ANNEXURE - "C" -MPR FOR QUALITY CONTROL

QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH SEPTEMBER -2017

TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK

TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
1.0 TESTS ON BORROW AREAS FOR EMBANKMENT AND SUBGRADE/FLY ASH
1.1 FSI 1 test / 1500 mᶟ 555 555 0 7 7 0 562 562 0 2 0 202 202 0
1.2 GSA 1 test / 1500 mᶟ 555 555 0 7 7 0 562 562 0 2 0 204 204 0
1.3 LL / PL / PI 1 test / 1500 mᶟ 696 696 0 7 7 0 703 703 0 2 0 204 204 0
1.4 MDD / OMC 1 test / 1500 mᶟ 703 703 0 7 7 0 710 710 0 3 0 210 210 0
1.5 CBR Test 1 test / 3000 mᶟ 356 356 0 7 7 0 363 363 0 3 0 197 197 0
1.6 FDD (Emb. Layer) 1 set / 3000 m² 24913 24873 40 114 114 0 25027 24987 40 34 0 12469 12469 0
1.7 FDD (Sub. Layer) 1 test / 2000 m² 8512 8485 27 144 144 0 8656 8629 27 46 0 5158 5158 0
2.0 TESTS ON OGL SAMPLES (MCW&SR)
2.1 FSI 1 test / 250m 208 208 0 0 0 0 208 208 0 0 0 83 83 0
2.2 GSA 1 test / 250m 208 208 0 0 0 0 208 208 0 0 0 83 83 0
2.3 LL / PL / PI 1 test / 250m 206 206 0 0 0 0 206 206 0 0 0 83 83 0
2.4 MDD / OMC 1 test / 250m 211 211 0 0 0 0 211 211 0 0 0 84 84 0
2.5 CBR Test As Required 32 32 0 0 0 0 32 32 0 0 0 16 16 0
2.6 FDD (OGL) Min. 6 Pit 1632 1632 0 0 0 0 1632 1632 0 0 0 1134 1134 0
3.0 TESTS ON EXCAVATED SOIL
3.1 FSI 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.2 GSA 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.3 LL / PL / PI 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.4 MDD / OMC 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.5 CBR Test As Required 7 7 0 0 0 0 7 7 0 0 0 5 5 0
4.0 TEST ON GRANULAR SUB BASE COURSE (GSB)
4.1 GRADATION 1 test / 400 mᶟ 759 759 0 30 30 0 789 789 0 10 0 333 333 0
4.2 LL / PL / PI 1 test / 400 mᶟ 759 759 0 30 30 0 789 789 0 10 0 281 281 0
4.3 MDD / OMC 1 tset / source 12 12 0 0 0 0 12 12 0 0 0 10 10 0
4.4 CBR Test 1 tset / source 12 12 0 0 0 0 12 12 0 0 0 10 10 0
4.5 AIV As Required 15 15 0 0 0 0 15 15 0 0 0 16 16 0
4.6 FDD (GSB) 1 test / 1000 m² 1777 1770 7 12 12 0 1789 1782 7 8 0 789 789 0
5.0 TEST ON AGGREGATE BASE COURSE (WMM)
5.1 Mix Aggregate Gradation 1 test / 200 mᶟ 769 769 0 43 43 0 812 812 0 10 0 317 317 0
5.2 Plasticity Index 1 test / 200 mᶟ 743 743 0 43 43 0 786 786 0 10 0 262 262 0
5.3 AIV 1 test / 1000 mᶟ 207 207 0 9 9 0 216 216 0 2 0 74 74 0
5.4 MDD / OMC 1 tset / source 6 6 0 0 0 0 6 6 0 0 0 4 4 0
5.5 Water Absorption 1 tset / source 6 6 0 0 0 0 6 6 0 0 0 3 3 0
5.6 FI & EI 1 test / 500 mᶟ 350 350 0 18 18 0 368 368 0 3 0 90 90 0
5.7 FDD (WMM) 1 Set of 3 test / 1000 mᶟ 3184 3156 28 103 103 0 3287 3259 28 40 0 1241 1241 0
5.8 FDD (DLC) 1 Set of 3 test / 2000 mᶟ 497 497 0 54 54 0 551 551 0 18 0 175 175 0
5.9 FDD (SHOULDER) 1 test / 2000 m² 474 474 0 0 0 0 474 474 0 0 0 216 216 0
5.10 FDD (MEDIAN) 1 test / 2000 m² 105 105 0 0 0 0 105 105 0 0 0 45 45 0
5.11 FDD (BACKFILLING) MIn. 3 Pit 216 216 0 0 0 0 216 216 0 0 0 63 63 0
6.0 FINE AGGREGATE (SAND FOR CONCRETE)
6.1 Sieve Analysis / Gradation On Daily Basis 356 356 0 28 28 0 384 384 0 7 0 174 174 0
6.2 Specific Gravity (SSD) As Required 78 78 0 2 2 0 80 80 0 1 0 40 40 0

