Central Railway

Details of newly commissioned TSS


Name of No. of Connecting medium Data No. of No. of No. of Remarks
TSS channels transfer circuits bays Transf
capabilitie coming from made at ormer
s GSS to TSS GSS bays
at TSS
Miraj TSS 1 (E1) Upto OFC hut fibre optic 2 MBPS Single circuit -* 2 *It is LILO line.
cable & from OFC hut to
TSS location 6 quad cable
Martur TSS 1( E1) Upto OFC hut fibre optic 2 MBPS Single circuit -* 2 *It is LILO line.
cable & from OFC hut to
TSS location 6 quad cable
Chandur 1 (E1 ) Upto OFC hut fibre optic 2 mbps Double circuit 2 1
bazaar TSS cable & from OFC hut to
TSS location 6 quad cable
Seawood 1 (E1) Upto OFC hut fibre optic 2 MBPS Double circuit 2 2
TSS cable & from OFC hut to
TSS location 6 quad cable
Salgare TSS Single circuit 2 TSS under
- commissioning
Jite TSS Double circuit - * 2 *It is LILO line.
TSS under
commissioning