OUTLINE OF WORKSECTIONS
15400 Plumbing
¾ Etc
Items to measure :
• Insulation
• Ancillaries
• Equipment
• Manholes
• Any other related work
Fire Protection
15300 Fire Protection
¾ Fire extinguishers
¾ Etc.
Items to measure :
• Ancillaries
• Equipment
• Fire extinguishers
• Field devices
M1 This can be classified and measured under one of the following system, together with their
pipe work, equipment and ancillaries
a ) Automatic fire sprinkler system (wet system contains water inside the pipes at all times)
b) Dry Standpipe system (has no water insides the pipes)
c) Fire Extinguishers
d) Gas suppression system (i.e. FM-200, Inergen, Nitrogen, etc.)
e) Others, stated
C1 Most fixings and components are held to be included with the measured works. Brackets,
saddles, hangers, screws, bolts and all other fixings and supports, anti-vibration fixings and
mountings, spring compensated and seismic restraints, vibration isolators and isolating
components and other sundry work are held to be included.
This rule must therefore be considered when measuring the pipe works and equipment.
Fire Protection
1. 15300 Fire Protection
Items to Measure
Pipes and fittings (usually black steel (BI) for interior suspended piping; galvanized steel (GI) for
external piping exposed to elements and ductile iron for below ground; also sometimes GI for dry
standpipe system and reaction system)
Field devices (heat detectors, smoke detectors, etc. – very seldom-measurable items here; usually
under preaction system)
Any other related work
This list is only intended to give the typical items to consider for a taking off list.
A taking off list should be drafted covering in detail all the items to be measured. As we go through
examples you will see the level of detail you should go to.
You must always draft a taking off list prior to starting taking off.
Fire Protection
1. 15300 Fire Protection
Items to Measure ( cont’d )
Fire protection works is measured based on drawings and specifications but must have full descriptions
including :-
Pipe Runs :-
15300.2 Classified according to specification and size. Measured in
meters and measured over all in-line fittings.
15300.2.1.1 to 5 – pipes laid or fixed to walls/columns, floors,
ceilings / soffits, in trenches shall each be so described.
C3 Joints (any joints which differ from those generally occurring in the
running length – most commonly screwed, flanged or welded joints)
are held to be included where “not designed by the Engineer” (ie
those joints which the Contractor chooses to make his own method
of working).
C5 Pipes not exceeding 60mm diameter are held to include all fittings.
Ancillaries :-
Fire extinguishers :-
General (Sundries) :-