AG BUILDERS INC

Project : FLOOD CONTROL PROJECT - WESTERN RIVER STO TOMAS / BUCAO RIVER, ZAMBALPERIOD FROM August 11,2018 TO August 17,2018

LOCATION : LEFT SIDE, UPSTREAM FROM Sta. 7+509 TO Sta. 7+740


ITEM NUMBER

Sta. 7+509

Sta. 7+520

Sta. 7+540

Sta. 7+560

Sta. 7+580

Sta. 7+600

Sta. 7+620

Sta. 7+640

Sta. 7+660

Sta. 7+680

Sta. 7+700

Sta. 7+720

Sta. 7+740
AND
DESCRIPTION
622(3)a - VEGITATION
622(1)a - COCONETS
201(1) - BASECOURSE
510(2) - BERM
510(2) - CONCRETE SLOPE 2ND LIFT
EMBANKMENT FOR WIDENING
104(1)b - EMBANKMENT 2ND LIFT
EMBANKMENT FOR WIDENING
510(2) - CONCRETE SLOPE 1ST LIFT
104(1)b - EMBANKMENT 1ST LIFT
510(2) - PRECAST FOUNDATION
103(1)a - EXCAVATION
511(1) - GABION

LOCATION : LEFT SIDE, UPSTREAM FROM Sta. 7+740 TO Sta. 8+040

ITEM NUMBER
Sta. 7+740

Sta. 7+760

Sta. 7+780

Sta. 7+800

Sta. 7+820

Sta. 7+840

Sta. 7+860

Sta. 7+880

Sta. 7+900

Sta. 7+920

Sta. 7+940

Sta. 7+960

Sta. 7+980

Sta. 8+000

Sta. 8+020

Sta. 8+040
AND
DESCRIPTION
622(3)a - VEGITATION
622(1)a - COCONETS
201(1) - BASECOURSE
510(2) - BERM
510(2) - CONCRETE SLOPE 2ND LIFT

104(1)b - EMBANKMENT 2ND LIFT


EMBANKMENT FOR WIDENING
510(2) - CONCRETE SLOPE 1ST LIFT
104(1)b - EMBANKMENT 1ST LIFT
510(2) - PRECAST FOUNDATION
103(1)a - EXCAVATION
511(1) - GABION

LEGEND: Accomplishment (TO DATE) EXISTING

Accomplishment (PREVIOUS) Last Week ( August 1, 2018 )


AG BUILDERS INC
Project : FLOOD CONTROL PROJECT - WESTERN RIVER STO TOMAS / BUCAO RIVER, ZAMBALPERIOD FROM August 11,2018 TO August 17,2018

LOCATION : LEFT SIDE, UPSTREAM FROM Sta. 8+040 TO Sta. 8+340


ITEM NUMBER

Sta. 8+040

Sta. 8+060

Sta. 8+080

Sta. 8+100

Sta. 8+120

Sta. 8+140

Sta. 8+160

Sta. 8+180

Sta. 8+200

Sta. 8+220

Sta. 8+240

Sta. 8+260

Sta. 8+280

Sta. 8+300

Sta. 8+320

Sta. 8+340
AND
DESCRIPTION
622(3)a - VEGITATION
622(1)a - COCONETS
201(1) - BASECOURSE
510(2) - BERM
510(2) - CONCRETE SLOPE 2ND LIFT

104(1)b - EMBANKMENT 2ND LIFT EMBANKMENT FOR WIDENING AND SLOPING


510(2) - CONCRETE SLOPE 1ST LIFT
104(1)b - EMBANKMENT 1ST LIFT
EMBANKMENT FOR WIDENING
510(2) - PRECAST FOUNDATION EMBANKMENT FOR WIDENING
103(1)a - EXCAVATION
511(1) - GABION

LOCATION : LEFT SIDE, UPSTREAM FROM Sta. 8+340 TO Sta. 8+640

ITEM NUMBER
Sta. 8+340

Sta. 8+360

Sta. 8+380

Sta. 8+400

Sta. 8+420

Sta. 8+440

Sta. 8+460

Sta. 8+480

Sta. 8+500

Sta. 8+520

Sta. 8+540

Sta. 8+560

Sta. 8+580

Sta. 8+600

Sta. 8+620

Sta. 8+640
AND
DESCRIPTION
622(3)a - VEGITATION
622(1)a - COCONETS
201(1) - BASECOURSE
510(2) - BERM
510(2) - CONCRETE SLOPE 2ND LIFT