EPC Contractor Representative Authority's Engineer Representative


ANNEXURE - "C" -MPR FOR QUALITY CONTROL
QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH SEPTEMBER -2017

TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK

TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
6.3 Water Absorption / Moisture Content On Daily Basis 325 325 0 28 28 0 353 353 0 8 0 160 160 0
6.4 Silt Content Once in a week 118 118 0 10 10 0 128 128 0 4 0 104 104 0
7.0 COARSE AGGREGATE (FOR CONCRETE)
7.1 Sieve Analysis / Gradation of 10mm On Daily Basis 444 444 0 28 28 0 472 472 0 12 0 183 183 0
7.2 Sieve Analysis / Gradation of 20mm On Daily Basis 440 440 0 28 28 0 468 468 0 12 0 183 183 0
7.3 Sieve Analysis / Gradation of All in Aggregate On Daily Basis 326 326 0 28 28 0 354 354 0 10 0 141 141 0
7.4 Specific Gravity (3test = 1 set) As Required 79 79 0 2 2 0 81 81 0 1 0 35 35 0
7.5 AIV One for each source 101 101 0 5 5 0 106 106 0 1 0 42 42 0
7.6 FI & EI One for each source 83 83 0 2 2 0 85 85 0 1 0 34 34 0
7.7 Water Absorption / Moisture Content On Daily Basis 287 287 0 28 28 0 315 315 0 8 0 108 108 0
8.0 CEMENT/FLY ASH
Physical Tests (Cement)
8.1 Fineness Test 1 test per lot 156 156 0 10 10 0 166 166 0 2 0 53 53 0
8.2 Standard Consistency Test 1 test per lot 126 126 0 10 10 0 136 136 0 3 0 48 48 0
8.3 Soundness Test 1 test per lot 106 106 0 10 10 0 116 116 0 2 0 43 43 0
8.4 Intial & Final Setting Time Test 1 test per lot 126 126 0 10 10 0 136 136 0 3 0 48 48 0
8.5 Compressive Strength Test 1 test per lot
(i) 3 Days (Set) 74 74 0 3 3 0 77 77 0 1 0 32 32 0
(ii) 7 Days (Set) 77 77 0 3 3 0 80 80 0 1 0 33 33 0
(iii) 28 Days (Set) 86 86 0 3 3 0 89 89 0 1 0 38 38 0
Physical Tests (Fly Ash)
8.6 Gradation 1 test per lot 45 45 0 4 4 0 49 49 0 1 0 22 22 0
8.7 Fineness Test 1 test per lot 60 60 0 4 4 0 64 64 0 1 0 24 24 0
8.8 Sp. Gravity As Required 8 8 0 1 1 0 9 9 0 1 0 5 5 0
9.0 PRIME COAT / TACK COAT
9.1 Rate of Spray ( PRIME COAT ) 3 test / Day 242 242 0 21 21 0 263 263 0 5 0 116 116 0
9.2 Rate of Spray ( TACK COAT ) FOR DBM 3 test / Day 242 242 0 21 21 0 263 263 0 5 0 116 116 0
9.3 Rate of Spray ( TACK COAT ) FOR BC 3 test / Day 0 0 0 18 18 0 18 18 0 3 0 6 6 0
10.0 DENSE BITUMEN MACADAM (DBM)
10.1 Sieve Analysis 1 test for each 182 182 0 15 15 0 197 197 0 6 0 91 91 0
400 ton of mix & Min. 2
10.2 Bitumen Extraction & Gradation Test test / day
196 196 0 15 15 0 211 211 0 6 0 105 105 0

10.3 Aggregate Impact Value 1 test / 350 mᶟ 113 113 0 8 8 0 121 121 0 2 0 43 43 0
10.4 Comb. Flakiness & Elongation Index 1 test / 350 mᶟ 113 113 0 8 8 0 121 121 0 2 0 40 40 0
10.5 GMM 1 test / day 101 101 0 7 7 0 108 108 0 3 0 51 51 0
10.6 Marshall Stability, Flow, VMA, VFB, & Air Voids 1set / 3mould 405 405 0 15 15 0 420 420 0 5 0 188 188 0
10.7 Drilled Core Density 1test / 700 m² 422 422 0 29 29 0 451 451 0 14 0 231 231 0
10.8 Sp. Gravity & Water Absorption As Required 0 0 0 1 1 0 1 1 0 1 0 1 1 0
11.0 BITUMINOUS CONCRETE (BC)
11.1 Sieve Analysis 1 test for each 400 MT 0 0 0 15 15 0 15 15 0 6 0 6 6 0
400 ton of mix & Min. 2
11.2 Bitumen Extraction & Gradation Test 0 0 0 15 15 0 15 15 0 6 0 6 6 0
test / day
11.3 Aggregate Impact Value 1 test / 350 mᶟ 0 0 0 8 8 0 8 8 0 2 0 2 2 0

