You are on page 1of 63

Rev Date

Structure Calculation Connection Design


for Alar Hotel
4 29-04-2020

Project Title: - Alar Hotel

Structure Calculation Connection Design


by thyssenKrupp - Pre sales & Engineering Department -tkEQ

1
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

CONTENTS:

1. DESIGN CRITERIA & STANDARD

2. STEEL BEAM DEFLECTION CALCULATION

3. STEEL BEAM CONNECTION WITH CONCRETE DESIGN

4. ANCHOR BOLT LOAD DETAILS

5. GUIDERAIL VERIFICATION CALCULATION

6. GUIDERAIL BRACKET CONNECTION WITH CONCRETE

7. GUIDERAIL BRACKET CONNECTION WITH STEEL BEAM

8. MACHINE BED & BASE PLATE LOAD DETAILS

9. HOISTING HOOK DETAILS

10.
REFERENCE DRAWINGS

11.
CONCLUSION

2
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

1. DESIGN CRITERIA & STANDARD

3
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

DESIGN CRITERIA & STANDARD

Standards:

We have considered for the verification of the steel members the Manual of Steel
Construction of the American Institute of Steel Construction Inc. AISC .

Deflection and drift criteria:

All members satisfy a deflection limit under service loads of L/360 and in overall the
Structure has a drift under gravity loads of 5mm.

Method of analysis:

The structure has been modelled & analyzed using the computer program Staad Pro and
thyssenkrupp factory calculation. The structure model is composed by linear members and
joints. At the bottom joints have been assumed as fixed supports and wall support is to be
only transmitting the horizontal forces (FX & FZ only).

Calculation results:

We include attached to this criteria a report including the input data, geometry,
mechanical properties of members, buckling factors, load cases, displacements,
reactions, stresses, demand/capacity factors, deflections. We also include some 2d
views showing joint labels and geometry as well.

4
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

2. STEEL BEAM DEFLECTION CALCULATION

5
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

Steel beam deflection calculation


Description of structure:

The geometry adapted for the model of the structure is based on the Architectural
Drawings

Materials:
All members used in the structure are specified as ASTM A36 (equivalent to the BS EN
10025, Grade S275 JR).

Lateral supports on R.C.: we understand we will attach the structure to the concrete
When ever we have floor slab. Therefore we will have 2 supports whenever the floor
slab exists on both side at any particular level in order to minimize the load transferred to
the main structure.

Steel Beam Size Lifts Number wise

Lift Number Steel beam Length Steel Beam size & Type Steel Beam Grade

PL01~PL03 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL04~PL05 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL06~PL08 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL09 Single Shaft RCC Single Shaft RCC Single Shaft RCC

PL10~PL11 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL12 Single Shaft RCC Single Shaft RCC Single Shaft RCC

SL1 & SL3 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275

SL2 & SL4 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275

SL5 & SL6 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275

Note: All others Lifts are single shaft

Design of Steel Separate Beam

The steel separate beam length is verified the size from 2.07m to 3.12m. The maximum
steel separate beam length is 3.12m (SL1~SL3 Lifts)

6
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

Kindly refer Bracket details page


number 7~17

7
Installation Manual

Figure 2-5 Processing anchor bolt hole


a) Installing car rail support
a.1) Connect the fixed support to the well wall:

The surface is required to be a horizontal


plane with the offset less than 2mm. The
fixed bracket may be adjusted with a
Fixed support gasket to guarantee it is on a horizontal
plane. Upon adjustment, the gasket shall
be welded with the supports via two
points to avoid the gasket from falling off
due to vibration.

Expansion drive
pipe

Spring Bolt M12


Taper screw Big washer washer 12
12

Figure 2-6 Installing the fixed support


a.2) Connect the rail support to the fixed support by weld, the weld is progressive fillet welding line, the
height of weld equals to the thickness of steel plate.

8
Rail support
Full weld

Full weld

Fixed support

Figure 2-7 Installing the rail support


b) Installing the counterweight rail support
b.1) Connect the fixed support to the well wall:

The surface is required to be a horizontal


plane. The fixed support may be adjusted
with a gasket to guarantee it is on a
Fixed support horizontal plane. Upon adjustment, the
gasket shall be welded with the supports
via two points to avoid the gasket from
falling off due to vibration.

Expansion drive
pipe

Taper screw Big washer Spring Bolt M12


washer 12

Figure 2-8 Installing fixed support


b.2) Connect the rail support to the fixed support:
Making fillet weld, weld is progressive and weld height equals to the thickness of steel plate. It should be
ensured that the horizontal degree of car guide rail bracket transom is less than 5mm, and the vertical
offset is less than 0.3mm. Define the position of CWT guide rail bracket by plumb line, and tighten it by
the bolts, full weld it after affirming the position again. See the picture 2-9.

Full
weld

Full
weld

9
Full
weld

Note: when it is used in the


second (counting from the
pit upwards) rail support,
the places marked with full
welds shall be changed into
Full
weld
point welds for two points in
each side; after the
counterweight frame is
installed in, the marked
place will be fastened with
full weld.

raker

Full weld Full weld

Crosspiece
Bolt M12
Rail support
Spring washer
Fixed support 12
Big washer 12

Big washer 12

Bolt M12×40

Figure 2-9 Installing rail support


2.7 Installing the guide rail
Instruction: the guide rail of the car top is 4m; the upper end face is plane; there are sunk coaks in the
lower end, as shown in figure 2-10; its installation location in the well is shown in figure 2-11; the legnth
of the guide rail on the car top cannot be changed during the field installation. Therefore, before installing
the car guide rail, calculate the length of the guide rail in the bottom of the well according to the well
height and the situation of the configured guide rail; the installation personnel shall process (saw) the
bottom guide rail according to the length calculated.

10
Installation steps of guide rail
a) Installing the car rail
a.1) Connection of the guide rail and the rail seat:

T89/B or T75-3/B guide rail

Bolt M12

Spring
washer 12

Big washer 12
Spacer
Rail seat
Compression
guide plate
Spacer shim

Bolt M12×45

Figure 2-13 Installing bottom rail


a.2) Connection between guide rail and rail support:
T89/B or T75-4/B guide rail

Rail support

Big washer 12

Spring
washer 12
Bolt M12

Spacer Rail Clip

Bolt M12×40

Figure 2-14 Connection of guide rail and support

11
a.3) Connection between guide rails
Rail connection plate

Guide rail

Guide
rail

Bolt M12 Spring Flat washer 12 Bolt M12×50


washer 12

Figure 2-15 Connection between guide rails


b) Installing counterweight rail
b.1) Connection between guide rail and rail seat:
TK5A guide rail

Bolt M12

Spring
washer 12 Spacer

Big washer 12 Compression


guide plate

Rail seat
Spacer shim
Bolt M12×60

Figure 2-16 Installing bottom rail

12
b.2) Connection between guide rail and rail support:
Big washer 12 Spring washer
Bolt M12
12
Bolt M12×50 Compression
guide plate Spacer

Bolt M12 Rail support

Spring washer 12

Big washer 12

Counterweight rail frame

TK5A guide rail


Spacer

Compression
guide plate

Bolt M12×40

T89/B or T75-3/B guide rail

Figure 2-17 Connecting guide rail to support


b.3) Connections between guide rails:

13
Installation Manual

Figure 2-21 Guide Rail after Completion of Installation

14
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

Steel Separate Beam deflection design calculation

Note: 150 x 150 beam is more than enough calculation however, we have considered 200 x 200 mm
steel beam in higher side Note: Load capacity factor considered 0.3 I/O 0.2, due to higher side.
15
STTAD PRO TOOL STEEL BEAM CALCUALTION & CERITIRA

16
17
Moment resulting from connection eccentricity load added

18
Moment resulting from connection eccentricity load added

19
Moment resulting from connection eccentricity load added
20
Moment resulting from connection eccentricity load added

21
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

3. STEEL BEAM CONNECTION WITH


CONCRETE WALL

22
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

Steel Beam connection with Concrete Loads details

The loads input on each beam are comprised by three different forces: FY, FX * 2, which is
transferred to steel beam fixing on wall area.

