You are on page 1of 1

PT.

METINDO ERASAKTI
DIE TOOL MAKING
PT. METINDO ERASAKTI
DIE TOOL MAKING

PLAN DESEMBER 2022 JANUARI 2023 Status


NO PART NO / PART NAME DIES OP PROBLEM COUNTERMEASURE PIC VS REMARK
ACT 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Prog (%)

1 57832-BZ040 PLAN
IMPROVE DESIGN DTM 100%
REINFORCEMENT RR NO.1 ACT
SEAT LEG FR NO 2 PLAN MATERIAL M/C
ORDER STANDARD COMPONENT & MATERIAL DTM 100%
ACT

PLAN M/C LOWER DIES IPPER BASE


MACHINING PROCESS UPPER & LOWER DIE DTM 100%
ACT MACHINING 1 PRE-FITTING

OP 10 (ADDITIONAL PLAN
PROCESS ) - PRE ADDITIONAL PROCESS - PRE BENDING ASSEMBLY & SETTING DTM 100%
ACT
BENDING
PLAN
TRYOUT SINGLE PROCESS TIM 100%
ACT

PLAN
FULL HARDEN DTM 100%
ACT

PLAN
ACCURACY UP & FINISHING PROCESS ATM QE & PE
ACT
Reason :
PLAN Reason : Reason : Reason :
PR fiinish Approved ENG Reason :
IMPROVE DESIGN IMAM (PE) PO Rilis Delivered MES Meeting Koordinasi Teknis
100%
ACT 75% Delay Order Material
PLAN MATERIAL M/C
ORDER STANDARD COMPONENT IMAM (PE) 100%
ACT

PLAN START (16 COMPONENT )


MACHINING PROCESS UPPER & LOWER DIE DTM 100%
ACT

PLAN
OP 20 BELUM MASUK REQUIRMENTS STANDARD ATM IMPROVE LOWER BASE & UPPER BASE DTM 0%
ACT

PLAN
ASSEMBLY & SETTING SINDU (PE) 0%
ACT

PLAN
TRYOUT SINGLE PROCESS TIM 0%
ACT

PLAN
ACCURACY UP & FINISHING PROCESS ATM QE & PE 0%
ACT

PLAN
IMPROVE DESIGN IMAM (PE) 0%
ACT

PLAN
ORDER STANDARD COMPONENT/ MATERIAL IMAM (PE) 100%
ACT 75%
PLAN MATERIAL M/C
MACHINING ADDITIONAL COMP DTM 100%
ACT

PLAN
OP 30 BELUM MASUK REQUIRMENTS STANDARD ATM IMPROVE LOWER BASE & UPPER BASE DTM 100%
ACT

PLAN
ASSEMBLY & SETTING PAMINTO (DM) 100%
ACT

PLAN
TRYOUT SINGLE PROCESS TIM 100%
ACT

PLAN Reason :
ACCURACY UP & FINISHING PROCESS ATM QE & PE Order di Bulan November - Desember tidak 100%
ACT

PLAN
terimplementasi karena administrasi IA &
JIG DUMMY MAKING JIG DUMMY IMAM (PE) Budget tidak terkonfirmasi.
ACT

PLAN
ORDER VACUM PAD IMAM (PE)
ACT
EQUIPMENT ATM
PLAN
GRIPPER PROCESS & VACUM MAKING & PREPARE GRIPPER IMAM (PE)
ACT

IMAM (PE) & PLAN


ASSEMBLY & SETTING
PAMINTO (DM) ACT

PLAN
TEACHING & TRYOUT IMAM (PE)
ACT

TRYOUT & RUNNING PLAN


TEST CAPACITY & CAPABILITY TIM
ATM ACT

PLAN JANUARI 2023


MASPROO RUNNING TIM
ACT

MEMBER : (21-12- 2022)


1. IBU KIKI
2. BP.SAADI
3..BP.ZABAR
4.BP.NIZAR
5. BP.BILLY
6.IMAM