EPC Contractor Representative Authority's Engineer Representative


ANNEXURE - "C" -MPR FOR QUALITY CONTROL
QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH SEPTEMBER -2017

TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK

TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
11.4 Comb. Flakiness & Elongation Index 1 test / 350 mᶟ 0 0 0 8 8 0 8 8 0 2 0 2 2 0
11.5 Stripping Value Test 1 test / source 0 0 0 1 1 0 1 1 0 2 0 2 2 0
11.6 Marshall Stability, Flow, VMA, VFB, & Air Voids 1set / 3mould 0 0 0 15 15 0 15 15 0 5 0 5 5 0
11.7 Drilled Core Density 1test / 700 m² 0 0 0 75 75 0 75 75 0 19 0 19 19 0
11.8 Sp. Gravity & Water Absorption As Required 0 0 0 1 1 0 1 1 0 1 0 1 1 0
12.0 BITUMEN VG-30
12.1 Penetration Grade at 25 Degree 1 test / lot 131 131 0 8 8 0 139 139 0 2 0 51 51 0
12.2 Softening Point 1 test / lot 131 131 0 8 8 0 139 139 0 2 0 51 51 0
12.3 Dutility at 27 Degree 1 test / lot 122 122 0 3 3 0 125 125 0 1 0 47 47 0
12.4 Viscosity 1 test / lot 96 96 0 5 5 0 101 101 0 2 0 42 42 0
12.5 Specific Gravity 1 test / lot 108 108 0 2 2 0 110 110 0 1 0 43 43 0
13.0 CONCRETE CUBE TESTING (SITE)
13.1 7 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 367 367 0 7 7 0 374 374 0 2 0 138 138 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 263 263 0 20 20 0 283 283 0 8 0 116 116 0
(iii) M-20 KERB (SET) MORT&H - Section 1700 187 187 0 22 22 0 209 209 0 8 0 83 83 0
(iv) M-25 RCC (SET) MORT&H - Section 1700 223 223 0 26 26 0 249 249 0 6 0 67 67 0
(v) M-30 RCC (SET) MORT&H - Section 1700 910 910 0 47 47 0 957 957 0 10 0 379 379 0
(vi) M-35 RCC (SET) MORT&H - Section 1700 139 139 0 11 11 0 150 150 0 3 0 58 58 0
(vii) M-35 PILE (SET) MORT&H - Section 1700 282 282 0 2 2 0 284 284 0 1 0 40 40 0
(viii) M-35 RE PANNEL (SET) MORT&H - Section 1700 361 361 0 71 71 0 432 432 0 15 0 85 85 0
(iX) M-40 RCC (SET) MORT&H - Section 1700 18 18 0 9 9 0 27 27 0 2 0 9 9 0
(X) M40 PILE (SET) MORT&H - Section 1700 30 30 0 0 0 0 30 30 0 0 0 4 4 0
(XI) M50 PSC (SET) MORT&H - Section 1700 0 0 0 1 1 0 1 1 0 1 0 1 1 0
(XII) M-45 PSC (SET) MORT&H - Section 1700 1 1 0 4 4 0 5 5 0 2 0 3 3 0
(XIII) DLC MORT&H - Section 600 534 534 0 48 48 0 582 582 0 6 0 169 169 0
(XIV) PQC (CUBE) MORT&H - Section 600 667 667 0 60 60 0 727 727 0 24 0 287 287 0
(XV) PQC ( BEAM) MORT&H - Section 600 667 667 0 60 60 0 727 727 0 24 0 287 287 0
13.2 28 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 458 458 0 42 42 0 500 500 0 9 0 73 73 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 340 340 0 18 18 0 358 358 0 3 0 37 37 0
(iii) M-20 KERB (SET) MORT&H - Section 1700 610 610 0 72 72 0 682 682 0 16 0 106 106 0
(iv) M-25 RCC (SET) MORT&H - Section 1700 249 249 0 54 54 0 303 303 0 14 0 68 68 0
(v) M-30 RCC (SET) MORT&H - Section 1700 1890 1890 0 103 103 0 1993 1993 0 35 0 333 333 0
(vi) M-35 RCC (SET) MORT&H - Section 1700 451 451 0 33 33 0 484 484 0 14 0 93 93 0
(vii) M-35 PILE (SET) MORT&H - Section 1700 696 696 0 28 28 0 724 724 0 8 0 157 157 0
(viii) M-35 RE PANNEL (SET) MORT&H - Section 1700 725 725 0 129 129 0 854 854 0 48 0 189 189 0
(iX) M-40 RCC (SET) MORT&H - Section 1700 24 24 0 7 7 0 31 31 0 2 0 19 19 0
(X) M40 PILE (SET) MORT&H - Section 1700 27 27 0 0 0 0 27 27 0 0 0 20 20 0
(XII) M-45 PSC (SET) MORT&H - Section 1700 0 0 0 7 7 0 7 7 0 2 0 0 0 0
(XIII) M50 PSC (SET) MORT&H - Section 1700 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(XIV) PQC (CUBE) MORT&H - Section 600 404 404 0 60 60 0 464 464 0 25 0 106 106 0
(XV) PQC ( BEAM) MORT&H - Section 600 404 404 0 60 60 0 464 464 0 25 0 106 106 0