Reference lifts number Tower SL1~SL4

FY load = 2.2 KN / 231 kgs


FX load = 2.8 KN / 295 kgs * 2

Lift Number Steel beam Length Steel Beam size & Type Steel Beam Grade

PL01~PL03 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL04~PL05 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL06~PL08 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL09 Single Shaft RCC Single Shaft RCC Single Shaft RCC

PL10~PL11 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL12 Single Shaft RCC Single Shaft RCC Single Shaft RCC

SL1 & SL3 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275

SL2 & SL4 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275

SL5 & SL6 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275

Load case 1: cabin ecc. Left” loads due to the eccentricity and emergency break of the cabin.
Load case 2: cabin ecc. Right” loads due to the eccentricity and emergency break of the
cabin.

The guide rail loads that were given by the manufacturer are input on each of
The beams supporting the guide rail. These loads were input in two sets, case 1 and
Case 2, corresponding to each side of the cabin.

23
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

The above details are indicated the Load acting in the steel beam fixing area of wall. The
details of anchor bolt and guide rails load details are following contents part 4, 5, 6 & 7.

24
25
26
Welding Calculation

𝑃𝑉 = 1 𝐾𝑁

𝑃𝐻 = 10 𝐾𝑁

a = 6mm

Welding Verification as per EN 1993_1_8

EN 1993_1_8 4.5.3.2

A [𝜗⊥ 2 + 3 (𝜏⊥ 2 + 𝜏∥ 2 )]0,5 ≤ 𝛿𝜐⁄𝛽𝜔 𝛾𝜇


2

B 𝜗⊥ ≤ 𝛿𝜐⁄𝛾𝜇2

1. S275 → 𝛿𝜐 = 410 𝑁⁄
𝑚𝑚2
2. As per Table 4.1 → 𝛽𝜔 = 0,85

𝛾𝜇2 = 1,25
𝐹 (𝑝𝑒𝑟𝑝𝑒𝑛𝑑𝑖𝑐𝑢𝑙𝑎𝑟 𝑜𝑛 𝑡ℎ𝑒 𝑤𝑒𝑙𝑑) 10 𝐾𝑁
3. 𝜗⊥ = 𝜏⊥ = = 6𝑥100 = 1,96 𝑁⁄
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑤𝑒𝑙𝑑 𝑥 𝑎𝑥√2 𝑚𝑚 x 6𝑥√2 𝑚𝑚2
𝜏∥ = 0

4. Verification
410
A [1,962 + 3 (1,962 + 𝑜 2 )]0,5 = 3,92 𝑁⁄ < = 385 𝑁⁄
𝑚𝑚2 1,25 𝑥 0,85 𝑚𝑚2

410
B 2,78 𝑁⁄ < = 328 𝑁⁄
𝑚𝑚2 1,14 𝑚𝑚2
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

4. ANCHOR BOLT LOAD DETAILS

28
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

Anchor Bolt Load details

The Anchor bolt using the steel beam bracket fixing and guide rail bracket fixing

Anchor bolt fixing at steel beam (M16)

Anchor bolt fixing at guide rail brackets (M12)

29
30
31
32
33
HIT-HY 200 injection mortar
Anchor design (ETAG 001 / EN 1992-1) / Rods&Sleeves / Concrete
Injection mortar system Benefits

Hilti HIT- HY 200-A - SafeSet technology: Simplified


method of borehole preparation
500 ml foil pack using either Hilti hollow drill bit for
(also available as hammer drilling or Roughening
330 ml foil pack) tool for diamond cored
applications

Hilti HIT- HY 200-R - Suitable for non-cracked and


cracked concrete C 20/25 to C
500 ml foil pack 50/60
(also available as
- ETA Approved for seismic
330 ml foil pack)
performance category C1, C2a)
Anchor rod: - Maximum load performance in
HIT-V cracked concrete and non-
HIT-V-F cracked concrete
HIT-V-R
HIT-V-HCR - High corrosion / corrosion
(M8-M30) resistanceb)
Internally threaded - Small edge distance and anchor
sleeve: spacing possible
HIS-N
HIS-RN - Manual cleaning for borehole
(M8-M20) diameter up to 20mm and hef≤10d
Anchor rod: for non-cracked concrete only
HIT-Z - Two mortar versions: HY 200-R
HIT-Z-F for slow cure applications and HY
HIT-Z-R 200-A for fast cure applications
(M8-M20)
a) HIS-N internally threaded sleeves not approved for Seismic.
b) High Corrosion resistant rods available only for HIT-V. Corrosion resistant rods available for HIT-V and HIS-N

Base material Installation conditions

Concrete Concrete Hammer Diamond Hilti SafeSet Variable Small edge


(non-cracked) (cracked) drilled holes drilled holes c) technology embedment distance and
depth spacing

Load conditions Other information

Static/ Seismic, Fire European CE Corrosion High PROFIS


quasi-static ETA-C1, C2a) resistance Technical conformity resistanceb) corrosion Anchor design
Assessment resistanceb) Software
a) HIS-N internally threaded sleeves not approved for Seismic category C2.
b) High Corrosion resistant rods available only for HIT-V. Corrosion resistant rods available for HIT-V and HIS-N.
c) Diamond drilling covered for HIT-Z rods. Diamond drilling only with Roughening Tool (RT) for HIT-V and HIS-N.

34
1 Updated: May-19
Approvals / certificates
Description Authority / Laboratory No. / date of issue
European technical Assessment a) DIBt, Berlin ETA-11/0493/ 2017-07-28 (HY200 A)
European technical Assessment a) DIBt, Berlin ETA-12/0006/ 2017-05-30 (HY200 A)
European technical Assessment a) DIBt, Berlin ETA-11/0492/ 2014-06-26 (HY200 A)
European technical Assessment a) DIBt, Berlin ETA-12/0084/ 2017-07-28 (HY200 R)
European technical Assessment a) DIBt, Berlin ETA-12/0028/ 2017-05-30 (HY200 R)
European technical Assessment a) DIBt, Berlin ETA-12/0083/ 2018-06-26 (HY200 R)
European technical Assessment a) DIBt, Berlin ETA-18/0837/ 2018-11-29 (HY200 A/R)
Shockproof fastenings in civil Federal Office for Civil BZS D 13-604 / 2013-12-31
defence installations Protection, Bern BZS D 13-603 / 2013-12-31
Fire test report IBMB, Brunswick 3502/676/12 / 2017-09-15
a) All data given in this section according to the ETA approval for the product.

