You are on page 1of 1

PACKAGE 65

ABSTRACT OFAPPROACHCHANNELANDEXITCHANNEL

S.NO. DESCRIPTION OF UNIT TOTALQUANTITY WORK DONE BALANCE RATE AS AMOUNT IN


ITEM IN CUM QUANTITY QUANTITY PER SSR RS
2012-13
1 Earthwork excavation Cum 10,76,498 909830 1,66,680 247.7 4,11,19,956/-
in all Soils up to hard
rock and deposition on
banks conveying with
a leadof2 Km by
heavy earth moving
machinery
2 Lining the canal with Cum 16,595.34 - 16,595.34 4154. 6,89,43,681/-
C.C 1:3:6 using 40 40
mm and25% of 20mm
grade metal
3 Provision for L.S 22,01,272/-
dewatering at 4% on
half cost of
Excavation
TOTAL 11,22,64,909/-