QUALITY ASSURANCE & QUALITY CONTROL TEST REPORT WITNESSED BY AUTHORITY'S ENGINEER FOR MONTH SEPTEMBER -2017
TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK
TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
1.0 TESTS ON BORROW AREAS FOR EMBANKMENT AND SUBGRADE/FLY ASH
1.1 FSI 1 test / 1500 mᶟ 555 555 0 7 7 0 562 562 0 2 0 202 202 0
1.2 GSA 1 test / 1500 mᶟ 555 555 0 7 7 0 562 562 0 2 0 204 204 0
1.3 LL / PL / PI 1 test / 1500 mᶟ 696 696 0 7 7 0 703 703 0 2 0 204 204 0
1.4 MDD / OMC 1 test / 1500 mᶟ 703 703 0 7 7 0 710 710 0 3 0 210 210 0
1.5 CBR Test 1 test / 3000 mᶟ 356 356 0 7 7 0 363 363 0 3 0 197 197 0
1.6 FDD (Emb. Layer) 1 set / 3000 m² 24913 24873 40 114 114 0 25027 24987 40 34 0 12469 12469 0
1.7 FDD (Sub. Layer) 1 test / 2000 m² 8512 8485 27 144 144 0 8656 8629 27 46 0 5158 5158 0
2.0 TESTS ON OGL SAMPLES (MCW&SR)
2.1 FSI 1 test / 250m 208 208 0 0 0 0 208 208 0 0 0 83 83 0
2.2 GSA 1 test / 250m 208 208 0 0 0 0 208 208 0 0 0 83 83 0
2.3 LL / PL / PI 1 test / 250m 206 206 0 0 0 0 206 206 0 0 0 83 83 0
2.4 MDD / OMC 1 test / 250m 211 211 0 0 0 0 211 211 0 0 0 84 84 0
2.5 CBR Test As Required 32 32 0 0 0 0 32 32 0 0 0 16 16 0
2.6 FDD (OGL) Min. 6 Pit 1632 1632 0 0 0 0 1632 1632 0 0 0 1134 1134 0
3.0 TESTS ON EXCAVATED SOIL
3.1 FSI 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.2 GSA 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.3 LL / PL / PI 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.4 MDD / OMC 1 test / 1500 mᶟ 14 14 0 0 0 0 14 14 0 0 0 5 5 0
3.5 CBR Test As Required 7 7 0 0 0 0 7 7 0 0 0 5 5 0
4.0 TEST ON GRANULAR SUB BASE COURSE (GSB)
4.1 GRADATION 1 test / 400 mᶟ 759 759 0 30 30 0 789 789 0 10 0 333 333 0
4.2 LL / PL / PI 1 test / 400 mᶟ 759 759 0 30 30 0 789 789 0 10 0 281 281 0
4.3 MDD / OMC 1 tset / source 12 12 0 0 0 0 12 12 0 0 0 10 10 0
4.4 CBR Test 1 tset / source 12 12 0 0 0 0 12 12 0 0 0 10 10 0
4.5 AIV As Required 15 15 0 0 0 0 15 15 0 0 0 16 16 0
4.6 FDD (GSB) 1 test / 1000 m² 1777 1770 7 12 12 0 1789 1782 7 8 0 789 789 0
5.0 TEST ON AGGREGATE BASE COURSE (WMM)
5.1 Mix Aggregate Gradation 1 test / 200 mᶟ 769 769 0 43 43 0 812 812 0 10 0 317 317 0
5.2 Plasticity Index 1 test / 200 mᶟ 743 743 0 43 43 0 786 786 0 10 0 262 262 0
5.3 AIV 1 test / 1000 mᶟ 207 207 0 9 9 0 216 216 0 2 0 74 74 0
5.4 MDD / OMC 1 tset / source 6 6 0 0 0 0 6 6 0 0 0 4 4 0
5.5 Water Absorption 1 tset / source 6 6 0 0 0 0 6 6 0 0 0 3 3 0
5.6 FI & EI 1 test / 500 mᶟ 350 350 0 18 18 0 368 368 0 3 0 90 90 0
5.7 FDD (WMM) 1 Set of 3 test / 1000 mᶟ 3184 3156 28 103 103 0 3287 3259 28 40 0 1241 1241 0
5.8 FDD (DLC) 1 Set of 3 test / 2000 mᶟ 497 497 0 54 54 0 551 551 0 18 0 175 175 0
5.9 FDD (SHOULDER) 1 test / 2000 m² 474 474 0 0 0 0 474 474 0 0 0 216 216 0
5.10 FDD (MEDIAN) 1 test / 2000 m² 105 105 0 0 0 0 105 105 0 0 0 45 45 0