Static and quasi-static resistance (for a single anchor)

All data in this section applies to:


- Correct setting (See setting instruction)
- No edge distance and spacing influence
- Steel failure
- Minimum base material thickness
- One typical embedment depth, as specified in the table
- One anchor material, as specified in the tables
- Concrete C 20/25, fck,cube = 25 N/mm²
- Temperature range I (min. base material temp. -40°C, max. long/short term base material temp.: +24°C/40°C)

For hammer drilled holes, hammer drilled holes with Hilti hollow drill bit:

Anchorage depth 1)
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
HIT-V
Embedment depth [mm] 80 90 110 125 170 210 240 270
Base material thickness [mm] 110 120 140 161 234 266 300 340
HIS-N
Embedment depth [mm] 90 110 125 170 205 - - -
Base material thickness [mm] 120 150 170 230 270 - - -
HIT-Z
Effective anchorage depth2) hef =lHelix [mm] 50 60 60 96 100 - - -
Effective embedment depth3) hef=hnom,min [mm] 70 90 110 145 180 - - -
Base material thickness [mm] 130 150 170 245 280 - - -
1) The allowed range of embedment depth is shown in the setting details.
2) For combined pull-out and concrete cone failure
3) For concrete cone failure
a) Hilti anchor rod HIT-Z-F: M16 and M20

35
Updated: May-19 2
Characteristic resistance
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
Non-cracked concrete
HIT-V 5.8 18,0 29,0 42,0 70,6 111,9 153,7 187,8 224,0
Tension NRk HIS-N 8.8 [kN] 25,0 46,0 67,0 111,9 116,0 - - -
HIT-Z a) 24,0 38,0 54,3 88,2 122,0 - - -
HIT-V 5.8 9,0 15,0 21,0 39,0 61,0 88,0 115,0 140,0
Shear VRk HIS-N 8.8 [kN] 13,0 23,0 34,0 63,0 58,0 - - -
HIT-Z a) 12,0 19,0 27,0 48,0 73,0 - - -
Cracked concrete
HIT-V 5.8 15,1 21,2 35,2 50,3 79,8 109,6 133,9 159,7
Tension NRk HIS-N 8.8 [kN] 24,7 39,9 50,3 79,8 105,7 - - -
HIT-Z a) 21,1 30,7 41,5 62,9 86,9 - - -
HIT-V 5.8 9,0 15,0 21,0 39,0 61,0 88,0 115,0 140,0
Shear VRk HIS-N 8.8 [kN] 13,0 23,0 34,0 63,0 58,0 - - -
HIT-Z a) 12,0 19,0 27,0 48,0 73,0 - - -
a) Hilti anchor rod HIT-Z-F: M16 and M20

Design resistance
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
Non-cracked concrete
HIT-V 5.8 12,0 19,3 28,0 47,1 74,6 102,5 125,2 149,4
Tension NRd HIS-N 8.8 [kN] 16,7 30,7 44,7 74,6 77,3 - - -
HIT-Z a) 16,0 25,3 36,2 58,8 81,3 - - -
HIT-V 5.8 7,2 12,0 16,8 31,2 48,8 70,4 92,0 112,0
Shear VRd HIS-N 8.8 [kN] 10,4 18,4 27,2 50,4 46,4 - - -
HIT-Z a) 9,6 15,2 21,6 38,4 58,4 - - -
Cracked concrete
HIT-V 5.8 10,1 14,1 23,5 33,5 53,2 73,0 89,2 106,5
Tension NRd HIS-N 8.8 [kN] 16,5 26,6 33,5 53,2 70,4 - - -
HIT-Z a) 14,1 20,5 27,7 41,9 58,0 - - -
HIT-V 5.8 7,2 12,0 16,8 31,2 48,8 70,4 92,0 112,0
Shear VRd HIS-N 8.8 [kN] 10,4 18,4 27,2 50,4 46,4 - - -
HIT-Z a) 9,6 15,2 21,6 38,4 58,4 - - -
a) Hilti anchor rod HIT-Z-F: M16 and M20

Recommended loads b)
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
Non-cracked concrete
HIT-V 5.8 8,6 13,8 20,0 33,6 53,3 73,2 89,4 106,7
Tension NRec HIS-N 8.8 [kN] 11,9 21,9 31,9 53.3 55,2 - - -
HIT-Z a) 11,4 18,1 25,9 42,0 58,1 - - -
HIT-V 5.8 5,1 8,6 12,0 22,3 34,9 50,3 65,7 80,0
Shear VRec HIS-N 8.8 [kN] 7,4 13,1 19,4 36,0 33,1 - - -
HIT-Z a) 6,9 10,9 15,4 27,4 41,7 - - -
Cracked concrete
HIT-V 5.8 7,2 10,1 16,8 24,0 38,0 52,2 63,7 76,1
Tension NRec HIS-N 8.8 [kN] 11,9 19,8 23,9 38,0 50,3 - - -
HIT-Z a) 10,0 14,6 19,8 29,9 41,4 - - -
HIT-V 5.8 5,1 8,6 12,0 22,3 34,9 50,3 65,7 80,0
Shear VRec HIS-N 8.8 [kN] 7,4 13,1 19,4 36,0 33,1 - - -
HIT-Z a) 6,9 10,9 15,4 27,4 41,7 - - -
a) Hilti anchor rod HIT-Z-F: M16 and M20
b) With overall partial safety factor for action  = 1,4. The partial safety factors for action depend on the type of loading and shall be taken from
national regulations. 36
3 Updated: May-19
Characteristic resistance in case of seismic performance category C1
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
HIT-V 8.8, AM 8.8 - 14,7 29,0 42,8 67,8 93,1 113,8 135,8
Tension NRk,seis [kN]
HIT-Z a); HIT-Z-R 17,9 26,1 35,3 53,4 73,9 - - -
HIT-V 8.8, AM 8.8 - 23,0 34,0 63,0 98,0 141,0 184,0 224,0
HIT-Z a) - - -
Shear VRk,seis [kN] 7,0 17,0 16,0 28,0 45,0
HIT-Z-R 8,0 19,0 22,0 31,0 48,0 - - -
a) Hilti anchor rod HIT-Z-F: M16 and M20

Design resistance in case of seismic performance category C1


Anchor size M8 M10 M12 M16 M20 M24 M27 M30
HIT-V 8.8, AM 8.8 - 9,8 19,4 28,5 45,2 62,1 75,8 90,5
Tension NRd,seis [kN]
a)
HIT-Z ; HIT-Z-R 11,9 17,4 23,5 35,6 49,3 - - -
HIT-V 8.8, AM 8.8 - 18,4 27,2 50,4 78,4 112,8 147,2 179,2
HIT-Z a) - - -
Shear VRd,seis [kN] 5,6 13,6 12,8 22,4 36,0
HIT-Z-R 6,4 15,2 17,6 24,8 38,4 - - -
a) Hilti anchor rod HIT-Z-F: M16 and M20

