REPORT JOB SHEET SCHEDULE

PT. BINA SARANA SUKSES


J O B . PMSS
UCR UCR JOB DECSRIPTION C/N DZ236 JOB SCHEDULE SHEET
MODEL S/N MODEL S/N RECONTION UNIT DATE WO INT Wednesday, January 5, 2022 LEAD TIME MONITORING GRAPH
APPROVED
OWNER No : 1
D85E-SS-2 KMT0D035CGXJ17679 D85E-SS-2 DZ236 HM : PT BINA SARANA SUKSES - PMSS
-
Prepared :
WORKING HOURS Plan Flate Rate Actual Flate Rate
180%
Standart Trend
167%
160%

140%

120%
13 INSTALL EG HOOD, GUARDS 4.0 100%
12 INSTALL DRIVE SHAFT 2.0 92% 100% 104%
11 CHECK END PLAY 8.0 88% JIMMY I.
10 REFILL E/G OIL + COOLANT 1.0 71% FGDP PLANT
80%
9 INSTALL PARTS E/H CONNECTED 8.0 69%
8 INSTALL E/G + MOUNTING BOLT 3.0 52%
7 CELANING FRAME/AREA ENGINE 1.0 46% 60% 63%
6 REMOVE E/G 1.0 44%
5 REMOVE ENGINE MOUNTING BOLT 2.0 42% 40%
4 DISCONNECT PART ENGINE CONNECTED (HOSE, PIPE, WIRING) 8.0 38%
3 DRAIN E/G OIL, COOLANT 1.0 21%
2 REMOVE E/G HOOD & GUARD 4.0 19% 20% 21% 21% 21% 21% 21%
1 CLEANING, WASHING & REPOSITION 5.0 10%
Total Standart Working Hours 48 0% 0%
Grand total day 4.00
100% 0 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan
5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan 20-Jan 21-Jan ###
Day 1 3 5 8
Departemant RM comex Flate Rate 10 30 50 80 - - - - - - - - - - - - -
Section Recondition Unit Plan Flate Rate 21% 63% 104% 167% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Sub Section Actual Hours 10 0 0 0 0 0 0 0 0
Actual Flate Rate 21% 21% 21% 21% 21% 21% 21% 21% 21% 21% 21% 21% 21% 21% 21% 21% 21%
No Man Power Position Kendala Approved
1 DIDIN S. Pengawas Man Power 2 2 0 0 0 0 0 0 0 Approved
2 F. ROBBY Mekanik Man Hours 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 EVA SETIAWAN Mekanik Over Time 0.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0
4 Code
Delay
5 Hours
6
7 A : Pending parts F : Doing another job K : Wait for repair
8 B : Pending man power G : Waiting component for other Section L : Waiting agreement quotation SULTHON ARAFAT
C : Tools not available H : Redo in process M : Waiting supply new parts, old parts or fabrica KABAG RM PMSS
E

9
D
CO

10 D : Pending Test & PPM I : Redo component local when recieving N : Pending others
11 E : Waiting local made component J : Canibal O : Holiday