EPC Contractor Representative Authority's Engineer Representative


ANNEXURE - "C" -MPR FOR QUALITY CONTROL
QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH SEPTEMBER -2017

TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK

TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
14.0 CONCRETE CUBE/BEAM TESTING (MIX DESIGN
TRIALS)
14.1 7 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(iii) M-25 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(iv) M-30 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(v) M-35 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(vi) M-35 PILE (SET) MORT&H - Section 1700 3 3 0 0 0 0 3 3 0 0 0 3 3 0
(vii) M-40 RCC (SET) MORT&H - Section 1700 2 2 0 0 0 0 2 2 0 0 0 2 2 0
(viii) M-45 PSC (SET) MORT&H - Section 1700 72 72 0 0 0 0 72 72 0 0 0 39 39 0
(ix) M40 PILE (SET) MORT&H - Section 1700 53 53 0 0 0 0 53 53 0 0 0 16 16 0
(x) DLC MORT&H - Section 600 6 6 0 0 0 0 6 6 0 0 0 25 25 0
(xi) PQC MORT&H - Section 600 49 49 0 5 5 0 54 54 0 2 0 35 35 0
(xii) M50 PSC MORT&H - Section 1700 6 6 0 7 7 0 13 13 0 4 0 9 9 0
14.2 28 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(iii) M-25 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(iv) M-30 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(v) M-35 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(vi) M-35 PILE (SET) MORT&H - Section 1700 4 2 0 0 0 0 4 2 0 0 0 3 3 0
(vii) M-40 RCC (SET) MORT&H - Section 1700 26 0 0 0 0 0 26 0 0 0 0 26 26 0
(viii) M-45 PSC (SET) MORT&H - Section 1700 51 51 0 0 0 0 51 51 0 0 0 8 8 0
(iX) M40 PILE (SET) MORT&H - Section 1700 49 47 0 0 0 0 49 47 0 0 0 11 11 0
(x) PQC MORT&H - Section 600 49 49 0 4 4 0 53 53 0 2 0 7 7 0
(XI) M50 PSC MORT&H - Section 1700 6 6 0 6 6 0 12 12 0 4 0 4 4 0
15.0 THIRD PARTY TESTING
15.1 Soil Testing
(i) FSI As Required 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(ii) GSA (Silt & Clay) As Required 13 13 0 0 0 0 13 13 0 0 0 0 0 0
(iii) LL / PL / PI As Required 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(iv) MDD / OMC As Required 9 9 0 0 0 0 9 9 0 0 0 0 0 0
(v) CBR Test As Required 6 6 0 0 0 0 6 6 0 0 0 0 0 0
(vi) Shrinkage Limit As Required 6 6 0 0 0 0 6 6 0 0 0 0 0 0
(vii) Soluble Sulphate Test As Required 9 9 0 0 0 0 9 9 0 0 0 0 0 0
(viii) Soil Bearing Capacity (Plate Load Test) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(IX) C & Φ Value As Required 12 12 0 0 0 0 12 12 0 0 0 0 0 0
15.2 Steel
(i) 8mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(ii) 10mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(iii) 12mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(iv) 16mm (3pc = 1 set) 1 test / lot 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(v) 20mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0