Materials

Materials properties for HIT-V


Anchor size M8 M10 M12 M16 M20 M24 M27 M30
HIT-V 5.8 (F) 500 500 500 500 500 500 500 500
HIT-V 8.8 (F)
Nominal tensile 800 800 800 800 800 800 800 800
AM 8.8 (HDG) [N/mm²]
strength fuk
HIT-V-R 700 700 700 700 700 700 500 500
HIT-V-HCR 800 800 800 800 800 700 700 700
HIT-V 5.8 (F) 400 400 400 400 400 400 400 400
HIT-V 8.8 (F)
640 640 640 640 640 640 640 640
Yield strength fyk AM 8.8 (HDG) [N/mm²]
HIT-V-R 450 450 450 450 450 450 210 210
HIT-V-HCR 640 640 640 640 640 400 400 400
Stressed cross-
HIT-V [mm²] 36,6 58,0 84,3 157 245 353 459 561
section As
Moment of
HIT-V [mm³] 31,2 62,3 109 277 541 935 1387 1874
resistance W

Mechanical properties for HIS-N


Anchor size M8 M10 M12 M16 M20
HIS-N 490 490 460 460 460
Nominal tensile Screw 8.8 800 800 800 800 800
[N/mm²]
strength fuk HIS-RN 700 700 700 700 700
Screw A4-70 700 700 700 700 700
HIS-N 410 410 375 375 375
Screw 8.8 640 640 640 640 640
Yield strength fyk [N/mm²]
HIS-RN 350 350 350 350 350
Screw A4-70 450 450 450 450 450
Stressed cross- HIS-(R)N 51,5 108,0 169,1 256,1 237,6
[mm²]
section As Screw 36,6 58 84,3 157 245
Moment of HIS-(R)N 145 430 840 1595 1543
[mm³]
resistance W Screw 31,2 62,3 109 277 541

37
5 Updated: May-19
Mechanical properties for HIT-Z
Anchor size M8 M10 M12 M16 M20
Nominal tensile HIT-Z(-F) a) 650 650 650 610 595
[N/mm²]
strength fuk HIT-Z-R 650 650 650 610 595
HIT-Z(-F) a) 520 520 520 490 480
Yield strength fyk [N/mm²]
HIT-Z-R 520 520 520 490 480
Stressed cross-
HIT-Z(-F) a)
section of thread [mm²] 36,6 58,0 84,3 157 245
HIT-Z-R
As
Moment of HIT-Z(-F) a)
[mm³] 31,9 62,5 109,7 278 542
resistance W HIT-Z-R
a) Hilti anchor rod HIT-Z-F: M16 and M20

Material quality for HIT-V


Part Material
Zinc coated steel
Threaded rod, Strength class 5.8; Elongation at fracture A5 > 8% ductile
HIT-V 5.8 (F) Electroplated zinc coated  5m; (F) hot dip galvanized ≥ 45 m
Threaded rod, Strength class 8.8; Elongation at fracture A5 > 12% ductile
HIT-V 8.8 (F) Electroplated zinc coated  5m; (F) hot dip galvanized ≥ 45 m
Strength class 8.8; Elongation at fracture A5 > 12% ductile
Hilti Meter rod,
Electroplated zinc coated  5m
AM 8.8 (HDG)
(HDG) hot dip galvanized ≥ 45 m
Washer Electroplated zinc coated ≥ 5 m, hot dip galvanized ≥ 45 m
Strength class of nut adapted to strength class of threaded rod.
Nut
Electroplated zinc coated  5m, hot dip galvanized ≥ 45 m
Filling washer: Electroplated zinc coated ≥ 5 µm / (F) Hot dip galvanized ≥ 45 µm
Hilti Filling set (F) Spherical washer: Electroplated zinc coated ≥ 5 µm / (F) Hot dip galvanized ≥ 45 µm
Lock nut: Electroplated zinc coated ≥ 5 µm / (F) Hot dip galvanized ≥ 45 µm
Stainless Steel
Strength class 70 for ≤ M24 and strength class 50 for > M24;
Threaded rod,
Elongation at fracture A5 > 8% ductile
HIT-V-R
Stainless steel 1.4401; 1.4404; 1.4578; 1.4571; 1.4439; 1.4362
Washer Stainless steel 1.4401, 1.4404, 1.4578, 1.4571, 1.4439, 1.4362 EN 10088-1:2014
Nut Stainless steel 1.4401, 1.4404, 1.4578, 1.4571, 1.4439, 1.4362 EN 10088-1:2014
High corrosion resistant steel
Strength class 80 for ≤ M20 and class 70 for > M20,
Threaded rod,
Elongation at fracture A5 > 8% ductile
HIT-V-HCR
High corrosion resistance steel 1.4529; 1.4565;
Washer High corrosion resistant steel 1.4529, 1.4565 EN 10088-1:2014
Nut High corrosion resistant steel 1.4529, 1.4565 EN 10088-1:2014

Material quality for HIS-N


Part Material
Int. threaded
Electroplated zinc coated ≥ 5 µm
HIS-N sleeve
Screw 8.8 Strength class 8.8, A5 > 8 % Ductile; Steel galvanized ≥ 5 µm
Int. threaded
Stainless steel 1.4401,1.4571
sleeve
HIS-RN
Strength class 70, A5 > 8 % Ductile; Stainless steel 1.4401; 1.4404, 1.4578; 1.4571;
Screw 70
1.4439; 1.4362

38
Updated: May-19 6
Setting details for HIT-V
Anchor size M8 M10 M12 M16 M20 M24 M27 M30

Nominal diameter of drill bit d [mm] 10 12 14 18 22 28 30 35


Eff. embedment depth and hef,min [mm] 60 60 70 80 90 96 108 120
drill hole depth a) hef,max [mm] 160 200 240 320 400 480 540 600
Minimum base material
hmin [mm] hef + 30 mm ≥100 mm hef + 2 d0
thickness
Maximum diameter of
clearance hole in the df [mm] 9 12 14 18 22 26 30 33
fixture
Thickness of
hfs [mm] - - - 11 13 15 - -
Hilti filling set
Effective fixture thickness
tfix,eff [mm] tfix,eff - hfs
with Hilti filling set
Max. torque moment b) Tmax [Nm] 10 20 40 80 150 200 270 300
Minimum spacing smin [mm] 40 50 60 75 90 115 120 140

Minimum edge distance cmin [mm] 40 45 45 50 55 60 75 80

Critical spacing
scr,sp [mm] 2 ccr,sp
for splitting failure
1,0  hef for h / hef ≥ 2,00
Critical edge distance for
ccr,sp [mm] 4,6 hef – 1,8 h for 2,00 > h / hef > 1,3
splitting failure c)
2,26 hef for h / hef ≤ 1,3
Critical spacing for concrete
scr,N [mm] 2 Ccr,sp
cone failure
Critical edge distance for
ccr,N [mm] 1,5 hef
concrete cone failure d)
For spacing (edge distance) smaller than critical spacing (critical edge distance) the design loads have to be reduced.
a) hef,min ≤ hef ≤ hef,max (hef: embedment depth)
b) Maximum recommended torque moment to avoid splitting failure during instalation with minimum
spacing and edge distance
c) h: base material thickness (h ≥ hmin)
d) The critical edge distance for concrete cone failure depends on the embedment depth hef and the
design bond resistance. The simplified formula given in this table is on the save side.

