DRAWING CONTROL – TEAMBINDER (INTERNALLY CREATED DRAWINGS)

ENGINEERING
DCC
DISCIPLINE LEAD/REVIEW CO-ORDINATOR
Request Drawing number
DCC Creates Place Holders
Document Created (CAD Team)
DCC Uploads Drawing into TB
Discipline Lead Decides on Review Path
WorkPack Distribution List notified (QA, Fab Mgr., Const. Mgr., 3rd Party
Approve
1
1
Reject Document
END
DRAWING CONTROL – TEAMBINDER (ENGINEERING)
ENGINEERING (Crestech)
DCC
ENGINEERING/DISCIPLINE LEAD
Drawing sent in AFC
Upload Drawing in TB
Engineering Creates Fab. Drawing (Based
on AFC)
Engineering notified Automatically
AFC Drawing downloaded
WorkPack Distribution List notified (QA,
Fab Mgr., Const. Mgr., 3rd Party)

END
Engineering Support Workpack Upload