5.11 FDD (BACKFILLING) MIn. 3 Pit 216 216 0 0 0 0 216 216 0 0 0 63 63 0
6.0 FINE AGGREGATE (SAND FOR CONCRETE)
6.1 Sieve Analysis / Gradation On Daily Basis 356 356 0 28 28 0 384 384 0 7 0 174 174 0
6.2 Specific Gravity (SSD) As Required 78 78 0 2 2 0 80 80 0 1 0 40 40 0
TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK
TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
6.3 Water Absorption / Moisture Content On Daily Basis 325 325 0 28 28 0 353 353 0 8 0 160 160 0
6.4 Silt Content Once in a week 118 118 0 10 10 0 128 128 0 4 0 104 104 0
7.0 COARSE AGGREGATE (FOR CONCRETE)
7.1 Sieve Analysis / Gradation of 10mm On Daily Basis 444 444 0 28 28 0 472 472 0 12 0 183 183 0
7.2 Sieve Analysis / Gradation of 20mm On Daily Basis 440 440 0 28 28 0 468 468 0 12 0 183 183 0
7.3 Sieve Analysis / Gradation of All in Aggregate On Daily Basis 326 326 0 28 28 0 354 354 0 10 0 141 141 0
7.4 Specific Gravity (3test = 1 set) As Required 79 79 0 2 2 0 81 81 0 1 0 35 35 0
7.5 AIV One for each source 101 101 0 5 5 0 106 106 0 1 0 42 42 0
7.6 FI & EI One for each source 83 83 0 2 2 0 85 85 0 1 0 34 34 0
7.7 Water Absorption / Moisture Content On Daily Basis 287 287 0 28 28 0 315 315 0 8 0 108 108 0
8.0 CEMENT/FLY ASH
Physical Tests (Cement)
8.1 Fineness Test 1 test per lot 156 156 0 10 10 0 166 166 0 2 0 53 53 0
8.2 Standard Consistency Test 1 test per lot 126 126 0 10 10 0 136 136 0 3 0 48 48 0
8.3 Soundness Test 1 test per lot 106 106 0 10 10 0 116 116 0 2 0 43 43 0
8.4 Intial & Final Setting Time Test 1 test per lot 126 126 0 10 10 0 136 136 0 3 0 48 48 0
8.5 Compressive Strength Test 1 test per lot
(i) 3 Days (Set) 74 74 0 3 3 0 77 77 0 1 0 32 32 0
(ii) 7 Days (Set) 77 77 0 3 3 0 80 80 0 1 0 33 33 0
(iii) 28 Days (Set) 86 86 0 3 3 0 89 89 0 1 0 38 38 0
Physical Tests (Fly Ash)
8.6 Gradation 1 test per lot 45 45 0 4 4 0 49 49 0 1 0 22 22 0
8.7 Fineness Test 1 test per lot 60 60 0 4 4 0 64 64 0 1 0 24 24 0
8.8 Sp. Gravity As Required 8 8 0 1 1 0 9 9 0 1 0 5 5 0
9.0 PRIME COAT / TACK COAT
9.1 Rate of Spray ( PRIME COAT ) 3 test / Day 242 242 0 21 21 0 263 263 0 5 0 116 116 0
9.2 Rate of Spray ( TACK COAT ) FOR DBM 3 test / Day 242 242 0 21 21 0 263 263 0 5 0 116 116 0
9.3 Rate of Spray ( TACK COAT ) FOR BC 3 test / Day 0 0 0 18 18 0 18 18 0 3 0 6 6 0
10.0 DENSE BITUMEN MACADAM (DBM)
10.1 Sieve Analysis 1 test for each 182 182 0 15 15 0 197 197 0 6 0 91 91 0
400 ton of mix & Min. 2
10.2 Bitumen Extraction & Gradation Test test / day
196 196 0 15 15 0 211 211 0 6 0 105 105 0
10.3 Aggregate Impact Value 1 test / 350 mᶟ 113 113 0 8 8 0 121 121 0 2 0 43 43 0
10.4 Comb. Flakiness & Elongation Index 1 test / 350 mᶟ 113 113 0 8 8 0 121 121 0 2 0 40 40 0
10.5 GMM 1 test / day 101 101 0 7 7 0 108 108 0 3 0 51 51 0
10.6 Marshall Stability, Flow, VMA, VFB, & Air Voids 1set / 3mould 405 405 0 15 15 0 420 420 0 5 0 188 188 0