39
Updated: May-19 8
Setting details for HIS-N
Anchor size M8 M10 M12 M16 M20
Nominal diameter of drill bit d0 [mm] 14 18 22 28 32
Diameter of element d [mm] 12,5 16,5 20,5 25,4 27,6
Effective anchorage and drill
hef [mm] 90 110 125 170 205
hole depth
Minimum base material
hmin [mm] 120 150 170 230 270
thickness
Diameter of clearance hole
df [mm] 9 12 14 18 22
in the fixture
Thread engagement
hs [mm] 8-20 10-25 12-30 16-40 20-50
length; min - max
Minimum spacing smin [mm] 60 75 90 115 130
Minimum edge distance cmin [mm] 40 45 55 65 90
Critical spacing for splitting
scr,sp [mm] 2 ccr,sp
failure
1,0  hef for h / hef ≥ 2,0

Critical edge distance for


ccr,sp [mm] 4,6 hef – 1,8 h for 2,0 > h / hef > 1,3
splitting failure b)

2,26 hef for h / hef ≤ 1,3


Critical spacing for
scr,N [mm] 2 ccr,N
concrete cone failure
Critical edge distance for
ccr,N [mm] 1,5 hef
concrete cone failure c)
Max. torque moment a) Tmax [Nm] 10 20 40 80 150
For spacing (edge distance) smaller than critical spacing (critical edge distance) the design loads have to be reduced.
a) Max. recommended torque moment to avoid splitting failure during Instalation with minimum spacing and
edge distance
b) h: base material thickness (h ≥ hmin)
c) The critical edge distance for concrete cone failure depends on the embedment depth h ef and the design
bond resistance. The simplified formula given in this table is on the save side.

40
9 Updated: May-19
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

5. GUIDERAIL VERIFICATION CALCUALITON

41
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

Guide Rail Type

The guiderail type and dimension are verified as per manufacture calculation based on
capacity, speed, car dead weight, rope weight, travel and gravity force. Which we provided
the guiderail force details in the GAD.

Type of Guiderail selected for this project as per following

Lift Number Car Rail CW Rail


PL01~PL03 T-114/B T-753/B
PL04~PL05 T-114/B T-753/B
PL06~PL08 T-114/B T-753/B
PL09 T-114/B T-753/B
PL10~PL11 T-114/B T-753/B
PL12 T-114/B T-753/B
SL1 & SL2 T-114/B T-753/B
SL3 & SL4 T-114/B T-753/B
SL5 & SL6 T-114/B T-753/B

The guide rail loads that were given by the manufacturer are input on each of
The beams supporting the guide rail. These loads were input in two sets, case 1 and
Case 2, corresponding to each side of the cabin

Load case 1: cabin ecc. Left” loads due to the eccentricity and emergency break of the cabin.
Load case 2: cabin ecc. Right” loads due to the eccentricity and emergency break of the
cabin.

42
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

Guiderail size and properties details:

Guiderail Section Verification:

Guide Rail Type T – 114 / B – Section area 2089 mm2

Guide Rail Type T – 75 3/ B – Section area 1099 mm2

Maximum Load applied → P10 – 62 kN

Stress calculation

Type T – 114 / B V = Load / Area = 62 x 1000 (N) / 2089 mm2 = 29,68 N mm2 < 275 N
mm2 safe

Type T – 75 3 / B V = Load / Area = 62 x 1000 (N) / 1099 mm2 = 56,41 N mm2 < 275 N
mm2 safe
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

6. GUIDERAIL BRACKET CONNECTION WITH


CONCRETE DESIGN

7. GUIDERAIL BRACKET CONNECTION WITH


STEEL BEAM DESIGN

44
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

Guide rail bracket connection with Concrete


Guide rail bracket and counterweight bracket are connection with wall by using Hilti M16
bolt. Refer part 4 Anchor bolt calculation

Guide rail bracket connection with steel beam

Bracket Length 150 ~ 250mm and Bracket thickness 6mm

Bracket welded with Steel beam


Please refer Welded verification at page no 27

45
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

The guide rail loads that were given by the manufacturer are input as per following table

Lift Number Steel beam Length Steel Beam size & Type Steel Beam Grade

PL01~PL03 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL04~PL05 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL06~PL08 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL09 Single Shaft RCC Single Shaft RCC Single Shaft RCC

PL10~PL11 2.1 – 0.03 = 2.07 H beam 200 x 200 x 7 x 10 Grade S275

PL12 Single Shaft RCC Single Shaft RCC Single Shaft RCC

SL1 & SL3 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275

SL2 & SL4 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275

SL5 & SL6 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275

Guide rail load FX acting staad calculation

46
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

8. MACHINE BED & BASE PLATE LOAD


DETAILS

47
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

Machine bed load & base plate details

SL1~SL4 Lifts machine bed load acting points. The base plate size are mentioned in the GAD,
which is designed based following force loads.

Machine Bed Directly fixing on wall with cutout

Kindly Refer page 50~51


for Machine bed details
Installation details for Machine Bed

Figure 1-2 Sketch map of installation the T/M in Top Floor of the Well
For installing the traction machine, the height of scaffold on the top floor can be adjusted on the actual
needs to provide enough space to install the traction machine, Shaft Top Beam of traction machine and
Governor Assy. The Traction machine, Shaft Top Beam of traction machine and Governor Assy. should
be suspended at the entrance of landing door on the top floor, so the scaffold should answer for the void
requirements of suspending. The safety requirements of scaffold can refer to the R000000241
<EC001-TS Preparation for Elevator Installation>.
1.5 Installation steps of traction machines
1.5.1 Install overspeed governor beam
a) Install I-shape steel bars in the well:

I-shape steel bars

Figure1-3 Installation of I-shape Steel Bars

49
Tractor beam

Washer

Gusset plate

Bolt assembly

Figure 1-7 Installation of Traction machine Beam, Gusset Plate, Washer and Bolt Assembly
Connecting line of the CWT Connecting line of the Central line of the
guide railCWT guide rail car guide rail CWT pulley

Tractor beam

Gusset plate

Central line
of the car

Figure 1-8 Position of Traction machine Beam


If the depth of the well is overlarge (e.g. 100mm), it is allowed to take advantages of the gusset plate and
washer at the time of installing traction machine beam so that the gusset plate and washer can stretch
out of the traction machine beam and the integral component can stay on the embedded steel plate of
the load bearing wall solidly. See Figure 1-9.

50
Tractor beam

Gusset plate

Washer

Bolt assembly

Figure 1-9 Installation of Gusset Plate and Washer


b) Install the hanging beam of PMS215 master installation tool on the traction machine beam. See
Figure 1-10 and Figure 1-11.

Tractor beam

Hanging beam

Figure 1-10 Installation of Hanging Beam

Hanging beam

Tractor beam

Figure 1-11 Relative Position of Hanging Beam and Traction machine Beam
c) Fit the traction machine and the basket of the master installation tool outside the well on the top floor.
See Figure 1-12 (a/b/c/d).

51
Machine Bed Support Rubber PAD details
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

9. HOISTING HOOK DETAILS

52
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

Hoisting Hook

Hoisting hook load KN details are indicated in the GAD, Main contractor to provide Hook
with TKE given load and location as per GAD. The construction unit guarantees the intension
and function of hook, obey the local regulation.