104(1)b - EMBANKMENT 2ND LIFT


510(2) - CONCRETE SLOPE 1ST LIFT
EMBANKMENT FOR WIDENING AND SLOPING
104(1)b - EMBANKMENT 1ST LIFT
510(2) - PRECAST FOUNDATION
103(1)a - EXCAVATION
511(1) - GABION

LEGEND: Accomplishment (TO DATE) EXISTING

Accomplishment (PREVIOUS) Last Week ( March 17, 2018 )


AG BUILDERS INC
Project : FLOOD CONTROL PROJECT - WESTERN RIVER STO TOMAS / BUCAO RIVER, ZAMBALES PERIOD FROM August 11,2018 TO August 17,2018

LOCATION : LEFT SIDE, UPSTREAM FROM Sta. 8+640 TO Sta. 8+835


ITEM NUMBER

Sta. 8+640

Sta. 8+660

Sta. 8+680

Sta. 8+700

Sta. 8+726

Sta. 8+735

Sta. 8+755

Sta. 8+775

Sta. 8+795

Sta. 8+815

Sta. 8+835
AND
DESCRIPTION
622(3)a - VEGITATION RAMP AREA
622(1)a - COCONETS RAMP AREA
201(1) - BASECOURSE RAMP AREA
510(2) - BERM RAMP AREA
510(2) - CONCRETE SLOPE 2ND LIFT RAMP AREA

104(1)b - EMBANKMENT 2ND LIFT


RAMP AREA EMBANKM
510(2) - CONCRETE SLOPE 1ST LIFT RAMP AREA
104(1)b - EMBANKMENT 1ST LIFT RAMP AREA
510(2) - PRECAST FOUNDATION RAMP AREA
103 (1)a - EXCAVATION RAMP AREA
511(1) - GABION RAMP AREA

LEGEND: Accomplishment (TO DATE) EXISTING

Accomplishment (PREVIOUS)
DETAILED QUANTITY CALCULATION
Sta. 7 + 440 - Sta. 8 + 680 = 1,240.00 lin.m.
Sta. 8 + 726 - Sta. 8 + 835 = 109.00 lin.m.
Total Length = 1,349.00 lin.m.
Structure Excavation (Item 103(1))
AVERAGE
STATION AREA (m2) LENGTH VOLUME (m3)
AREA (m2)
7+440 1.1 1.14 60.0 68.67
7+500 1.05 1.12 89.0 99.8135
7+589 1.206 1.19 61.0 72.346
7+650 1.189 1.19 50.0 59.55
7+700 1.193 1.18 50.0 58.975
7+750 1.166 1.14 50.0 57.125
7+800 1.119 1.13 50.0 56.3
7+850 1.133 1.11 50.0 55.275
7+900 1.078 1.09 50.0 54.45
7+950 1.100 1.11 50.0 55.375
8+000 1.115 1.09 50.0 54.375
8+050 1.060 1.09 50.0 54.375
8+100 1.115 1.12 50.0 55.85
8+150 1.119 1.10 50.0 54.875
8+200 1.076 1.10 50.0 55.1
8+250 1.128 1.11 50.0 55.5
8+300 1.092 1.10 50.0 54.8
8+350 1.100 1.10 50.0 55
8+400 1.100 1.10 50.0 55
8+450 1.100 1.10 50.0 54.825
8+500 1.093 1.10 50.0 54.825
8+550 1.100 1.08 50.0 53.75
8+600 1.050 1.07 50.0 53.5
8+650 1.090 1.10 30.0 32.85
8+680 1.100 0.00 0.0 0
1382.5045

8+726 1.122 1.12 24.0 26.82


8+750 1.113 1.11 50.0 55.325
8+800 1.100 1.11 35.0 38.85
8+835 1.120 0.00 0.0 0
8+900 0.000 0.00 0.0 0
8+965 0.000 0.00 0.0 0
120.995
1382.5045
Total Volume 1503.4995