EPC Contractor Representative Authority's Engineer Representative


ANNEXURE - "C" -MPR FOR QUALITY CONTROL
QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH SEPTEMBER -2017

TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK

TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
(vi) 25mm (3pc = 1 set) 1 test / lot 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(vii) 32mm (3pc = 1 set) 1 test / lot 2 2 0 1 1 0 3 3 0 0 0 0 0 0
(viIi) 36mm (3pc = 1 set) 1 test / lot 3 3 0 0 0 0 3 3 0 0 0 0 0 0
15.3 Aggregate
(i) Fine Aggregate As Required 1 1 0 1 1 0 2 2 0 0 0 0 0 0
(ii) Coarse Aggregate (10mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(iii) Coarse Aggregate (20mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(iv) Coarse Aggregate (40mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(v) GSB As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
15.4 Cement
(i) Ultratech (OPC-43) 1 test / 500 MT 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(ii) Shree (OPC-43) 1 test / 500 MT 1 1 0 0 0 0 1 1 0 0 0 0 0 0
15.5 Water As Required 4 4 0 0 0 0 4 4 0 0 0 0 0 0
15.6 Hume pipe Testing(1200mm dia) As Required 8 8 0 0 0 0 8 8 0 0 0 0 0 0
15.7 Hume pipe Testing(600mm dia) As Required 8 8 0 0 0 0 8 8 0 0 0 0 0 0
15.8 Admixture As Required 2 2 0 1 1 0 3 3 0 0 0 0 0 0
16.0 CALIBRATION IN-HOUSE
16.1 Batching Plant CP-30 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.2 Batching Plant CP-2.50 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.3 Batching Plant CP-18 6 Month 2 2 0 1 1 0 3 3 0 1 0 1 1 0
16.4 Hot Mix Plant 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.5 WMM Mix Plant 6 Month 2 2 0 0 0 0 2 2 0 0 0 1 1 0

EPC Contractor Representative Authority's Engineer Representative


NATIONAL HIGHWAYS AUTHORITY OF INDIA
Four-laning of Ambala - Kaithal Section of NH-65 from Km 0.000 (Ambala) to Km 50.860 (Pehowa) with
paved shoulder (length 50.860 km) in the State of Haryana under NHDP Phase-III on EPC Basis.

ANNEXURE -"F"
CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA
AUTHORITY'S ENGINEER : MSV INTERNATIONAL INC.
: M/s DILIP BUILDCON LIMITED
EPC CONTRACTOR M/s VARAHA INFRA LIMITED (JV)

DAILY WEATHER REPORT MONTH SEPTEMBER-2017


Location of Weather Station: DBL Base Camp @ 17+300 rhs Matheri
TEMPARATURE HUMIDITY RAINFALL
DATE STATUS REMARK
Min. ͦC Max. ͦC Min. Max. 24hrs (mm)
1-Sep-2017 21.3 27.4 74 86 163.00 RAINY
2-Sep-2017 21.5 28.0 72 80 0.00 CLOUDY
3-Sep-2017 21.9 30.4 68 80 0.00 CLOUDY
4-Sep-2017 22.1 32.9 68 77 0.00 CLOUDY
5-Sep-2017 22.7 32.7 69 79 0.00 CLOUDY+SUNNY
6-Sep-2017 22.8 34.6 66 81 0.00 CLOUDY+SUNNY
7-Sep-2017 23.9 35.9 69 76 0.00 CLOUDY+SUNNY
8-Sep-2017 24.2 38.2 70 78 0.00 CLOUDY+SUNNY
9-Sep-2017 25.9 38.0 68 77 0.00 CLOUDY+SUNNY
10-Sep-2017 26.7 38.3 64 80 0.00 SUNNY
11-Sep-2017 26.9 37.6 60 80 0.00 SUNNY
12-Sep-2017 25.5 36.4 55 81 0.00 SUNNY
13-Sep-2017 25.9 36.1 56 88 0.00 SUNNY
14-Sep-2017 26.1 36.8 55 85 0.00 SUNNY
15-Sep-2017 25.7 36.9 55 84 0.00 SUNNY
16-Sep-2017 25.4 36.7 58 84 0.00 SUNNY
17-Sep-2017 25.5 36.7 57 83 0.00 SUNNY
18-Sep-2017 25.3 36.8 55 84 0.00 SUNNY
19-Sep-2017 24.9 36.6 51 87 0.00 SUNNY
20-Sep-2017 24.2 37.0 47 85 0.00 SUNNY
21-Sep-2017 24.2 36.9 46 84 0.00 SUNNY
22-Sep-2017 24.8 36.0 50 86 48.40 CLOUDY+RAINY
23-Sep-2017 24.7 28.0 79 86 22.40 CLOUDY+RAINY
24-Sep-2017 23.2 32.9 69 87 0.00 CLOUDY
25-Sep-2017 24.0 34.8 56 85 0.00 SUNNY
26-Sep-2017 24.9 35.2 55 86 0.00 SUNNY
27-Sep-2017 25.8 35.5 57 87 0.00 SUNNY
28-Sep-2017 26.1 36.0 54 85 0.00 SUNNY
29-Sep-2017 26.5 36.1 54 85 0.00 SUNNY
30-Sep-2017 26.3 36.0 53 83 0.00 SUNNY