The design of Hook to calculate the shear value capacity with considered factor of safety 1.6

Calculation for fixed mils steel:

Considered hot rolled mild steel bars - Fy = 250N/mm2

Hence shear capacity = 0.6 x 250 = 150N/mm2

Considered factory of safety 1.6 / Therefore F1 = 3 T (3 ton) x 1.6 = 5.0 T or 50000 N

Hence sectional surface area of steel required : 50000/150 = 333.33 mm2

Considering diameter 25mm

Sectional area of steel = H x (25 x 25) / 4 = 490.625 mm2 > 466.67mm2 - Ok 53


54
55
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

10. REFERANCE DRAWINGS

56
Main Parameters SL01 & SL02 KEY PLAN :

AA
AB AC AD
AA

7500 8000 7500

Elevator Type SL01: SERVICE/FIRE LIFT


Escape ladder from Car top SL02: SERVICE LIFT
ZONE 06

Weather proof Shaft lighting, by tkea Escape ladder from Car top Weather proof Shaft lighting, 52
°

10 m
BUILD
ING
SETB
ACK

cable, GI Trunking & fixing by cable, GI Trunking & fixing by Rated Load(kg) 2000 (26 PERSON) DA

by tkeq

50
Rescue ladder inside ca
DB

55
tkeq (SMDB-04-L11-LIFT-01) tkeq (ESMDB-04-L10-01)

00
Rated Speed(m/s) 1.60

A
DC

75
-
by tkeq

00
DD

54
?

(Material & rating to be

00
(Material & rating to be
DE D09

73
285 1125 1190 1190 1125 285
56 D08
00

CWT Location AT SIDE LIFT


90
00 D07

38°
submitted separately) submitted separately)
STAIRWAY
ST-19
90
00 D06

A30 90
00

Control Style
A16

DUPLEX

9000
FIRE LOBBY 90
00 D04

Inverter CTR A29


90
00 D03

9000
CORE 4

Floor/Stop/Door 15/15/15 A28

ZONE 05
90
00 D02

56
00 D01

9000
A27

300
B06

9000
400 400 Door Opening Type 4 PANEL CENTRAL OPENING A26
9500 B05

8650 B04

8650 B03

9000
B02
6365

(2 HOURS FIRE RATED DOORS)


B01
3235
A25 CORE 3 VOID

ZONE 01
AD

7500
Door Opening(DW×DH) (mm) 1400 x 2300

120
SERVICE LIFT
LOBBY
AC
ACK
ING SETB
10 m BUILD

8000
DROP ROOM
A24
? FIRE PUMP 5°


ROOF AREA
SHAFT 12 AB

35°
ARD
RESERVATIONS SATELLITE
FFL +6.00
A23 CF DISHES AREA

7500
ARD Car Dimension(CW×CD×CH) (mm) 1500 x 2700 x 2950
ADMIN FFL +6.00

9000
C02 AA


OFFICES

ACK
LUGGAGE
XRAY
LUGGAGE C02 AHU

SETB
CART SHAFT
CE C02

ING
A22

ILD
10600

BU
BD

7200
Suspension Ratio
FIRE PUMP SHAFT MEP PLANT ROOM

5m
Intermediate fire 2:1 CD C02
BC

SL02
4900

K
SETBAC

8550
A21

SL01

CC 145°

Inverter CTR
CORE 1

5700

DING
A20 BB
CB

wall by main contractor

3m BUIL
Traction Machine Type DAF 270 SERIES

9550
7350

CAR GAUGE=1706
CA CORE 2

°
BA

90
K
G SETBAC
5m BUILDIN

A19
)

No. of Ropes Ø10 x 8 ZONE 02 ZONE 04


2
6000
9000
9000

A18 C11 3°
C10
C09
9000
9000
9000
ZONE 03
6° C08 9000
A17

Car Guide Rail


9000

T114/B
C07
C06 9000
C05 9000
C04
6° C03
A16
62

C02
C01 6000
3° 6000
6000 A01
A15
9000 A02

CWT Guide Rail T75/B


1620
A14 A03
9000 A04
9000 A05

6° 9° A06

1500
A13
6° 6° 3° A07

468 89 Trap door 89 248 248 89 Trap door 89 468 Power AC 3-415V-50Hz
A12
A11
A10 A09 A08

Counter weight sub 500×400 500×700


Light AC 1-240V-50Hz
filler CAST IRON
Counter weight sub Motor capacity 23.3 kW Note:
CW GUAGE=1320

MS Steel Car Top filler CAST IRON 1. Structural calculation shall be resubmitted
CAR GAUGE=1706 Power Starting current (A) 89
Barricade 700mm height
separately

CAR DEPTH=2700
Supply Nominal current (A)
Ø450

50

SHAFT DEPTH=3150
890 800
Power Capacity(kVA) 43 2. Shaft Lighting submittal shall be submitted
225

H.COP H.COP
Light Capacity(kVA) [2+(OH+TH+PD-1)xLP/700 ① separately
3. Portable ladder one set at all floors in Lobby by

200
Heat Dissipation(kJ/h/lift) 11705
220 220 main contractor for firefighter reaching to car top,
Ø450 Ø450 Ø450 Ø450 Force (kN)
in case of emergency
P1 P2 P3 P4 P5 P6 P7 P8' P9 P10 Fx Fy
4. Interface drawings for Intercom, CCTV, BMS,
62

890 890 100 85 36 37 - 58 80 120182 62 2.2 2.8 Monitoring system, Fire alarm system will be

1200
MS Steel Car Top Force when safety gear operation submitted separately in coordination with main
Note: ①The result of formula

1530
Barricade 700mm height should be rounded up to integer. P10 contractor
The units of OH, TH and PD are Fx
MAIN 2nd MAIN 2nd meter, and the unit of LP is watt. Fy Fx
COP COP COP COP
SL02 SL01 For General requirement notes, please refer drawing sheet number - 006
Sill Sill
Doors Doors
REFERENCE CONTRACT DRAWINGS

115 185
A02

DRAWING NUMBER REV DRAWING TITLE

30
PAL-WAT-Z3-XX-M2-ARC- 4200 C00 CORE 1 ENLARGED PLANS

300
Filling required Filling required PAL-WAT-Z3-XX-M2-ARC- 4201 C00 CORE 1 ENLARGED PLANS
by Main contractor by Main contractor
Narrow Jamb Narrow Jamb

150 400 90 DOOR WIDTH=1400 DOOR WIDTH=1400 90 400 150

550 STRUCTURE OPENING 1630 70 350 350 70 STRUCTURE OPENING 1630 550
REFERENCE SHOP DRAWINGS
CAR WIDTH=1500 CAR WIDTH=1500
DRAWING NUMBER REV DRAWING TITLE
SHAFT WIDTH=2600 200 SHAFT WIDTH=2600 PAL-WAT-Z0-10-M2-ARC-1010~1125 C02 IFC PLANS
300 TOTAL SHAFT WIDTH=5400 300
Infilled with concrete or Cutout for Control panel
Cutout for Control panel
(Cutout to be closed after the control
(fire-proofing) decorate
by main contractor
SHAFT PLAN (Cutout to be closed after the control
panel installation by main contractor) panel installation by main contractor)
(At 12th. floor)

