You are on page 1of 2

LEGEND :

1 LPG GAS LEAK DETECTION FLOW DIAGRAM

AS-BUILT DRAWING
ENGINEER: PROJECT IN CHARGE: DRAWN : PROJECT TITLE : OWNER : SHEET CONTENTS :
DATE SEPTEMBER 2018
TAISEI PHILIPPINE CONSTRUCTION INC. ULYSSES B. GEMENTIZA ULYSSES B. GEMENTIZA BM / ESA CONSTRUCTION OF NIPPON PREMIUM NIPPON PREMIUM BAKERY INC.
TWENTY THIRD FLOOR EQUITABLE BANK TOWER BAKERY SANTO TOMAS PROJECT LPG TANK PIPING SYSTEM EQUIPMENT DWG. NO. P - 17
8751 PASEO DE ROXAS, SALCEDO VILL., MAKATI CITY REG.No. MP-3004 DATE: 03.26,2001 REG.No. MP-3004 DATE: 03.26,2001 APPROVED :
TEL. NOS. 886-0670 TO 79 FAX NO. 886-0663
6607910 01.03.2018 6607910 01.03.2018
SCHEDULE & SCHEMATIC DIAGRAM A1 NTS
PTR No. DATE: PTR No. DATE: LOCATION : LOT 10 BLK 2, FPIP II - SEZ, SAN RAFAEL
U. GEMENTIZA STO. TOMAS, BATANGAS APPROVED BY : TOSHIYA TANIGUCHI SCALE
T.I.N. 106-878-446 ISSUED AT: MAKATI CITY T.I.N. 106-878-446 ISSUED AT: MAKATI CITY
PRESIDENT A3 NTS
FILE PATH: \\DEMET\USERS\PUBLIC\02 NIPPON SJ PROJECT\05 AS BUILT DRAWING\OWNER AS-BUILT DRAWING\PLUMBING\P-17 LPG PIPING SCHEMATIC DIAGRAM; PLOT: 10/8/2018 11:26:10 AM LAST SAVED: asus
X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11

VP LPT
1 1

WWT TANK WWT FACILITY

UP
LPG TANK PAD

W
S

N
E
S S S S S S S S
2018 2018 2018 2018 2018 2018 2018 2018

AV

GC
Y6
PUMP ROOM DISTRIBUTION OFFICE ANTE RM SHIPPING ANTE RM MATERIAL WASTE
ANTE ROOM OFFICE STORAGE
DISPOSAL
STOCK AREA

ELECTRICAL ROOM
S
2018

DISPOSAL
STOCK AREA

PALLET STORAGE MATERIAL STORAGE


Y5
S
2018

FREEZER-1

SHIPPING AREA
FREEZER-2

FRIDGE-1
SILO

ANTE RM-3 FRIDGE-2


S

Y4
2018

MEASUREMENT ROOM
S
2018

LP

SHOES CHANGE AREA PRODUCTION OFFICE 36


SWEETEND BUN
Y3
CORRIDOR-1
GD OVEN ROOM-1 FABRICATION RM-1
WASHING RM-1

COOLING RM-2
Y2A
S
2018

BREAD
PACKAGE RM-1 FERMENT ROOM-1
FRIDGE-4 29
COOLING RM-1

FRIDGE-3
GD
Y2

BOILER ROOM
BT
1 LP

BT GD
ITEM LEGEND
FUTURE SPACE
2
Y1B M LPG GAS METER
CORRIDOR 1-2

AV AUTO SHUT OFF VALVE


ANTE RM-1
GD

BREAD CRUST STO


COMPRESSOR RM WORK SHOP RM Y1A LP SECOND STAGE REGULATOR (LP)

GD GAS LEAK DETECTOR


Y1
S
2018
GC GAS DETECTOR CONTROLLER
FUTURE EXPANSION

S
2018
S
2018
S
2018
ITEM MACHINE NAME
29 H.I.2.8x17.5PT TUNNEL OVEN

36 H.I.2.0x14.OPT TUNNEL OVEN


1 1FL LPG PIPING SYSTEM LAYOUT

AS-BUILT DRAWING
ENGINEER: PROJECT IN CHARGE: DRAWN : PROJECT TITLE : OWNER : SHEET CONTENTS :
DATE SEPTEMBER 2018
TAISEI PHILIPPINE CONSTRUCTION INC. ULYSSES B. GEMENTIZA ULYSSES B. GEMENTIZA BM / ESA CONSTRUCTION OF NIPPON PREMIUM NIPPON PREMIUM BAKERY INC.
TWENTY THIRD FLOOR EQUITABLE BANK TOWER BAKERY SANTO TOMAS PROJECT
1FL LPG PIPING SYSTEM LAYOUT
DWG. NO. P - 18
8751 PASEO DE ROXAS, SALCEDO VILL., MAKATI CITY REG.No. MP-3004 DATE: 03.26,2001 REG.No. MP-3004 DATE: 03.26,2001 APPROVED :
TEL. NOS. 886-0670 TO 79 FAX NO. 886-0663 A1 1 : 200 MTS
PTR No. 6607910 DATE: 01.03.2018 PTR No. 6607910 DATE: 01.03.2018 LOCATION : LOT 10 BLK 2, FPIP II - SEZ, SAN RAFAEL
U. GEMENTIZA STO. TOMAS, BATANGAS APPROVED BY : TOSHIYA TANIGUCHI SCALE
T.I.N. 106-878-446 ISSUED AT: MAKATI CITY T.I.N. 106-878-446 ISSUED AT: MAKATI CITY
PRESIDENT A3 1 : 400 MTS
FILE PATH: \\DEMET\USERS\PUBLIC\02 NIPPON SJ PROJECT\05 AS BUILT DRAWING\OWNER AS-BUILT DRAWING\PLUMBING\P-18 1FL LPG SYSTEM LAYOUT; PLOT: 10/8/2018 11:26:19 AM LAST SAVED: asus