0 INSTALLATION
2.1 INSTALLATION INSTRUCTIONS
WARNING: Installation by untrained persons is a potential hazard to the person or persons doing the
installations, others present, and to the equipment itself. In addition, improper installation is a
potential hazard to the user, persons present during use, and patient.
These installation instructions are provided for use by Cutera Service Engineers who have
completed certification service training on the Solera Titan and Solera Opus systems.
1. Check for proper site preparation.
WARNING: Any site not prepared with proper electrical service will have the installation rescheduled
for a later date. Under no circumstances is the laser to be installed with known site or electrical
problems or faults. Never install the laser if earth ground is not provided!
Solera systems auto‐configure to operate with mains supplies ranging between 100 ‐ 240 VAC,
frequencies of 50/60 Hz, and line current values of 15 A or more. The chart below provides pop‐
ular NEMA power plug designs available from Cutera.
The laser console features a detachable, three conductor power cord that is 12 feet in length. The
configuration of the Solera Titan and Solera Opus systems for a specific line condition is a near
automatic operation. The only service requirements are selecting the power cord and verifying
that the mains service conforms to our system requirements.
2. Uncrate the laser console and accessories.
NOTE: Prior to uncrating the laser, perform a visual inspection of the crate or carton. The shipper is
responsible for any damage to the system during shipment. If the crate or carton appears to be
damaged, report the damage to the customer and shipper.
Solera Titan and Solera Opus systems may ship in a multiple use cardboard carton or high
impact plastic travel case.
The console measures 14” W x 19” D x 17” H. The Solera Titan console weighs approximately 60
lbs and the Solera Opus console weighs approximatly 40 lbs, without the IPL handpiece and tree
attached. Installation of the tree adds another 3” to the overall height of the system. A minimum
of 18” of air space is required around the console to provide adequate cooling air circulation.
Solera Titan / Opus Service Manual INSTALLATION
P/N D0792 REV. A 2-1
The system requires approximately 1 gallon of deionized water for its closed circuit cooling sys‐
tem. The coolant (DI water) is shipped in a container in the crate or carton. Coolant must be
added as described in this procedure.
Complete specifications for the Solera Titan and Solera Opus systems are included later in this
section and in the Solera Series Operator Manual. Contact Technical Support in Brisbane, CA, at
(415) 657‐5564, if there are questions concerning site preparation.
3. Move the system to an acceptable installation site.
Many Solera systems are delivered with a mobility cart. The mobility cart eases relocation of the
Solera console and provides a convenient lower storage area. Mobility carts are shipped sepa‐
rately and may not arrive with the Solera console.
4. Perform a visual inspection of the interior.
CAUTION: DO NOT perform the following step with the laser connected to mains power. Lethal
voltages exist on the mains and inside the console when plugged into a live electrical circuit. Make
absolutely certain that the laser is not plugged into a live electrical circuit. If required by local electrical
code, place a lockout box over the plug to prevent insertion into a live socket.
Refer to Section 6 for detailed instructions on opening the side panels and top cover.
a. Tighten hose clamps and coolant fittings as necessary.
b. Ensure that the De‐Mineralizer cartridge is fully seated in its housing and that the heat
exchanger quick‐disconnect fitting is closed.
c. Examine the RJ 45 communication cables and wire harnesses for tight and proper connec‐
tions.
d. Check for loose hardware.
5. Confirm the site voltage and current set‐up.
a. Measure the voltage of the site electrical service at the point where the Solera system will
be connected, and record the value on the service report. (The acceptable voltage range is
between 100 ‐ 240 VAC. Do not connect the Solera console to voltages outside the specified
range.) The three connections include the earth ground and two hot mains.
b. Measure the line voltage across the two hot mains.
If the system is to be plugged into an electrical receptacle, the appropriate receptacle should
already be installed by the customer’s electrician. The installing engineer connects the plug (if
non‐standard) to the end of the Solera power cord. The plug must be properly rated for the volt‐
age configuration of the system. If necessary, consult with the facility’s electrical engineer or con‐
tact Cutera Technical Support.
INSTALLATION Solera Titan / Opus Service Manual
2-2 P/N D0792 REV. A
6. Plug the system into the mains power and prepare to turn it on.
WARNING: Once connected to site electrical service, lethal voltages are present inside the unit. The
AC power is present at the circuit breaker (CB1), interlock transformer, and various terminal strips
around the system. Review and understand the safety topic in Section 5 before proceeding.
a. Insert the power cord into the rear panel of the laser console, and plug the other end into
mains power.
b. Flip the system’s integral circuit breaker into the closed (on) position.
c. Ensure that the CDRH (BRH) interlocking DIN plug is properly installed in the rear panel.
d. Locate the ignition key and the footswitch in the accessory box shipped with the system.
e. Insert the key into the keyswitch and footswitch into the rear panel connector.
Circuit breaker
Power receptacle
CDRH plug
Footswitch receptacle
a. Remove the threaded “travel” cap from the water fill tank.
Water fill port
Fill level window
b. Slowly add deionized water to the fill tank port, allowing the water to fill the resevoir and
associated plumbing.
c. Once the fill tank is full, cycle the keyswitch on for 5 to 10 seconds. Turn the keyswitch off
after 10 seconds to prevent self‐test firing of the laser and flash delivery devices.
