General Solution
but Suggested Solution
Causing unwanted effect
Pumping Tests and Well Theory
Unconfined Aquifer = Free Well
Pumping Tests and Well Theory
Confined Aquifer
Common Methods of Dewatering
(1) Open sumps and Ditches
(2) Well Points Well Points
Kali Cideng
PG-05
PG-02
IN-02
PZ-03
IN-04
PZ-01
PZ-04
IN-01
PG-01 PG-06
Legend
IN-05 Inklinometer
PZ-05 PG-07
PG-08
Patok Geser
Piezometer
Summary on Case 5 : Counter measures
The main risk is excavation next to a river - prepare 2 pumps next to the
river then discharge back to the river
Information on excavation :
- Depth : 3 basement 12-14 m
- Protection : Secant Pile w/ anchor
- Dewatering : 5 pumps @ 300 l/min
The unwanted effect of dewatering and its counter measures
Case 6 : Excavation in loose sand with protection secant piles
Soil Investigation for design:
- Number of drilling 4 @ 35-60 m
- 2 layers of sand upper loose sand,
lower medium to dense sand
The unwanted effect of dewatering and its counter measures
Case 6 : Excavation in loose sand with protection secant piles
Cross section of Protection System
Initial elevation : + 18. 600 m
Final elevation : + 6.600 m
Berm : + 10.00 m
Secant Piles diam 800, c/c 1.2 m
Bentonite 600 mm
Length : 30.5 m
The unwanted effect of dewatering and its counter measures
Case 6 : Excavation in loose sand with protection secant piles
Deep Wells and Monitoring System
Number of Deep Well : 5
Tip elevation : + 6.600 m
Number of Piezometers : 4
Number of Inclinometers : 4
Number of Recharge Well : 4
Area of excavation : 4000 m2
The unwanted effect of dewatering and its counter measures
Case 6 : Excavation in loose sand with protection secant piles
Piezometer 4
Initial elev : - 3.00 m
Final elev : -6.00 m
to -7.0 m
The unwanted effect of dewatering and its counter measures
Case 6 : Excavation in loose sand with protection secant piles
Inclinometer 4
Maximum deflection : 80 mm
The unwanted effect of dewatering and its counter measures
Case 6 : Excavation in loose sand with protection secant piles
FK = icr / i exit
= 0.75 / 0.2
= 3.75
The unwanted effect of dewatering and its counter measures
Case 6 : Excavation in loose sand with protection secant piles
Comparison of water elevation in deep well and point outside excavation:
Pumping were
terminated
Visual Inspection of the Building Damages
Building no 2
Building no 3
Visual Inspection of the Building Damages
Building no 5
Building no 6
Visual Inspection of the Damaged Building
Building no 9 Wisma Mandiri
Building no 14 Building no 7
The unwanted effect of dewatering and its counter measures
Case 6 : Excavation in loose sand with protection secant piles
4 4 4 4 4 4
5 5 5 5 5 5
6 (7) Sand to silty sand 6 6 6 6 6
7 7 7 7 7 7
8 8 8 8 8 8
(3) Clays 9 9 9 9 9
9
10 10 10 10 10 10
(3) Clays
11 11 11 11 11 11
12 12 12 12 12 12
13 13 13 13 13 13
14 14 14 14 14 14
15 15 15 15 15 15
16 16 16 16 16 16
17 17 17 17 17 17
18 18 18 18 18 18
19 (8) Sand to silty sand 19 19 19 19 19
20 20 20 20 20 20
21 21 21 21 21 21
22 22 22 22 22 22
23 23 23 23 23 23
24 24 24 24 24 24
25 25 25 25 25 25
26 26 26 26 26 26
27 27 27 27 27 27
28 28 28 28 28 28
29 29 29 29 29 29
30 30 30 30 30 30
4 4 4 4 4 4
5 5 5 5 5 5
(7) Sand to silty sand
6 6 6 6 6 6
(7) Sand to silty sand
7 7 7 7 7 7
8 8 8 8 8 8
(8) Sand to silty sand
9 9 9 9 9 9
10 10 10 10 10 10
(7) Sand to silty sand
11 11 11 11 11 11
12 (7) Sand to silty sand 12 12 12 12 12
(7) Sand to silty sand
13 13 13 13 13 13
(5) Clayey silt to silty clay
14 14 14 14 14 14
(5) Clayey silt to silty clay
15 15 15 15 15 15
(3) Clays
16 16 16 16 16 16
17 (5) Clayey silt to silty clay 17 17 17 17 17
18 18 18 18 18 18
(5) Clayey silt to silty clay
19 19 19 19 19 19
(5) Clayey silt to silty clay
20 20 20 20 20 20
21 21 21 21 21 21
22 (6) Sandy silt to clayey silt 22 22 22 22 22
23 23 23 23 23 23
24 24 24 24 24 24
25 25 25 25 25 25
26 26 26 26 26 26
