VACUUM RELIEF VALVE

MODEL : VV-E-65~200
VV-S-65~125
VV-L-65~125
( IMO MSC/Circ.677 and ISO 15364 )

 NIIKURA KOGYO Co.,LTD. IM-E-IMJ-03


h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
FOLLOW THE INSTRUCTIONS
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PRECAUTION TO KEEP SAFETY BEFORE WORKING

IMPORTANT PROCEDURE

 WARNING
1. Do not use fire during overhauling.
2. Do not modify to any part of construction.
3. Do not paint on flame screens.
4. Do not cover the valve with any material.

 NOTICE
1. Do not carry out dismantling during running

TRANSPORTATION AND INSTALLATION

 NOTICE
1. Do not give impact and turn it over.
2. Do not put anything on.
3. Do suspend and keep hold by using lifting device for removal
and installation.

CONTENTS Page
1. SUMMARY OF FUNCTION AND FEATURE 1~2
2. INSTALLATION 3
3. INSPECTION / MAINTENANCE 3~4
4. DISASSEMBLING AND REASSEMBLING 4~6
5. CHECK POINT AND SERVICING AT OVERHAUL 6~7
6. AIR PRESSURE AND OPERATION TEST AFTER OVERHAUL
AND REASSEMBLING. 8
7. Re : TEST RESULT 8
8. GENERAL ASSEMBLY DRAWING 9~10
9. MANUFACTURES QUALITY CERTIFICATION 11
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
1. SUMMARY OF FUNCTION AND FEATURE
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

Vacuum relief valve VV is installed on cargo storage tanks, and intended


to relieve excessive internal vacuum created by thermal variation and
product movement out of tank. The VV is furnished with flame screens
to provide promotion against excessive vacuum while accidental ignition
of flammable product vapor from external sources.
The device is satisfied by rules in accordance with IMO MSC/Circ.677
requirement Inter National Standard ISO 15364 : 2000.

(1) Vacuum relief valve VV consist of body with connection flange at side-
wise, cover, valve disc, flame screen, dash plate, lifting check handle.

(2) When the vacuum in tank reaches the resetting at which the valve is
open, the atmospheric pressure on the internal disc area overcomes to
disc loading weight. As flame screen are fitted at vacuum inlets, it can
prevent the passage of flame into a cargo tank.

(3) Dash plate protected screens is combined with preventing from sea,
wave for screen.

(4) We can confirm operation of valve through N (normal), O (open) of


indicator by handling of check lift lever.

(5) The device protecting cargo tanks containing crude oil, Petroleum
products and flammable chemicals.
Please be careful, do not use for Chemical Tankers dedicated to the
carriage of products with MESG less than 0.9 mm.

(6) NIIKURA VV Standard materials is specified as follows.


NAME OF PARTS SPEC. E SPEC. S SPEC. L
BODY SS400 SUS316 SUS316L
COVER SS400 SUS316 SUS316L
VALVE SUS316L SUS316L SUS316L
SCREEN SUS316L SUS316L SUS316L
O-RING FKM PTFE PTFE
INTERNAL PAINT PE 200μ --- ---

3
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
(7) Flow capacity
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

Model : VV-E UNIT : Nm3/h


SETTING Vacuum
MODEL VV-E-
PRESS. PRESS.
kPa kPa 65 80 100 125 150 200 250
-5.0 440 700 1240 1950 2415 3700 6100
-3.5 -7.0 720 1070 1720 2620 3800 5830 8700
-12 1040 1500 2400 3640 5670 8230 11400
-7.0 370 740 1260 2050 2600 4230 7450
-5.0 -10 720 1170 1980 3100 4600 6400 10400
-12 870 1375 2340 3640 5470 7300 11400
-8 120 230 620 1220 1330 2430 5800
-7.0 -10 370 610 1320 2280 3000 4900 9600
-14 710 1120 2180 3800 4900 7060 12300