Summary of Rain Fall In (mm)


Up to Previous Month (mm) During this Month Commulative (mm)
620.60 233.80 854.40
EPC Contractor's Representat Authority Engineer Representative.
NATIONAL HIGHWAYS AUTHORITY OF INDIA
Four-laning of Ambala - Kaithal Section of NH-65 from Km 0.000 (Ambala) to Km 50.860 (Pehowa) with paved shoulder (length 50.860 km) in the State of Haryana under NHDP
Phase-III on EPC Basis.

BORROW AREA SUMMARY

GRAIN SIZE ANALYSIS LIQUID LIMIT


Submitted/A
BORROW DISTANCE FROM PPROVED FSI MDD OMC CBR @ 97 DATE OF
VILLAGE LOCATION SIDE SILT & % DRY REMARK'S
AREA NO. EXISTING CHAINAGE QTY. GRAVEL SAND CLAY LL PL PI APPROVAL
DENSITY
(Cum)
% % % % % % % % %
01 (P-1) FUJALPUR 19+250 LHS APPROX. 8.0 KM 12000 11.98 2.15 53.45 44.40 23.59 N.P. N.P. 1.997 9.99 12.75 10/4/2016 APPROVED
01 (P-2) FUJALPUR 19+250 LHS APPROX. 8.0 KM 11760 12.75 2.15 53.12 44.74 23.88 N.P. N.P. 1.998 10.28 12.95 10/20/2016 APPROVED
01 (P-3) FUJALPUR 19+250 LHS APPROX. 8.0 KM 23760 15.56 1.04 39.93 59.03 29.47 N.P. N.P. 1.905 11.18 12.95 11/21/2016 APPROVED
02 (P-1) KHASPUR 15+800 LHS APPROX. 10.0 KM 6030 13.32 0.71 31.68 67.62 29.80 21.63 8.17 1.960 10.68 12.40 11/30/2016 APPROVED
02 (P-2) KHASPUR 15+800 LHS APPROX. 10.0 KM 18000 12.90 0.89 31.98 67.13 29.79 21.18 8.61 1.941 10.48 12.65 11/30/2016 APPROVED
03 (P-1) NAGGAL 20+100 LHS APPROX. 10.0 KM 12000 12.51 1.48 51.24 47.29 23.59 N.P. N.P. 1.988 10.53 12.70 11/30/2016 APPROVED
03 (P-2) NAGGAL 20+100 LHS APPROX. 10.0 KM 18000 12.87 1.42 50.59 48.00 22.92 N.P. N.P. 1.992 10.44 12.98 11/30/2016 APPROVED
04 (P-1) MAHRU 15+800 RHS APPROX. 14.0 KM 9000 13.38 1.16 28.57 70.28 30.17 21.88 8.29 1.877 11.27 12.17 11/29/2016 APPROVED
04 (P-2) MAHRU 15+800 RHS APPROX. 14.0 KM 42000 13.87 1.43 29.27 69.31 29.95 23.26 6.69 1.870 11.18 12.97 11/29/2016 APPROVED
06 (P-1) UNTSAR 06+000 RHS APPROX. 7.5 KM 18750 14.21 0.92 41.03 58.05 29.38 21.74 7.58 1.870 10.58 13.02 11/17/2016 APPROVED
