Professional Documents
Culture Documents
DESCRIPTION
N
NOTES.
S
KEY PLAN
N
design elevation -7.30 m
E
design elevation -7.30 m
TANK
Jetty Structure
GEN 1 GEN 2
IRS
design elevation -7.30 m REPA SHOP
SHIP ORK
CE W
Substation 3
(Ground Floor)
OFFI
Quay- Wall
existing
HANGAR SHED
4,88 4,985
Quay Structure Terminal Area A-1 4,71
Repair Station 6
RE
CE
SMCH
P TIO
Substation
N
4,88
A
HA
LL
ST
P
Repair Station 7
W
Terminal Area B
OR
TA
NK
Terminal Area A-2
KE
4,71 4,88 4,985 Compressor
R
Room
CA
NT
EE
Substation 1
N
NO
3
possible area for
4,88 4,88
Cooling Water
outlet pump
4,985
4,88 4,71 4,88
4,985
4,88 4,88
4,985
4,88 4,71 4,88 4,985
BUILDING
Existing connection point for Oxygen
4,88 4,88
(diameter 112 ", pressure 50-60 PSI and
max. flow rate and max. quantity unknown)
Terminal Area C
Repair Station 4 Repair Station 11
4,985
4,88 4,88 4,985
B O C GASES
B O C GASES
4,88
4,88
4,985
Substation 2
Repair Station 12
(Ground Floor)
BUILDING
Area used by others
4,985
4,88 4,985
4,88
CANTEEN
4,88
4,985
4,985
Existing connection point for Natrual Gas
1
(diameter 1 2 ", pressure 35 PSI and
max. flow rate and max. quantity unknown)
ROAD UNDER CONSTRUCTION
LEGENDS:-
FINISHING SCHEDULE
FLOOR
FINISHES
ROOM
INTERNAL
PLASTER
EXTERNAL
BLOCK MASONRY
CEILING
PAINT WALLS
EXTERNAL
28-501 28-501-DD-C-SUB-DR-012 1 A1 - 1 OF 5