10.7 Drilled Core Density 1test / 700 m² 422 422 0 29 29 0 451 451 0 14 0 231 231 0
10.8 Sp. Gravity & Water Absorption As Required 0 0 0 1 1 0 1 1 0 1 0 1 1 0
11.0 BITUMINOUS CONCRETE (BC)
11.1 Sieve Analysis 1 test for each 400 MT 0 0 0 15 15 0 15 15 0 6 0 6 6 0
400 ton of mix & Min. 2
11.2 Bitumen Extraction & Gradation Test 0 0 0 15 15 0 15 15 0 6 0 6 6 0
test / day
11.3 Aggregate Impact Value 1 test / 350 mᶟ 0 0 0 8 8 0 8 8 0 2 0 2 2 0
TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK
TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
11.4 Comb. Flakiness & Elongation Index 1 test / 350 mᶟ 0 0 0 8 8 0 8 8 0 2 0 2 2 0
11.5 Stripping Value Test 1 test / source 0 0 0 1 1 0 1 1 0 2 0 2 2 0
11.6 Marshall Stability, Flow, VMA, VFB, & Air Voids 1set / 3mould 0 0 0 15 15 0 15 15 0 5 0 5 5 0
11.7 Drilled Core Density 1test / 700 m² 0 0 0 75 75 0 75 75 0 19 0 19 19 0
11.8 Sp. Gravity & Water Absorption As Required 0 0 0 1 1 0 1 1 0 1 0 1 1 0
12.0 BITUMEN VG-30
12.1 Penetration Grade at 25 Degree 1 test / lot 131 131 0 8 8 0 139 139 0 2 0 51 51 0
12.2 Softening Point 1 test / lot 131 131 0 8 8 0 139 139 0 2 0 51 51 0
12.3 Dutility at 27 Degree 1 test / lot 122 122 0 3 3 0 125 125 0 1 0 47 47 0
12.4 Viscosity 1 test / lot 96 96 0 5 5 0 101 101 0 2 0 42 42 0
12.5 Specific Gravity 1 test / lot 108 108 0 2 2 0 110 110 0 1 0 43 43 0
13.0 CONCRETE CUBE TESTING (SITE)
13.1 7 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 367 367 0 7 7 0 374 374 0 2 0 138 138 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 263 263 0 20 20 0 283 283 0 8 0 116 116 0
(iii) M-20 KERB (SET) MORT&H - Section 1700 187 187 0 22 22 0 209 209 0 8 0 83 83 0
(iv) M-25 RCC (SET) MORT&H - Section 1700 223 223 0 26 26 0 249 249 0 6 0 67 67 0
(v) M-30 RCC (SET) MORT&H - Section 1700 910 910 0 47 47 0 957 957 0 10 0 379 379 0
(vi) M-35 RCC (SET) MORT&H - Section 1700 139 139 0 11 11 0 150 150 0 3 0 58 58 0
(vii) M-35 PILE (SET) MORT&H - Section 1700 282 282 0 2 2 0 284 284 0 1 0 40 40 0
(viii) M-35 RE PANNEL (SET) MORT&H - Section 1700 361 361 0 71 71 0 432 432 0 15 0 85 85 0
(iX) M-40 RCC (SET) MORT&H - Section 1700 18 18 0 9 9 0 27 27 0 2 0 9 9 0
(X) M40 PILE (SET) MORT&H - Section 1700 30 30 0 0 0 0 30 30 0 0 0 4 4 0
(XI) M50 PSC (SET) MORT&H - Section 1700 0 0 0 1 1 0 1 1 0 1 0 1 1 0
(XII) M-45 PSC (SET) MORT&H - Section 1700 1 1 0 4 4 0 5 5 0 2 0 3 3 0
(XIII) DLC MORT&H - Section 600 534 534 0 48 48 0 582 582 0 6 0 169 169 0
(XIV) PQC (CUBE) MORT&H - Section 600 667 667 0 60 60 0 727 727 0 24 0 287 287 0
(XV) PQC ( BEAM) MORT&H - Section 600 667 667 0 60 60 0 727 727 0 24 0 287 287 0
13.2 28 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 458 458 0 42 42 0 500 500 0 9 0 73 73 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 340 340 0 18 18 0 358 358 0 3 0 37 37 0