Model : VV-S and VV-L UNIT : Nm3/h


SETTING Vacuum
MODEL VV-S and VV-L
PRESS. PRESS.
kPa kPa 65 80 100 125
-5.0 440 700 1240 1950
-3.5 -7.0 720 1070 1720 2620
-12 1040 1500 2400 3640
-7.0 370 740 1260 2050
-5.0 -10 720 1170 1980 3100
-12 870 1375 2340 3640
-8 120 230 620 1220
-7.0 -10 370 610 1320 2280
-14 710 1120 2180 3800

4
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
2. INSTALLATION
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

A: Place of installation
Proper wide space for working should be arranged to keep safety.
※ in case of mounting on high position, fence and deck by means of
protection should be specifically provided to around them.

B: Pipe work
(1) Use clean pipes, without rust and deposits.

(2) Fix firmly stand pipes on upper deck.

(3) Clean pipes by using such as air blower before mounting on


stand pipe.

(4) Mounting flange surface is required with smooth flat.

C : Transportation
(1) Do not give impact and turn over.

(2) Do not place anything on VACUUM RELIEF VALVE.

D : Mounting
(1) Suspend with the eye bolts on the top of cover by using crane or lifting
device.

(2) Mount the valve as which of axis of disc is at right vertical.

(3) Flanged connection is based on JIS B 2210 5K as standard.

3. INSPECTION / MAINTENANCE

If the disc is normally operating and screen is dirty, the valve will restrict
the normal passage of air.

A . Consequently, accidental damage will occur to cargo tanks. Inspect


the follows before sailing and unloading.

(1) Make certain by manual trial lever check that valve disc move up and
down freely.

(2) Whether screen is not clogged with deposits of carbon scale.

(3) Whether screen is not corroded or damage.

5
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
B . In order to keep the valve working satisfactorily, the valve has to be
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

inspected, cleaned and overhauled at every years.


Especially, please kindly hurry up to overhaul time if cargo is easy to
stiffen.

(1) Make sure to stick without any foreign materials on the body, cover and
valve.

(2) Ensure that whether the valves has not been affected any damages from
the outside.

(3) Checking before loading included (1) ~ (3)

(4) Checking of the painting condition.

※ When an abnormal condition is found out into the valves, stop to using
and check the valve follow with "4. DISASSEMBLING OR REASSEMBLING"
and "5. CHECK POINT AND SERVICING AT OVERHAUL".

4. DISASSEMBLING AND REASSEMBLING

 :Notice on working
(1) Working operation should be quitted under rough weather condition
because of danger.
(2) Helmet, gas mask, goggles, gloves, safety belt, etc. should be worn on
for safeguard when working.
(3) Be careful not to injure the screens during replacing.
(4) Use non-sparking metal tools for working.
※ When the vacuum relief valve is dismantled from pipe, make certain
no pressure in tank and

A: Lifting off the valve (A3).


refer to the 8. GENERAL ASSEMBLY DRAWING

(1) Loose bolts and nuts (D1-2) with spring washer, and dismantle
plate (A15) with check lift lever assembly , collar (A33), screen (E3-1),
screen guide (E3-2).

(2) Remove the spring pin (A11-6).


この時、B3 CHECK LIFT BAR を落下させないよう注意して下さい。

(3) Loose bolts and nuts (D1-1) with spring washer.

6
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
(4) Remove the cover (A2).
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

(5) Lift off valve (A3).


Lift up is eye bolt (M10) screwed on the valve (A3) rod top.
Size of Eye bolt VV-E,S,L-65~200 --- M8
VV-E-250 ---------- M10

※ Cleaning work should be carried out at safety zone.

B: Refitting of the valve (A3).

※ Try to order in reverse as prior section A.


Loose eye bolt on the valve (A3) rod top at set on the valve (A3).

C: Taking out the screens (E3-1)


refer to the 8. GENERAL ASSEMBLY DRAWING

(1) Loose nut of bar holder (A22).

(2) In case of VV-E,S,L-65 to 200


Separate bar holder (A22), gasket (C1), screen (E3-1) and screen
guide (E3-2).