(6) Sandy silt to clayey silt
27 27 27 27 27 27
28 28 28 28 28 28
29 29 29 29 29 29
30 30 30 30 30 30
4 4 4 4 4 4
(3) Clays
5 5 5 5 5 5
(3) Clays
6 (3) Clays 6 6 6 6 6
7 7 7 7 7 7
8 (4) Silty clay to clay 8 8 8 8 8
9 9 9 9 9 9
10 10 10 10 10 10
11 11 11 11 11 11
12 12 12 12 12 12
13 13 13 13 13 13
(3) Clays
14 14 14 14 14 14
15 15 15 15 15 15
16 16 16 16 16 16
17 17 17 17 17 17
18 (5) Clayey silt to silty clay 18 18 18 18 18
19 19 19 19 19 19
20 20 20 20 20 20
21 21 21 21 21 21
22 (3) Clays 22 22 22 22 22
23 23 23 23 23 23
24 24 24 24 24 24
25 25 25 25 25 25
26 26 26 26 26 26
27 27 27 27 27 27
28 28 28 28 28 28
29 29 29 29 29 29
30 30 30 30 30 30
Drawdown 1 m
Drawdown 2 m
Summary of Settlement Analysis Results
The unwanted effect of dewatering and its counter measures
Case 6 : Excavation in loose sand with protection secant piles
COUNTER MEASURES
EMERGENCY :
- Most important is to stop leakage and reduce
seepage (done by installation of sheetpile and grout)
- Backfill by compacted selected soils
- Continuously monitoring ground water level and settlement
LONG TERM AND FINAL SOLUTION
- redesign into 2 level basement instead of 3 level
- abandoned bored piles driven piles
Countermeasure using sheet piles and grouting
Grouting
Sheetpile
4.5 m
7.5 m
Change the bored piles into driven piles
Other issues to resolve : liquefaction potential
CPTu result before and after piling
CPTu-01 CPTu-02
Other issues : Liquefaction Potential
CPTu results before and after piling
CPTu-07
CPTu-06
CPTu-05
LOKASI AREA JAKARTA PUSAT
Outline
LOKASI AREA
REVITALISASI TIM
PARAMETER TANAH
Gedung
ANALISIS DENGAN
PARAMETER WSP (PAK Gedung
WAYAN) Parkir
• Video Pengambilan Data N-SPT pada Proyek TIM
• Catatan Nilai N-SPT & Contoh Sampel Tanah pada Proyek TIM
• Menteng Park
Galian di daerah Menteng jakarta
REVIEW GALIAN (PODIUM – MAT FOUNDATION)
Dikarenakan terjadinya penurunan pada area sekitar, maka dilakukan analisis evaluasi
dampak dari galian yang telah dilakukan terhadap lingkungan sekitar.
Outline Analisis dilakukan pada area potongan A-A.
PENDAHULUAN
Secant Pile SC-3
KONDISI GEOLOGI Ø880
Arcadia
KESIMPULAN Potongan A-A
REVIEW DATA MONITORING (EKSTENSOMETER TAMBAHAN)
Pada titik EX-02 terjadi heaving sebesar 31.5 mm pada SP-01 dengan initial depth – 6 m dan di SP-02
sebesar 14 mm dengan initial depth – 19 m.
Sketch No.
EX-01 EX-02
Outline of
Extensometer
Extensometer
Position
Component
[Depth, m]
PENDAHULUAN
Inclinometer Reading (IN-02) SPIDER
KONDISI GEOLOGI MAGNETIC 6 6
INCLINOMETER IN-02 SP-01
A-A
A- A Cumulative Displacement (mm)
UJI PENYELIDIKAN TANAH -50 -40 -30 -20 -10 0 10 20 30 40 50 SPIDER
TERDAHULU 0 El : -1.45 m MAGNETIC 11 19
Silty Clay (Soft) SC-1 SP-02
(Ø 880)
UJI PENYELIDIKAN TANAH 5
TAMBAHAN
10 DATUM MAGNETIC 34.6 34.5
Silty Clay El = -11.85 m Not to scale
LAYOUT SECANT PILE (Very Soft) EX-02
15
Extensometer EX-02
REVIEW DATA L = 27.05 m
Depth (m)
Change (mm)
MONITORING TAMBAHAN 30
0
8 10 9 14
Silty Sand
NSPT = 50
(Dense)
PENDAHULUAN
Outline
PENDAHULUAN
KONDISI GEOLOGI
REVIEW DATA
MONITORING TERDAHULU
REVIEW DATA
MONITORING TAMBAHAN
ANALISIS GEOTEKNIK
KESIMPULAN
Depth (m)
Mat Foundation 20 L = 27.05 m
El = - 13.45 m
Mat Foundation
Silty Clay
25
Silty Clay (Medium) El : -28.5 m
NSPT = 10 30
(Medium)
Silty Clay
Silty Clay (Stiff) 35
(Stiff) NSPT = 20
40
Silty Sand Silty Sand
NSPT = 50
(Dense) (Dense)
45
Sketch No.
• Apartemen di daerah Menteng of
Extensometer
Extensometer
EX-01 EX-02
Position
Component
[Depth, m]
10
Silty Clay El = -11.85 m DATUM MAGNETIC 34.6 34.5
(Very Soft) Not to scale
15 EX-01
Depth (m)
Change (mm)
3.5 2.5
(Stiff) 35
0
0 5 4
40 1 1
-0.5 -1
Silty Sand -3
-10
(Dense)
45 DATUM
-20
15-Dec-18 22-Dec-18 29-Dec-18 5-Jan-19 12-Jan-19 19-Jan-19
Date
Conclusion Summary
Dewatering and Dewatering Deficiency may cause unwanted
effect that can cause failures, delay and economical loss