(iii) M-20 KERB (SET) MORT&H - Section 1700 610 610 0 72 72 0 682 682 0 16 0 106 106 0
(iv) M-25 RCC (SET) MORT&H - Section 1700 249 249 0 54 54 0 303 303 0 14 0 68 68 0
(v) M-30 RCC (SET) MORT&H - Section 1700 1890 1890 0 103 103 0 1993 1993 0 35 0 333 333 0
(vi) M-35 RCC (SET) MORT&H - Section 1700 451 451 0 33 33 0 484 484 0 14 0 93 93 0
(vii) M-35 PILE (SET) MORT&H - Section 1700 696 696 0 28 28 0 724 724 0 8 0 157 157 0
(viii) M-35 RE PANNEL (SET) MORT&H - Section 1700 725 725 0 129 129 0 854 854 0 48 0 189 189 0
(iX) M-40 RCC (SET) MORT&H - Section 1700 24 24 0 7 7 0 31 31 0 2 0 19 19 0
(X) M40 PILE (SET) MORT&H - Section 1700 27 27 0 0 0 0 27 27 0 0 0 20 20 0
(XII) M-45 PSC (SET) MORT&H - Section 1700 0 0 0 7 7 0 7 7 0 2 0 0 0 0
(XIII) M50 PSC (SET) MORT&H - Section 1700 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(XIV) PQC (CUBE) MORT&H - Section 600 404 404 0 60 60 0 464 464 0 25 0 106 106 0
(XV) PQC ( BEAM) MORT&H - Section 600 404 404 0 60 60 0 464 464 0 25 0 106 106 0
TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK
TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
14.0 CONCRETE CUBE/BEAM TESTING (MIX DESIGN
TRIALS)
14.1 7 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(iii) M-25 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(iv) M-30 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(v) M-35 RCC (SET) MORT&H - Section 1700 1 1 0 0 0 0 1 1 0 0 0 1 1 0
(vi) M-35 PILE (SET) MORT&H - Section 1700 3 3 0 0 0 0 3 3 0 0 0 3 3 0
(vii) M-40 RCC (SET) MORT&H - Section 1700 2 2 0 0 0 0 2 2 0 0 0 2 2 0
(viii) M-45 PSC (SET) MORT&H - Section 1700 72 72 0 0 0 0 72 72 0 0 0 39 39 0
(ix) M40 PILE (SET) MORT&H - Section 1700 53 53 0 0 0 0 53 53 0 0 0 16 16 0
(x) DLC MORT&H - Section 600 6 6 0 0 0 0 6 6 0 0 0 25 25 0
(xi) PQC MORT&H - Section 600 49 49 0 5 5 0 54 54 0 2 0 35 35 0
(xii) M50 PSC MORT&H - Section 1700 6 6 0 7 7 0 13 13 0 4 0 9 9 0
14.2 28 Days
(i) M-15 PCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(ii) M-20 PCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(iii) M-25 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(iv) M-30 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(v) M-35 RCC (SET) MORT&H - Section 1700 2 0 0 0 0 0 2 0 0 0 0 2 2 0
(vi) M-35 PILE (SET) MORT&H - Section 1700 4 2 0 0 0 0 4 2 0 0 0 3 3 0
(vii) M-40 RCC (SET) MORT&H - Section 1700 26 0 0 0 0 0 26 0 0 0 0 26 26 0
(viii) M-45 PSC (SET) MORT&H - Section 1700 51 51 0 0 0 0 51 51 0 0 0 8 8 0
(iX) M40 PILE (SET) MORT&H - Section 1700 49 47 0 0 0 0 49 47 0 0 0 11 11 0
(x) PQC MORT&H - Section 600 49 49 0 4 4 0 53 53 0 2 0 7 7 0
(XI) M50 PSC MORT&H - Section 1700 6 6 0 6 6 0 12 12 0 4 0 4 4 0
15.0 THIRD PARTY TESTING
15.1 Soil Testing