In case of VV-E-250
Separate bar holder (A22), gasket (C1), screen (E3-1), spacer (A10),
screen (E3-1), gasket (C1) and screen guide (E3-2).

D: Refitting of screen (E3-1).

(1) In case of VV-E,S,L-65 to 200


Insert bar holder (A22) to gasket (C1), screen (E3-1), screen (E3-1),
screen guide (E3-2).

In case of VV-E-250
Insert bar holder (A22) to gasket (C1), screen (E3-1), spacer (A10),
screen (E3-1), gasket (C1), screen guide (E3-2).

(2) Locate each hole of screen (E3-1) to screen guide (E3-2), and secure
them with bar holder nut (A22).

(3) Insert bolt (D1-2) from check lift lever (A11) side of plate (A15), Insert
collar (A33), screen guide (E3-2), screen (E3-1) from opposite.

7
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
(4) Make certain to joint with body (A1) an check lift lever (A11) in place,
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

insert bolt (D1-2) of semi-assembling to body (A1) bolt holes.

(5) Fitted nut and spring washer in bolt (D1-2).

(6) Make certain by manual trial check lift lever (A11) that valve (A3)
move up and down freely.
※ If not move up and down freely then reassembly.

(7) Tighten the bolt and nut (D1-2).

NOTE : Ensure all of the parts are in place of unit.

5. CHECK POINT AND SERVICING AT OVERHAUL

 NOTICE ON WORKING
Helmet, gas mask, goggles, gloves, safety belt, etc. should be worn on
for safeguard when working.

(1) The way to treat of a stain and coagulation stuck in body (A1),
cover (A2).
How to do :
① To clean the any deposits, apply to use a liquid cleaner or cloths.
② To clean with using detergent and duster after removing coagulation
stuck with using wire brush, Grinder.
Please be attention not to peel and hurt in painting.

(2) When mating seat surfaces (A3,A1) are of nicks, cuts or deposits that
might interfere with tightness of the valve.
How to do :
① In case of nicks and cuts, the seat must be lapped with flat plate
on which a find grinding compound should be used.
② Clean seat rings by using solvent and waste cloth.

(3) When bits, cuts or deposits were found on stem of valve (A3), seat (A1)
and guide on cover (A2).
How to do :
① File is used for chipping bits to flat and finish by using sandpaper
in grade #240..
② In case cuts was found out on it, use to finish it by sandpaper
in grade #240..
③ Clean surface out with cloth.
8
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
(4) When screen (E3-1) were found out dirt, corrosion and damages.
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

How to do :
① Dirty screen is cleaned by using compressed air or waste cloth.
NOTICE : Be careful no to damage screen.
② Corroded screens should be replaced to new one.
③ Damaged screens should be replaced to new one.

※ Be careful not to injure the screen.


The screen is 0.29mm (#30) × 30 Mesh allowable.
※ When some harmful damages are found out external on valve and
difficulty maintaining in each case of (1), (2) and (3), contact our
services and agents for parts supply.

(5) Reparation in painting part.

① The way of treatment and treatment grade inside.


1) Blast Cleaning : SIS Sa 2.5 and over
2) Power tool Cleaning : SIS Please treat like St 3.0

② The condition of painting construction.


1) Please do not paint as follow environment a high temperature,
a low temperature, high humidity and s strong wind.

2) Please follow painting catalogue to painting construction opening,


dilution and chore drying.

③ Painting Inspection
The thickness of skin should be strictly examined beyond stipulated
thickness standard.

9
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
6. AIR PRESSURE AND OPERATION TEST AFTER OVERHAUL
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

AND REASSEMBLING.
(1) Air pressure test

Air pressure test : 70 kPa Holding time : 3 minutes.

(2) Operation test

Pressure downing speed : 0.01 MPa / Min. and below.

7. Re : TEST RESULT
Concerning the request for test result of VACUUM RELIEF VALVE, please
kindly contact our service center or agency and inform model, name of Yard,
Hull ( Ship ) No., Ship name, Completion Date and etc.

