Tool Box Talk: Site Name: Date: Contractor: Shift
Tool Box Talk: Site Name: Date: Contractor: Shift
S.
No Name/ Gate Pass No Signature
Topics: Housekeeping
1
1. Walkways & Staircase should be
2 clear of debris at all times
3 2. All materials should be store in their
designated areas
4 3. All tools and equipment to be stored
neatly
5 4. plywood & timber with protruding
nails to be separate from other debris
6
5. Protruding nails should be bend or
7 remove from plywood’s
6. All waste debris to be keep in neat
8 piles and away from immediate work
area.
9 7. This debris to be remove from the
10 job area on a daily basis
8. Food waste must be put in bin
11 9. Extension cords (cable) & air
compressor hose to be run across the
12 walkways if necessary run them
13 overhead