The document summarizes work done on an approach channel and exit channel project. It includes three items: 1) Earthwork excavation of 166,680 cubic meters of soil up to hard rock and deposition within 2 km, 2) Lining of 16,595 cubic meters of the canal with concrete in a 1:3:6 mix using 40mm grade metal, and 3) A provision of Rs. 22,01,272 for dewatering at 4% of the half cost of excavation. The total amount for the project is Rs. 11,22,64,909.
The document summarizes work done on an approach channel and exit channel project. It includes three items: 1) Earthwork excavation of 166,680 cubic meters of soil up to hard rock and deposition within 2 km, 2) Lining of 16,595 cubic meters of the canal with concrete in a 1:3:6 mix using 40mm grade metal, and 3) A provision of Rs. 22,01,272 for dewatering at 4% of the half cost of excavation. The total amount for the project is Rs. 11,22,64,909.
The document summarizes work done on an approach channel and exit channel project. It includes three items: 1) Earthwork excavation of 166,680 cubic meters of soil up to hard rock and deposition within 2 km, 2) Lining of 16,595 cubic meters of the canal with concrete in a 1:3:6 mix using 40mm grade metal, and 3) A provision of Rs. 22,01,272 for dewatering at 4% of the half cost of excavation. The total amount for the project is Rs. 11,22,64,909.
S.NO. DESCRIPTION OF UNIT TOTALQUANTITY WORK DONE BALANCE RATE AS AMOUNT IN
ITEM IN CUM QUANTITY QUANTITY PER SSR RS 2012-13 1 Earthwork excavation Cum 10,76,498 909830 1,66,680 247.7 4,11,19,956/- in all Soils up to hard rock and deposition on banks conveying with a leadof2 Km by heavy earth moving machinery 2 Lining the canal with Cum 16,595.34 - 16,595.34 4154. 6,89,43,681/- C.C 1:3:6 using 40 40 mm and25% of 20mm grade metal 3 Provision for L.S 22,01,272/- dewatering at 4% on half cost of Excavation TOTAL 11,22,64,909/-