AA
Escape ladder from Car top
by tkea Escape ladder from Car top Certified for co-ordination with contract documents
Weather proof Shaft lighting, by tkeq Weather proof Shaft lighting,
cable, GI Trunking & fixing by Rescue ladder inside car DEPARTMENT COMPANY SIGNATURE DATE
A
-

cable, GI Trunking & fixing by


tkeq (SMDB-04-L11-LIFT-01) tkeq (ESMDB-04-L10-01)
285 1125 1190 1190 1125 285 10.11.2019
(Material & rating to be (Material & rating to be ARCHITECTURAL QATAR

submitted separately) submitted separately)


STRUCTURAL QATAR
26.10.2019
MECHANICAL 26.10.2019

300
400 400

ELECTRICAL 26.10.2019

120
DRAWING STATUS
Intermediate fire
02 ISSUED FOR APPROVAL 27.11.2019 KS M.M. M.M. A.K.
wall by main contractor
CAR GAUGE=1706
01 ISSUED FOR APPROVAL 10.11.2019 KS M.M. M.M. A.K.
00 ISSUED FOR APPROVAL 26.10.2019 KS M.M. M.M. A.K.
62

REV. DESCRIPTION DATE DWN CHKD APPD APPD

1620
1500
468 89 Trap door 89 248 248 89 Trap door 89 468
500×400 500×700 PROJECT
Counter weight sub
filler CAST IRON ALAR PROJECT DEVELOPMENT
Counter weight sub
CW GUAGE=1320

CAR GAUGE=1706
MS Steel Car Top filler CAST IRON CLIENT
Barricade 700mm height
AL JASRAH REAL ESTATE DEVELOPMENT WLL,
CAR DEPTH=2700
Ø450

SHAFT DEPTH=3150
890 800
QNB CAPITAL LCC
225

H.COP H.COP
200

PROJECT MANAGER
220 220
Ø450 Ø450 Ø450 Ø450

3rd Floor, Salam Tower, Corniche Road, West Bay,


62

890 890 PO Box 207288, Doha, State of Qatar


1200

tel: +974 4436 7288

MS Steel Car Top LEAD DESIGNER | ARCHITECT | LANDSCAPE ARCHITECT ENGINEER:- STRUCTURE | MECHANICAL | ELECTRICAL |
1530

Barricade 700mm height


CAD FILENAME:-PAL-MAN-Z4-ALL-SDW-TC-LF-0005 SHT 001-004 REV 00 (CORE 1).DWG

PUBLIC HEALTH | FIRE & LIFE SAFETY

MAIN 2nd MAIN 2nd


COP COP COP COP
SL02 SL01 london | 44 0 20 7906 6600 watg.com http://www.wsp.com
Doors Sill Doors Sill
115 185

ARCHITECT OF RECORD & CONSTRUCTION SUPERVISION


A02

30

Buildings & Infrastructure


P.O. Box 55781, Doha, State of Qatar
Tel.: +(974) 4466 4203 Fax.: +(974) 4466 7843
Email: infoqatar@shakeregypt.com
www.shakergroup.com
300

Filling required Filling required


by Main contractor by Main contractor
Narrow Jamb Narrow Jamb MAIN CONTRACTOR SUB CONTRACTOR
Al Emadi Building, 250 D Ring Road
90 DOOR WIDTH=1400 70 70 DOOR WIDTH=1400 90 Tel : +974 4553366 Fax : +974 4553377
P.O. Box : 22373 Doha - Qatar
E - mail : manqat@manqat.com

550 STRUCTURE OPENING 1700 350 350 STRUCTURE OPENING 1700 550 QATAR

CAR WIDTH=1500 CAR WIDTH=1500 DRAWING TITLE

SHAFT WIDTH=2600 200 SHAFT WIDTH=2600


SHAFT PLAN FOR SL01 & SL02 LIFTS
300 TOTAL SHAFT WIDTH=5400 300

Infilled with concrete or


THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
(fire-proofing) decorate
by main contractor
SHAFT PLAN DRAWING NUMBER: SCALE 1:20 ORIG. DWG SIZE: A1 REV.
(At B, P, G, 1 ~ 11th. floors) PAL-MAN-Z4-ALL-SDW-TC-LF-0005 Sht. 001 Con't. on 002 02
KEY PLAN : AA AB AC AD

7500 8000 7500

ZONE 06

ACK
° SETB
52 ING
BUILD
10 m

Weather proof Shaft lighting, Weather proof Shaft lighting,


DA

50
DB

55
cable, GI Trunking & fixing by

00
cable, GI Trunking & fixing by
DC

75
00
DD

54
tkeq (SMDB-04-L11-LIFT-01) ?

00
DE

tkeq (ESMDB-04-L10-01)
D09

73
56 D08
00

(Material & rating to be Intermediate fire wall


LIFT
90
00 D07

38°
STAIRWAY

(Material & rating to be


ST-19
90
00 D06

submitted separately) by main contractor submitted separately)


A30 90
00 A16

9000
FIRE LOBBY 90
00 D04
A29
90
00 D03

9000
285 1125 1190 1190 1125 285
CORE 4

AA
90
00 D02
A28
56
ZONE 05 00 D01

9000
A27

B06

9000
9500 B05
A26 8650 B04

8650 B03

9000
B02
6365 B01
3235
A25 CORE 3 VOID

ZONE 01
AD

7500
SERVICE LIFT
LOBBY

300
AC
ACK
ING SETB
10 m BUILD

8000
DROP ROOM
A24
? FIRE PUMP 5°


ROOF AREA
SHAFT 12 AB

180

180

180

180

35°
RESERVATIONS SATELLITE
FFL +6.00
A23 CF DISHES AREA

7500
ADMIN FFL +6.00

9000
C02 AA


OFFICES

ACK
LUGGAGE
XRAY
LUGGAGE C02 AHU

SETB
CART SHAFT
CE C02

ING
A22

ILD
10600

BU
BD

7200
FIRE PUMP SHAFT MEP PLANT ROOM

5m
CD C02
BC

SL02
4900

K
SETBAC

8550
A21

SL01

CC CORE 1 145°

5700

DING
A20 BB
CB

3m BUIL

9550
7350

CA CORE 2

°
BA

90
K
G SETBAC
5m BUILDIN

A19
)

P1 ZONE 02 ZONE 04


2
6000
9000
9000

A18 C11 3°
C10
C09
9000
9000
9000
ZONE 03
6° C08 9000
A17 9000
C07
C06 9000
C05 9000
C04
6° C03
A16
C02
C01 6000
3° 6000
6000 A01
A15
9000 A02
9° A03
A14
9000 A04
9000

220 220
6° A05

6° 9° A06
A13
6° 6° 3° A07
A12
A11 A09 A08
A10

1620
hook per lift by tkeq
hook per lift by tkeq
Note:

5 Nos. of hoisting
5 Nos. of hoisting
1. Structural calculation shall be resubmitted
separately
2. Shaft Lighting submittal shall be submitted

SHAFT DEPTH=3150
30kN 30kN separately

450

450
30kN 30kN
3. Portable ladder one set at all floors in Lobby by

200

200

200
main contractor for firefighter reaching to car top, in
35kN 35kN case of emergency
Machine bed Governor & Hitching 4. Interface drawings for Intercom, CCTV, BMS,
support bed
Monitoring system, Fire alarm system will be

850
submitted separately in coordination with main
Machine SL02 contractor
SL01
120

