Professional Documents
Culture Documents
Tension reinforcement
Ø 16 20 20 12 20
No 2 Top 2 Btm 3 Top 4 Btm 2 Top
As prov mm² 402 628 942 452 628
= % 0.49 0.72 1.16 0.51 0.78
Compression reinforcement
Ø 16 12 12 12 12
No 2 Btm 2 Top 2 Btm 2 Top 2 Btm
As' prov mm² 402 226 226 226 226
= % 0.49 0.26 0.28 0.26 0.28
OUTPUT/SUMMARY
END END FIRST INT INTERNAL INTERNAL
SUPPORTS SPANS SUPPORTS SPANS SUPPORTS
PROVIDE 2 H16 T 2 H12 T 3 H20 T 2 H12 T 2 H20 T
Main reinforcement Nominal B 2 H20 B Nominal B 4 H12 B Nominal B
Links 2 H10 @ 200 2 H10 @ 200 2 H10 @ 200 2 H10 @ 200 2 H10 @ 200
from CL of support for 800 for 600 for 600