You are on page 1of 2

Course: Software Project Management Assignment No: 01

Teacher: Muhammad Asif Saleem Date:____________________

Instructions:

 The assignment should be submitted within deadline


 Late submission will be considered as Not Submitted.
 There is zero tolerance regarding plagiarism
 Dead line 03 April 2020.

Q1: The project management processes are a part of those project management knowledge areas. All


of these project management processes belong to five major project management process groups.
These project management process groups are called initiating, planning, executing, monitoring and
controlling and closing.
1) Elaborate these initiating, planning, executing, monitoring and controlling and closing.
2) Map these to knowledge areas.
Hint: - Take your final year project as example and solve these two questions as per your FYP.

Guidelines:

Page size A4 size only


Alignment Justify
Title 24pt Times New Roman Align: Centre
Page Margin 1 “ All sides
Font Use only 12pt Times New Roman for the whole paper
Figure Caption Font- 10”, Lower case And Write Below the Figure, Position-
center.
Table Caption Font- 10”, Lower case And Top of the Table, position center.
Paragraph Paragraph indentation By- 0.2”
Line Spacing 1.5, Header 0.5” Footer 0.3”

The document must be in word format, other formats like pdf or any other shall not be accepted.
The format of the paper should be as follows: 
 Title of the study (prepare title as per your fyp and project management)
 Full name of author(s) (Group members will be authors)
 Name of Department
 Name of Institution
 Abstract (Brief your final year project along with application of Project management
knowledge areas.250 words max)
 Keywords (Most repeated words but which your idea be highlighted)
 Introduction (Brief your final year project along with application of Project management
knowledge areas in details (two paragraph))
 Literature Review
 Theoretical Model/Framework and Methodology ( discuss your FYP Metholody here)
 Data analysis/Implementation/Simulation
 Results/ Discussion and Conclusion (Brife your projects result.)
 References.

Plagiarism Policy:
If the report has a similarity index <=19%, then the benefit of doubt may be given to the
author but, in case, any single source has a similarity index >= 5% without citation then it
needs to be revised.

You might also like