(i) FSI As Required 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(ii) GSA (Silt & Clay) As Required 13 13 0 0 0 0 13 13 0 0 0 0 0 0
(iii) LL / PL / PI As Required 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(iv) MDD / OMC As Required 9 9 0 0 0 0 9 9 0 0 0 0 0 0
(v) CBR Test As Required 6 6 0 0 0 0 6 6 0 0 0 0 0 0
(vi) Shrinkage Limit As Required 6 6 0 0 0 0 6 6 0 0 0 0 0 0
(vii) Soluble Sulphate Test As Required 9 9 0 0 0 0 9 9 0 0 0 0 0 0
(viii) Soil Bearing Capacity (Plate Load Test) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(IX) C & Φ Value As Required 12 12 0 0 0 0 12 12 0 0 0 0 0 0
15.2 Steel
(i) 8mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(ii) 10mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(iii) 12mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
(iv) 16mm (3pc = 1 set) 1 test / lot 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(v) 20mm (3pc = 1 set) 1 test / lot 2 2 0 0 0 0 2 2 0 0 0 0 0 0
TESTS CONDUCTED DURING CURRENT TOTAL TESTS CONDUCTED BY TOTAL TESTS CONDUCTED BY AE UP TO THIS
TOTAL TEST UPTO PREVIOUS MONTH TOTAL TESTS UPTO THIS MONTH AE DURING CURRENT MONTH MONTH
SR. NO. DESCRIPTION FREQUENCY OF TEST MONTH REMARK
TESTED PASSED FAILED TESTED PASSED FAILED TESTED PASSED FAILED PASSED FAILED TESTED PASSED FAILED
(vi) 25mm (3pc = 1 set) 1 test / lot 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(vii) 32mm (3pc = 1 set) 1 test / lot 2 2 0 1 1 0 3 3 0 0 0 0 0 0
(viIi) 36mm (3pc = 1 set) 1 test / lot 3 3 0 0 0 0 3 3 0 0 0 0 0 0
15.3 Aggregate
(i) Fine Aggregate As Required 1 1 0 1 1 0 2 2 0 0 0 0 0 0
(ii) Coarse Aggregate (10mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(iii) Coarse Aggregate (20mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(iv) Coarse Aggregate (40mm) As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(v) GSB As Required 1 1 0 0 0 0 1 1 0 0 0 0 0 0
15.4 Cement
(i) Ultratech (OPC-43) 1 test / 500 MT 1 1 0 0 0 0 1 1 0 0 0 0 0 0
(ii) Shree (OPC-43) 1 test / 500 MT 1 1 0 0 0 0 1 1 0 0 0 0 0 0
15.5 Water As Required 4 4 0 0 0 0 4 4 0 0 0 0 0 0
15.6 Hume pipe Testing(1200mm dia) As Required 8 8 0 0 0 0 8 8 0 0 0 0 0 0
15.7 Hume pipe Testing(600mm dia) As Required 8 8 0 0 0 0 8 8 0 0 0 0 0 0
15.8 Admixture As Required 2 2 0 1 1 0 3 3 0 0 0 0 0 0
16.0 CALIBRATION IN-HOUSE
16.1 Batching Plant CP-30 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.2 Batching Plant CP-2.50 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.3 Batching Plant CP-18 6 Month 2 2 0 1 1 0 3 3 0 1 0 1 1 0
16.4 Hot Mix Plant 6 Month 2 2 0 0 0 0 2 2 0 0 0 2 2 0
16.5 WMM Mix Plant 6 Month 2 2 0 0 0 0 2 2 0 0 0 1 1 0
ANNEXURE -"F"
CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA
AUTHORITY'S ENGINEER : MSV INTERNATIONAL INC.
: M/s DILIP BUILDCON LIMITED
EPC CONTRACTOR M/s VARAHA INFRA LIMITED (JV)