PROJECT NAME

AREA STATEMENT

S.N. Scope Floor Name

1 Basement Lift Lobby BS


2 Lower Basement Lift Lobby LG
3 Lower Basement Toilets- Ladies LG
4 Lower Basement Toilets- Gents LG
5 GF Floor Entrance Lobby + Reception GF
6 GF Floor Drop Off area + Ramp GF
7 Staircase at Drop Off area GF
8 Security Lounge GF
9 GF Lift Lobby GF
10 GF- Ladies Toilet Typ 01 & 02 GF
11 GF- Gents Toilet Typ 01 & 02 GF
12 GF- Security Lounge Toilet GF
13 Ground Floor- H. Toilet GF
14 Typical Lift Lobby (1,2,3,4,5,6)
15 Terrace Lift Lobby (Terrace floor)
16 GF- Ladies Toilet Typ 01 & 02 (1,2,3,4,5,6)
17 GF- Gents Toilet Typ 01 & 02 (1,2,3,4,5,6)
18 Terrace Floor Ladies Toilet ( Terrace floor)
19 Terrace Floor Gents Toilet ( Terrace floor)
20 Typical H. Toilets (1,2,3,4,5,6 th floor)
21 All Janitors GF to 6 th Lvl
22 Janitors open Terrace Lvl
Total of Above
No of True Level Ceiling
Area in Total
Typical Ht ( in Level Ht Remark
Sqft Area Sqft
entities Mtr) ( in Mtr)
1 4.2 -
1 3.6 -
1 3.6 -
1 3.6 -
1 4.05 3 -
1 4.05 3 -
1 -
1 3 -
1 3 -
1 4.05 3 -
1 4.05 3 -
1 4.05 3 -
1 4.05 3 -
6 4.05 3 -
1 4.05 3 -
6 4.05 3 -
6 4.05 3 -
1 4.05 3 -
1 4.05 3 -
6 4.05 3 -
8 4.05 3 -
1 4.05 3 -
48 - -