Professional Documents
Culture Documents
METINDO ERASAKTI
DIE TOOL MAKING
PT. METINDO ERASAKTI
DIE TOOL MAKING
1 57832-BZ040 PLAN
IMPROVE DESIGN DTM 100%
REINFORCEMENT RR NO.1 ACT
SEAT LEG FR NO 2 PLAN MATERIAL M/C
ORDER STANDARD COMPONENT & MATERIAL DTM 100%
ACT
OP 10 (ADDITIONAL PLAN
PROCESS ) - PRE ADDITIONAL PROCESS - PRE BENDING ASSEMBLY & SETTING DTM 100%
ACT
BENDING
PLAN
TRYOUT SINGLE PROCESS TIM 100%
ACT
PLAN
FULL HARDEN DTM 100%
ACT
PLAN
ACCURACY UP & FINISHING PROCESS ATM QE & PE
ACT
Reason :
PLAN Reason : Reason : Reason :
PR fiinish Approved ENG Reason :
IMPROVE DESIGN IMAM (PE) PO Rilis Delivered MES Meeting Koordinasi Teknis
100%
ACT 75% Delay Order Material
PLAN MATERIAL M/C
ORDER STANDARD COMPONENT IMAM (PE) 100%
ACT
PLAN
OP 20 BELUM MASUK REQUIRMENTS STANDARD ATM IMPROVE LOWER BASE & UPPER BASE DTM 0%
ACT
PLAN
ASSEMBLY & SETTING SINDU (PE) 0%
ACT
PLAN
TRYOUT SINGLE PROCESS TIM 0%
ACT
PLAN
ACCURACY UP & FINISHING PROCESS ATM QE & PE 0%
ACT
PLAN
IMPROVE DESIGN IMAM (PE) 0%
ACT
PLAN
ORDER STANDARD COMPONENT/ MATERIAL IMAM (PE) 100%
ACT 75%
PLAN MATERIAL M/C
MACHINING ADDITIONAL COMP DTM 100%
ACT
PLAN
OP 30 BELUM MASUK REQUIRMENTS STANDARD ATM IMPROVE LOWER BASE & UPPER BASE DTM 100%
ACT
PLAN
ASSEMBLY & SETTING PAMINTO (DM) 100%
ACT
PLAN
TRYOUT SINGLE PROCESS TIM 100%
ACT
PLAN Reason :
ACCURACY UP & FINISHING PROCESS ATM QE & PE Order di Bulan November - Desember tidak 100%
ACT
PLAN
terimplementasi karena administrasi IA &
JIG DUMMY MAKING JIG DUMMY IMAM (PE) Budget tidak terkonfirmasi.
ACT
PLAN
ORDER VACUM PAD IMAM (PE)
ACT
EQUIPMENT ATM
PLAN
GRIPPER PROCESS & VACUM MAKING & PREPARE GRIPPER IMAM (PE)
ACT
PLAN
TEACHING & TRYOUT IMAM (PE)
ACT