AS-BUILT DRAWING
ENGINEER: PROJECT IN CHARGE: DRAWN : PROJECT TITLE : OWNER : SHEET CONTENTS :
DATE SEPTEMBER 2018
TAISEI PHILIPPINE CONSTRUCTION INC. ULYSSES B. GEMENTIZA ULYSSES B. GEMENTIZA BM / ESA CONSTRUCTION OF NIPPON PREMIUM NIPPON PREMIUM BAKERY INC.
TWENTY THIRD FLOOR EQUITABLE BANK TOWER BAKERY SANTO TOMAS PROJECT LPG TANK PIPING SYSTEM EQUIPMENT DWG. NO. P - 17
8751 PASEO DE ROXAS, SALCEDO VILL., MAKATI CITY REG.No. MP-3004 DATE: 03.26,2001 REG.No. MP-3004 DATE: 03.26,2001 APPROVED :
TEL. NOS. 886-0670 TO 79 FAX NO. 886-0663
6607910 01.03.2018 6607910 01.03.2018
SCHEDULE & SCHEMATIC DIAGRAM A1 NTS
PTR No. DATE: PTR No. DATE: LOCATION : LOT 10 BLK 2, FPIP II - SEZ, SAN RAFAEL
U. GEMENTIZA STO. TOMAS, BATANGAS APPROVED BY : TOSHIYA TANIGUCHI SCALE
T.I.N. 106-878-446 ISSUED AT: MAKATI CITY T.I.N. 106-878-446 ISSUED AT: MAKATI CITY
PRESIDENT A3 NTS
FILE PATH: \\DEMET\USERS\PUBLIC\02 NIPPON SJ PROJECT\05 AS BUILT DRAWING\OWNER AS-BUILT DRAWING\PLUMBING\P-17 LPG PIPING SCHEMATIC DIAGRAM; PLOT: 10/8/2018 11:26:10 AM LAST SAVED: asus
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11
VP LPT
1 1
UP
LPG TANK PAD
W
S
N
E
S S S S S S S S
2018 2018 2018 2018 2018 2018 2018 2018
AV
GC
Y6
PUMP ROOM DISTRIBUTION OFFICE ANTE RM SHIPPING ANTE RM MATERIAL WASTE
ANTE ROOM OFFICE STORAGE
DISPOSAL
STOCK AREA
ELECTRICAL ROOM
S
2018
DISPOSAL
STOCK AREA
FREEZER-1
SHIPPING AREA
FREEZER-2
FRIDGE-1
SILO
Y4
2018
MEASUREMENT ROOM
S
2018
LP
COOLING RM-2
Y2A
S
2018
BREAD
PACKAGE RM-1 FERMENT ROOM-1
FRIDGE-4 29
COOLING RM-1
FRIDGE-3
GD
Y2
BOILER ROOM
BT
1 LP
BT GD
ITEM LEGEND
FUTURE SPACE
2
Y1B M LPG GAS METER
CORRIDOR 1-2
S
2018
S
2018
S
2018
ITEM MACHINE NAME
29 H.I.2.8x17.5PT TUNNEL OVEN
AS-BUILT DRAWING
ENGINEER: PROJECT IN CHARGE: DRAWN : PROJECT TITLE : OWNER : SHEET CONTENTS :
DATE SEPTEMBER 2018
TAISEI PHILIPPINE CONSTRUCTION INC. ULYSSES B. GEMENTIZA ULYSSES B. GEMENTIZA BM / ESA CONSTRUCTION OF NIPPON PREMIUM NIPPON PREMIUM BAKERY INC.
TWENTY THIRD FLOOR EQUITABLE BANK TOWER BAKERY SANTO TOMAS PROJECT
1FL LPG PIPING SYSTEM LAYOUT
DWG. NO. P - 18
8751 PASEO DE ROXAS, SALCEDO VILL., MAKATI CITY REG.No. MP-3004 DATE: 03.26,2001 REG.No. MP-3004 DATE: 03.26,2001 APPROVED :
TEL. NOS. 886-0670 TO 79 FAX NO. 886-0663 A1 1 : 200 MTS
PTR No. 6607910 DATE: 01.03.2018 PTR No. 6607910 DATE: 01.03.2018 LOCATION : LOT 10 BLK 2, FPIP II - SEZ, SAN RAFAEL
U. GEMENTIZA STO. TOMAS, BATANGAS APPROVED BY : TOSHIYA TANIGUCHI SCALE
T.I.N. 106-878-446 ISSUED AT: MAKATI CITY T.I.N. 106-878-446 ISSUED AT: MAKATI CITY
PRESIDENT A3 1 : 400 MTS
FILE PATH: \\DEMET\USERS\PUBLIC\02 NIPPON SJ PROJECT\05 AS BUILT DRAWING\OWNER AS-BUILT DRAWING\PLUMBING\P-18 1FL LPG SYSTEM LAYOUT; PLOT: 10/8/2018 11:26:19 AM LAST SAVED: asus