10
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
8. GENERAL ASSEMBLY DRAWING
to

to
ww

ww
om

om
k

k
lic

lic
8-1. Model : VV-E,S,L-65~200
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w k e r- s o ft w a

9
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
8-2. Model : VV-E-250
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w k e r- s o ft w a

10
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
9. MANUFACTURES QUALITY CERTIFICATION
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

11
h a n g e Pro h a n g e Pro
XC d XC d
F- F-

uc

uc
PD

PD
!

!
W

W
t

t
O

O
N

N
y

y
bu

bu
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

OVERSEAS NETWORK
U.S.A. SINGAPORE
VIRGINIA SINGAPORE
FUJI TRADING (AMERICA)INC. FUJI HORIGUCHI ENGINEERING PTE.,LTD.
11836 CONAN BLVD.,SUITE 300 No.11 PIONEER ROAD NORTH. #01-66.
NEWPORT NEWS, VIRGINIA, 23606 U.S.A SINGAPORE 628462
TEL. +1-757-873-4110 TEL. +65-863-6368
FAX. +1-757-873-4123 FAX. +65-863-8310
E -MAIL : fta@fujitrading-us.com E -MAIL : fuku@fujithe.com
UNITED KINGDOM KOREA
LONDON SEOUL
FUJI TRADING CO. NIIKURA KOREA CO.,LTD.
PENINSULAR HOUSE 36 MONUMENT STREET UNIT 1109 ROSE DALE. 724. SUSEO-DONG.
LONDON EC3R 8LJ,U,K. KANGNAM-GU. SEOUL. KOREA
TEL. +44-20-7623-1623 TEL. +82-2-6242-1112
FAX. +44-20-7623-1624 FAX. +82-2-3413-3160
E-MAIL : fujilondon@dial.pipex.com E-MAIL : niikurakorea@hananet.net
THE NETHERLANDS TAIWAN
ROTTERDAM KAOHSIUNG
FUJI TRADING (MARINE)B.V. LSC MULTECH CO.,LTD.
POST Box 2498 9F-4. No.10 CHUNG-SHAN W. RD.
300 CL ROTTERDAM, SLUISJESDIJK FONG SHAN. KAOHSIUNG HSIEN.
3087 AW ROTTERDAM THE NETHERLANDS TAIWAN. R.O.C.
TEL. +31-10-4298833 TEL. +886-7-743-7773
FAX. +31-10-4295227 FAX. +886-7-743-1293
E-MAIL : info@fujitrading.nl E-MAIL : lscmulte@ms14.hinet.net
UNITED ARAB EMIRATES TAIWAN
DUBAI TAIPEI
MIDDLE EAST SHIP STORES ULTRA WISE CORP.
C/O MIDDLE EAST SHIP STORES No.195 JIN-MEIST.,WEN SHAN DIST.,
BEHIND. JOTUN POWDER COATING CO. TAIPEI. TAIWAN. R. O. C.
A1-QUOZ IND. AREA TEL. +886-2-86635497
P.O.Box 19227. DUBAI-UAE FAX. +886-2-86635495
TEL. +971-4-347-4444 E-MAIL : ultrawis@ms41.hinet.net
FAX. +971-4-347-1891
E-MAIL : mes@emirates.net.ae

 NIIKURA KOGYOCo., LTD.


Head Office (Foreign Trade Dep't.)
2-14-18, Higashigotanda, Shinagawaku, Tokyo, 141-0022, Japan
TEL : +81-3-3443-6571 FAX : +81-3-3443-6576
E-Mail : niikura-kogyo@nifty.com

 NIIKURA CORPORATION
Head Office (Foreign Trade Dep't.)
2-14-18, Higashigotanda, Shinagawaku, Tokyo, 141-0022, Japan
TEL : +81-3-5449-0331 FAX : +81-3-5449-0336
E-Mail : niikura-kogyo@nifty.com

You might also like