Professional Documents
Culture Documents
1893 - TST Document DV 4876 Style Tags 001
1893 - TST Document DV 4876 Style Tags 001
TimelREDLINE OFFLINEine
The proposed 6 month engagement start date is 01st November 2016 and end date is 30th
April 2017
123
1. It is expected that data from source is already cleansed so no data cleansing efforts
are considered
a. TESTINREDLINEG
b. Test Data
c. Test Data
d. Test Data
1. Test Data
2. Test Data
3. Test Data
4. Test Data
e. Test Data
f. Test Data
2. Test Data creation for SIT and UAT is not in scope; data from live systems would
be used for SIT and UAT
3. Automated testing of data loads, user concurrency and load balancing is considered
as out of scope
5. Any front end report modification/validation using Veeva ODS data is not covered
in this estimation (There will be separate estimation provided for this)
6. Any integrations not mentioned in the URS shall be considered as out of scope
7. Performing UAT is out of scope, however, UAT support will be provided
Trial and error methods (business logic and table structure changes) will not be accepted
during implementation and changes will be treated as a Change Request and estimation will
be provided accordingly
NNI proposed test management tool will be used for defect reporting and tracking
1.4. Dependencies
General Dependencies
The required environments access will be provided to Cognizant team members before start
of the project
All infrastructure, database, network access and application licenses should be in place before
the project starts.
All measures are assumed to be available in the data source and for those which may need to
be calculated, the Business Logic and Calculation Formulas need to be provided by the SMEs
/ Business Analysts
Cognizant team will seek Vava implementation partner team’s involvement to understand
data feeds
Cognizant has access to all existing artifacts, source code, data and documents that will help
understand the overall requirement
Administrative support to be provided for all the respective technologies during project
execution
Data refresh frequency needs to be provided for each dashboard before design phase.
Relationship between the data source system (Flat Files) has to be provided before
commencement of design.
☒ option1
☐ option2
☐ option3
☐ option4
Informatica PowerCenter
GreenPlum
Siperian
Oracle
Tidal
Cognizant intends to keep Novo Nordisk constantly updated on the status of this engagement
with up to date and actionable information. Cognizant would work with No Disk to determine
the necessity, frequency, target audience of various communication plans required for each
engagement.
There will be regular status calls and the attendees will include:
The following personnel have been designated as project managers with regard to the
services contemplated herein:
☒ choice1
☐ choice2
☐ choice3
☐ choice4
SECTION 3: DELIVERABLES