
Excavation Dimensions: Datum: MSL Operator: EPS

Excavation Information Soil Description Observations

Density Index
Classification
Penetration

Consistency
Graphic Log
Samples Material Description Hand
Structure and

Condition
Recovery

Tests soil type: plasticity or particle characteristics, Penetrometer

Moisture
Support

Symbol Additional Observations


Method

secondary and minor components, colour (kPa)


Water

Remarks RL Depth
(m) (m)

100
200
300
400
500
Sandy CLAY, dark-grey to grey, high plasticity,
with very fine grains of sand, moist, very loose
at top to very stiff at bottom
31.5

0.5

BASALT, dark grey - grey, very strong,


31.0

1.0 massive, has fractures at random intervals


filled with quartz, has schoria at random
intervals, low weathering, some oxide at
random places
30.5

1.5
Hole Terminated at 1.50 m
30.0

2.0
29.5

2.5
GRM LIB 1.01.GLB Log GRM TEST PIT LOG 19 MMS 001 WETAR.GPJ <<DrawingFile>> 08/Apr/2020 20:59 10.01.00.11 Datgel CPT, Photo, Fence and Map, Monitoring Tools

29.0

3.0
28.5

3.5
28.0

4.0
27.5

4.5

Photo Sketch

Method Penetration Water Samples and Tests Moisture Condition Consistency/Relative Density
N - Natural Exposure No resistance Level (Date) U - Undisturbed Sample D - Dry VS - Very Soft
X - Existing Excavation ranging to D - Disturbed Sample M - Moist S - Soft
BH - Backhoe Bucket refusal Inflow CBR- CBR Mould Sample W - Wet F - Firm
R - Ripper VSt - Very Stiff
E - Excavator H - Hard
Plastic Limit VL - Very Loose
L - Loose
Classification Symbols < PL MD - Medium Dense
Support and Soil Descriptions = PL D - Dense
T - Timbering < PL VD - Very Dense
Based on Unified Soil
Classification System

You might also like