07 (P-1) SEGTA 23+550 RHS APPROX. 2.0 KM 18360 13.47 0.93 39.05 60.02 30.05 22.60 7.46 1.900 10.50 12.95 11/17/2016 APPROVED
08 (P-1) BAROLI 23+200 LHS APPROX. 4.0 KM 36000 12.97 0.19 49.79 50.02 24.40 N.P. N.P. 1.939 10.56 13.73 11/22/2016 APPROVED
08 (P-2) BAROLI 23+200 LHS APPROX. 4.0 KM 6000 12.05 0.16 46.54 53.31 23.00 N.P. N.P. 1.952 10.75 - 4/15/2017 APPROVED
09 (P-1) UNTSAR 06+000 RHS APPROX. 8.0 KM 6120 12.55 0.56 39.63 59.81 32.63 22.78 9.84 1.810 11.90 12.40 11/22/2016 APPROVED
09 (P-2) UNTSAR 06+000 RHS APPROX. 8.0 KM 19380 11.12 0.35 38.18 61.46 32.75 22.89 9.86 1.833 11.69 12.67 4/17/2017 APPROVED
10 (P-1) BAROLI 23+200 LHS APPROX. 4.2 KM 27000 5.82 0.00 84.78 15.22 35.97 N.P. N.P. 1.670 13.32 - 11/23/2016 APPROVED
11 (P-1) JHANSA (THOL) 30+600 LHS APPROX. 8.5 KM 15000 13.12 10.82 39.58 49.60 31.53 22.69 8.83 1.966 10.74 - 11/9/2016 APPROVED
11 (P-2) JHANSA (THOL) 30+600 LHS APPROX. 8.5 KM 32925 12.94 10.78 39.74 49.48 31.16 22.39 8.77 1.963 10.75 11.31 11/22/2016 APPROVED
11 (P-3) JHANSA (THOL) 30+600 LHS APPROX. 8.5 KM 3000 13.36 9.91 37.92 52.17 31.33 21.98 9.35 1.963 10.61 10.18 4/19/2017 APPROVED
12 (P-1) NAISE 39+600 RHS APPROX. 4.0 KM 60000 12.48 0.72 20.92 78.36 33.64 21.47 12.18 1.884 11.39 12.50 11/28/2016 APPROVED
13 (P-1) JALBEDA 43+000 BHS APPROX. 0.2 KM 15000 13.99 0.64 29.22 70.14 33.24 23.08 10.16 1.910 11.65 9.98 11/24/2016 APPROVED
16 (P-1) UNTSAR 06+000 RHS APPROX. 10.0 KM 20160 22.54 0.00 15.22 84.78 36.80 20.74 16.07 1.861 12.26 9.90 11/28/2016 APPROVED
17 (P-1) SEGTA 23+550 RHS APPROX. 2.5 KM 10500 13.96 0.00 21.30 78.70 33.81 23.81 10.00 1.923 11.26 10.64 4/17/2017 APPROVED
18 (P-1) BAROLI 23+200 LHS APPROX. 4.5 KM 9000 9.99 0.00 70.76 29.24 27.04 N.P. N.P. 1.781 10.78 10.77 4/27/2017 APPROVED
19 (P-1) JANSUI 25+750 RHS APPROX. 0.3 KM 27000 15.69 0.00 11.23 88.77 31.99 21.37 10.62 1.930 10.47 12.36 4/19/2017 APPROVED

