TITLE : CONDUCTIVITY METER CALIBRATION PROCEDURE

Document No. Rev. No. Issue No. Date of Issue Page No.
0 1 01-Jan-2019 2 of 9

REVISION RECORD SHEET


NOTES

i) Revisions after Rev. 0 are denoted by a vertical line in the left hand margin
against the revised text, with the revision number displayed next to the revision
line as shown on the left.

ii) Revision numbers are A, B, C, etc. up to the issue for management approval
and implementation, which is Rev. 0. Subsequent revisions shall be 1, 2, 3,
etc.

No. Date Description of Revision Prepared Review Approved

Issued for approval &


0 01-Jan-2019 MS JR JC
implementation

Page : 2 of 9
TITLE : CONDUCTIVITY METER CALIBRATION PROCEDURE

Document No. Rev. No. Issue No. Date of Issue Page No.
0 1 01-Jan-2019 3 of 9

Table of Contents

S/No. Description Page No.

1.0 Purpose 4

2.0 Scope 4

3.0 Reference 4

4.0 Definitions 4

5.0 Responsibilities 4

6.0 Calibration Conditions 4

7.0 General Guidelines 4

8.0 Calibration Procedure 5

9.0 Records 5

10.0 Attachments 5

Page : 3 of 9
TITLE : CONDUCTIVITY METER CALIBRATION PROCEDURE

Document No. Rev. No. Issue No. Date of Issue Page No.
0 1 01-Jan-2019 4 of 9

1.0 PURPOSE
1.1 The purpose of this work instruction is to ensure that standard practices /
methods of Calibration are followed to obtain reproducible and comparable
results and this document shall be revised as and when required to meet
specific requirements of the project to become a project specific work
instruction.

2.0 SCOPE
2.1 This work instruction is applicable for Calibration Laboratory to carryout
calibration of conductivity meter at Lab. temperature as per applicable
international standards/methods.

3.0 REFERENCE
3.1 Standard Conductivity Solutions.
3.2 Documents used: Conductivity Meter User Manual.

4.0 DEFINITIONS
4.1 Conductivity: The conductivity (or specific conductance) of an electrolyte
solution is a measure of its ability to conduct electricity.
4.2 UUT : Unit Under Test.

5.0 RESPONSIBILITIES
5.1 All the Operators/Technicians perfoming the Calibration shall be trained by.

6.0 CALIBRATION CONDITIONS


6.1 Lab. Temperature : (20±2) °C
6.2 Relative Humidity : (<70) % RH

7.0 GENERAL GUIDELINES


7.1 The calibration should be performed in the controlled environment only. Both
the UUT and Reference Standard equipment should be placed in controlled
environmental condition as mentioned above for at least 30 min warm up.

7.2 UUT should be inspected visually before starting the calibration. Visual
inspection is done for:
Page : 4 of 9
TITLE : CONDUCTIVITY METER CALIBRATION PROCEDURE

Document No. Rev. No. Issue No. Date of Issue Page No.
0 1 01-Jan-2019 5 of 9

 Any physical damage in the conductivity probe

 Proper functioning of push buttons

 Proper Display

 Cleanliness of conductivity probe

8.0 CALIBRATION PROCEDURE


8.1
9.0 RECORDS
9.1 Measurement/reading shall be recorded in the appropriate Check
List/Formats given the Attachment.

9.2 The test report should contain the following information as minimum.
 Client/Customer Name

 Instrument Manufacturer, Make, Model, Range, Serial No & Accuracy

 Test results
10.0 ATTACHMENT

S.No Format No. Description

1 Conductivity Meter

Page : 5 of 9