NOTE: In many cases, the pressure switch will fail to close in response to waterpump operation in a
partially filled cooling system. An error message will display if the pressure switch or level sensor
detects a low water level. In either case, slowly top off the fill tank, then repeat cycling the keyswitch on
for 5 to 10 seconds.
Several iterations of the filling and power cycling process will be required to completely fill the
cooling system and remove unwanted air bubbles.
Required Tools: Ophir Nova Display and Ophir L40 (150) A energy detector
1. Start the Solera system.
Turn on the laser system and verify successful completion of self‐test. In the event self‐test fails
or is aborted due to errors, refer to Section 5 for detailed troubleshooting information. If faults
persist, contact Cutera Technical Support.
2. Confirm the energy calibration.
WARNING: The Solera Titan and Solera Opus pose a potential hazard to skin and optical tissue.
Under no circumstances should electrical adjustments, alignments, and/or energy measurements be
performed without appropriate eye protection. If uncertain about appropriate pulsed light safety
eyewear or optical density values, contact Cutera Technical Support.
Connect the L40 detector to the Nova display and turn it on. Ensure that the Nova display is
selected to measure “Energy” and set to measure pulses of up to 100 J. Stabilize and direct the
selected handpiece into the L40 detector. The sapphire window of the handpiece must be held
parallel to and within 2 mm of the energy detector face.
Using the tables below, fire the system at various operating points while measuring the laser
pulse energy. Allow several seconds between exposures for the L40 detector to cool down. If the
energy measurements are outside the prescribed limits, contact Cutera Technical Support.
A cu Tip 500:
D isplayed Fluence Expected Energy (J) M in. Lim it Actual Energy M ax. Lim it
5 1.58 1.42 1.73
10 3.17 2.85 3.48
15 4.75 4.27 5.22
20 6.33 5.69 6.96
24 7.6 6.84 8.36
AcuTip 500 handpiece test parameters
O PS600:
D isplayed Fluence Expected Energy (J) M in. Lim it Actual Energy M ax. Lim it
3 9 8.1 9.9
10 30 27 33
15 45 40.5 49.5
25 75 67.5 82.5
OPS600 handpiece test parameters
Solera Titan / Opus Service Manual INSTALLATION
P/N D0792 REV. A 2-5
LP560:
Displayed Fluence Expected Energy (J) M in. Lim it Actual Energy M ax. Lim it
10 30 27 33
20 60 54 66
30 90 81 99
40 120 108 132
LP560 handpiece test parameters
Titan XL:
Displayed Fluence Expected Energy (J) M in. Lim it Actual Energy M ax. Lim it
10 30 27 33
20 60 54 66
30 90 81 99
40 120 108 132
50 150 135 165
Titan XL handpiece test parameters
Titan S / V:
Displayed Fluence Expected Energy (J) M in. Lim it Actual Energy M ax. Lim it
10 15 13.5 16.5
20 30 27 33
30 45 40.5 49.5
40 60 54 66
50 75 67.5 82.5
Titan S/V handpiece test parameters
Pr oWave 770:
M ode Disp. Fluence Expected Energy (J) M in. Lim it M easured E. M ax. Lim it
A 20 60 54 66
A 35 105 94.5 115.5
B 15 45 40.5 49.5
B 25 75 67.5 82.5
C 10 30 27 33
C 25 75 67.5 82.5
ProWave 770 handpiece test parameters
1. Demonstrate the system function to the customer.
a. Point out the main circuit breaker, keyswitch, and Emergency Stop button.
b. Show how the footswitch, remote interlock (CDRH) plug, and handpiece cables plug into
the system’s console connector.
c. Select and test fire each available delivery device with customer. Direct their attention to
the integral cooling feature.
d. Reinforce the necessity of periodic cleaning of the heat exchanger.
2. Complete the Field Service Report.
2.4 PRODUCT SPECIFICATIONS*
Electrical:
100‐120, 200‐240, 8‐10A, VAC, 50 / 60 Hz, Single Phase
Cooling:
Internal closed cycle liquid to air heat exchanger. Approximately 1 gallon of DI water.
Treatment Light Wavelengths and Selected Details:
FDA Classification ‐ Class II Medical Device
Size (W x L x H): 13.5 in x 15 in x 20 in (35.5 cm x 38.2 cm x 51.8 cm)
Weight:
Solera Opus: 60 lbs (27.2 kg)
Solera Titan: 40 lbs (18.1 kg)
Operating length of umbilical: 7 ft (2.13 m)
Minimum bend radius of umbilical:
Storage: 5 in (127 mm)
Momentary: 2 in (50 mm)
Environmental Requirements:
Temperature:
Operating: ‐5 C to 27 C
Storage: ‐10 C to 50 C
Humidity: 0 to 90%, non‐condensing
Maximum Heat Dissipation: 1200 Watts
Maximum Altitude:
Operating: 15,000 ft
Non‐operating: 50,000 ft
Eye Safety:
OPS600, LP560, ProWave 770, AcuTip 500, LimeLight, Titan (all models):
Recommended broadband protection filter factor of 3 or greater
* Specifications subject to change without notice.