EPC Contractor Representative Authority Engineer Representative


GRAIN SIZE ANALYSIS LIQUID LIMIT
Submitted/A
BORROW DISTANCE FROM PPROVED FSI MDD OMC CBR @ 97 DATE OF
VILLAGE LOCATION SIDE EXISTING CHAINAGE QTY. SILT & % DRY APPROVAL REMARK'S
AREA NO. GRAVEL SAND CLAY LL PL PI
DENSITY
(Cum)
% % % % % % % % %
20 (P-1) DOMLI 09+500 RHS APPROX. 3.0 KM 17150 10.71 0.00 16.84 83.16 34.06 23.10 10.97 1.826 12.54 9.98 4/18/2017 APPROVED
21 (P-1) DEVINAGAR 04+400 RHS APPROX. 0.5 KM 9000 17.08 0.00 25.99 74.01 32.73 23.14 9.59 1.980 10.23 9.00 3/1/2017 APPROVED
22 (P-1) NESI 42+000 RHS APPROX. 4.0 KM 13950 15.50 0.00 37.17 62.83 24.19 N.P. N.P. 1.934 10.53 11.40 3/1/2017 APPROVED
23 (P-1) NEAR TOLL PLAZA 04+400 RHS APPROX. 1.0 KM 5292 12.15 0.00 17.98 82.13 27.38 N.P. N.P. 1.941 10.58 12.20 5/11/2017 APPROVED
24 (P-1) DEVINAGAR 03+500 RHS APPROX. 3.0 KM 30000 12.97 0.00 23.08 76.92 27.75 17.63 10.12 1.921 10.39 10.42 4/17/2017 APPROVED
25(P-1) SAKRAON 20+900 LHS APPROX. 1.5 KM 50400 13.18 0.00 24.46 75.54 28.05 17.70 10.35 1.921 10.76 10.48 4/18/2017 APPROVED
25(P-2) SAKRAON 20+900 LHS APPROX. 1.5 KM 20160 17.29 0.00 27.79 72.21 30.20 19.89 10.31 1.906 10.83 9.67 7/6/2017 APPROVED
26 (P-1) SURAJGARH 44+030 LHS APPROX. 1.6 KM 35990 13.50 0.00 36.79 63.21 28.24 N.P. N.P. 1.944 10.47 10.42 5/6/2017 APPROVED
27 (P-1) TEJAN 18+460 LHS APPROX. 3.0 KM 9053 17.09 0.00 37.55 62.45 30.94 19.05 11.89 1.943 10.38 10.52 5/13/2017 APPROVED
28 (P-1) GUMTI 29+300 LHS APPROX. 16.0 KM 37500 - - - - 18.75 NP NP 1.981 9.25 - 5/17/2017 APPROVED
29 (P-1) NAGGAL 23+200 LHS APPROX. 0.3 KM 15015 16.19 0.00 23.86 76.14 30.75 18.73 12.02 1.958 10.43 9.38 5/19/2017 APPROVED
30 (P-1) NAGGAL 23+528 RHS APPROX. 0.5 KM 17246 21.30 0.00 31.67 68.33 31.92 22.38 9.54 1.871 11.32 11.18 6/19/2017 APPROVED
31 (P-1) TALHERI 46+100 LHS APPROX. 2.0 KM 20966 18.02 0.00 40.75 59.25 30.45 21.55 8.90 1.838 10.18 10.84 5/19/2017 APPROVED
32 (P-1) TALHERI 7+600 LHS APPROX. 2.0 KM 9072 16.27 0.00 18.33 81.67 30.37 20.95 9.42 1.948 11.18 14.58 5/19/2017 APPROVED
33 (P-1) GOVINDGARH 18+460 LHS APPROX. 2.5 KM 9072 18.36 0.00 34.11 65.90 29.50 20.02 9.48 1.926 10.47 10.48 5/19/2017 APPROVED
35 (P-1) HASANPUR 24+020 LHS APPROX. 0.5 KM 10800 17.65 0.00 34.00 66.10 30.10 21.17 8.93 1.898 10.41 9.80 5/22/2017 APPROVED
36 (P-1) NESI 41+200 RHS APPROX. 2.2 KM 50058 19.43 0.00 39.44 60.56 30.01 21.29 8.72 1.891 10.50 10.78 6/5/2017 APPROVED
38 (P-1) RAMPUR 11+000 RHS APPROX. 4.0 KM 6000 15.82 0.00 39.10 60.90 29.15 21.26 7.89 1.850 10.43 12.00 6/3/2017 APPROVED
39 (P-1) SEGTA 23+528 RHS APPROX. 3.0 KM 13973 19.25 0.00 29.23 70.77 30.08 20.84 9.46 1.862 11.34 10.92 6/29/2017 APPROVED
15.55 0.00 23.31 76.69 30.57 21.64 8.93 1.912 10.85 11.94
41 (P-1) UNTSAR 11+000 RHS APPROX. 5.0 KM 43538 7/29/2017 APPROVED
6.45 0.00 86.00 14.00 25.83 NP NP 1.793 12.99 13.23
42 (P-1) THASKA MIRA JI 37+820 LHS APPROX. 3.0 KM 8190 18.34 0.00 24.32 75.68 30.05 20.64 9.41 1.898 10.58 11.47 7/31/2017 APPROVED
43 (P-1) NESI MIRA JI 42+500 RHS APPROX. 4.5 KM 51690 5.98 0.00 85.83 14.28 24.33 NP NP 1.800 12.65 14.65 8/23/2017 APPROVED
45 (P-1) KOURLI 00+000 RHS APPROX. 2.5 KM 7452 18.53 0.00 24.32 75.68 31.04 21.65 9.39 1.915 10.78 12.27 9/15/2017 APPROVED
46 (P-1) KOURLI 00+000 RHS APPROX. 2.3 KM 46219 18.50 0.00 24.07 75.93 31.04 21.62 9.42 1.939 10.50 12.85 9/16/2017 APPROVED
47 (P-1) JARAUT 00+000 LHS APPROX. 6.7 KM 5040 21.99 0.00 29.63 70.38 32.30 21.71 10.59 1.958 10.48 11.10 9/28/2017 APPROVED
48 (P-1) JARAUT 00+000 LHS APPROX. 6.8 KM 9900 21.18 0.00 24.87 75.13 31.94 21.84 10.11 1.95 10.31 11.60 SUBMITTED

TOTAL QUANTITY (M ) ===>>


3
1029471

EPC Contractor Representative Authority Engineer Representative