1530
Ø25mm Mild steel HDG.
Design calculation to be
submitted by tkeq based on 30kN
30kN
100
loads 30 KN
-
REFERENCE CONTRACT DRAWINGS
DRAWING NUMBER REV DRAWING TITLE

B
PAL-WAT-Z3-XX-M2-ARC- 4200 C00 CORE 1 ENLARGED PLANS
HOOK DETAIL 55 900 600 205 205 600 900 55

A02

150

150
tkeq will coordinate with main contractor for 10kN 10kN PAL-WAT-Z3-XX-M2-ARC- 4201 C00 CORE 1 ENLARGED PLANS
hook fixing during slab casting

180

180

180

180
P2 P4 P4 P2

300
905 685 685 905 REFERENCE SHOP DRAWINGS
SHAFT WIDTH=2600 200 SHAFT WIDTH=2600 DRAWING NUMBER REV DRAWING TITLE
PAL-WAT-Z0-10-M2-ARC-1010~1125 C02 IFC PLANS
300 TOTAL SHAFT WIDTH=5400 300
Opening to be made close after Opening to be made close after
installation by main contractor installation by main contractor Weather proof Shaft lighting,
cable, GI Trunking & fixing
OVERHEAD PLAN

AA
by tkeq (ESMDB-04-L10-01)
Weather proof Shaft lighting, (Material & rating to be
cable, GI Trunking & fixing by submitted separately)
tkeq (SMDB-04-L11-LIFT-01) 285 1125 1190 1190 1125 285
Certified for co-ordination with contract documents
(Material & rating to be
submitted separately) DEPARTMENT COMPANY SIGNATURE DATE
ARCHITECTURAL QATAR
10.11.2019

300
400 400
STRUCTURAL QATAR
26.10.2019
Hook by tkeq Hook by tkeq MECHANICAL 26.10.2019
ELECTRICAL 26.10.2019

500
55 900 840 600 610 600 840 900 55
HOOK
500(w)x500(d)x500(h)
DRAWING STATUS
Fire lift Sump pit by 500 02 ISSUED FOR APPROVAL 27.11.2019 KS M.M. M.M. A.K.
main contractor CWT guard
CWT guard 01 ISSUED FOR APPROVAL 10.11.2019 KS M.M. M.M. A.K.
screen by
P6 P6

1620
screen by tkeq
tkeq 00 ISSUED FOR APPROVAL 26.10.2019 KS M.M. M.M. A.K.
REV. DESCRIPTION DATE DWN CHKD APPD APPD
700

1-16x180x875 1-16x180x875 Intermediate fire PROJECT


Steel plate by tkeq Steel plate by tkeq P9 wall by main contractor P9 ALAR PROJECT DEVELOPMENT
300 300 300 300

SHAFT DEPTH=3150
CLIENT
P8' P8' P8' P8'

225
1-16x180x575 1-16x180x575 AL JASRAH REAL ESTATE DEVELOPMENT WLL,
Steel plate by tkeq Steel plate by tkeq
Weather proof Power socket and shaft light Weather proof Power socket and shaft light
P7 P7 P7 P7 QNB CAPITAL LCC
13A two way switch (ESMDB-04-L10-01) 13A two way switch (SMDB-04-L11-LIFT-01)
by main contractor by main contractor PROJECT MANAGER
HEADROOM HEIGHT=5000

P6 P6
Weather proof Lift Weather proof Lift 1000 1000
Stop button by tkeq Stop button by tkeq
3rd Floor, Salam Tower, Corniche Road, West Bay,
SAFETY AREA SAFETY AREA PO Box 207288, Doha, State of Qatar
4300

1530
tel: +974 4436 7288
Pit ladder (MS material) Pit ladder (MS material)
by tkeq LEAD DESIGNER | ARCHITECT | LANDSCAPE ARCHITECT ENGINEER:- STRUCTURE | MECHANICAL | ELECTRICAL |

700

700
by tkeq
CAD FILENAME:-PAL-MAN-Z4-ALL-SDW-TC-LF-0005 SHT 001-004 REV 00 (CORE 1).DWG

H:500 H:500 PUBLIC HEALTH | FIRE & LIFE SAFETY


Weather proof Stop switch tkeq Weather proof Stop switch tkeq
300

300
Intermediate fire Weather proof Shaft lighting 13 A two way switch SL02 SL01 Weather proof Shaft lighting 13 A two way
wall by main contractor (SMDB-04-L11-LIFT-01) by Main Contractor switch (ESMDB-04-L10-01) by Main Contractor
A02

250

250
SL01 SL02 Pit Inspection box london | 44 0 20 7906 6600 watg.com http://www.wsp.com
Pit Inspection box by tkeq
by tkeq
ARCHITECT OF RECORD & CONSTRUCTION SUPERVISION
+50.00 FFL +50.00 FFL Buildings & Infrastructure

300
12th.FL 12th.FL P.O. Box 55781, Doha, State of Qatar
Tel.: +(974) 4466 4203 Fax.: +(974) 4466 7843
Email: infoqatar@shakeregypt.com
1410 1190 1190 1410 www.shakergroup.com

SHAFT WIDTH=2600 200 SHAFT WIDTH=2600 SHAFT WIDTH=2600 200 SHAFT WIDTH=2600 MAIN CONTRACTOR SUB CONTRACTOR
TOTAL SHAFT WIDTH=5400 300 TOTAL SHAFT WIDTH=5400 300 Al Emadi Building, 250 D Ring Road
Tel : +974 4553366 Fax : +974 4553377
P.O. Box : 22373 Doha - Qatar

SECTION - B PIT PLAN QATAR


E - mail : manqat@manqat.com

DRAWING TITLE

PIT PLAN & OVERHEAD PLAN


FOR SL01 & SL02 LIFTS
THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
DRAWING NUMBER: SCALE 1:20 ORIG. DWG SIZE: A1 REV.

PAL-MAN-Z4-ALL-SDW-TC-LF-0005 Sht. 002 Con't. on 003 02


KEY PLAN : AA AB AC AD

7500 8000 7500

ZONE 06

ACK
° SETB
52 ING
BUILD
10 m

MATCH LINE X-X MATCH LINE Y-Y DA

50
DB

55
Weather proof Shaft lighting 13 A two

00
DC

75
00
DD

54
?

way switch(ESMDB-04-L10-01 for

2500

00
DE D09

73
3700

3700
56 D08
00

LIFT
90
00

3700

3700
D07

Weather proof Shaft lighting,

38°
STAIRWAY

SL01 Lift & SMDB-04-L11-LIFT-01


ST-19
90

Str. Ht. 2500


00 D06

A30 90
00 A16

Str. Ht. 2500

9000
for SL02 Lift) by Main Contractor cable, GI Trunking & fixing by A29
FIRE LOBBY 90
00 D04

90
00 D03

9000
CORE 4
90

tkeq (ESMDB-04-L10-01 for SL01


00 D02

2500
A28
56
ZONE 05 00 D01

9000
Opening to be made 5 nos. of hoisting A27

Lift & SMDB-04-L11-LIFT-01 for


B06

9000
9
9500 B05

hook per lift by tkeq


A26 8650 B04

8650 B03

close after installation

9000
2
B02
6365

SL02 Lift) (Material & rating to be


B01
3235
A25 CORE 3 VOID

ZONE 01

+55.30 SSL
AD

by main contractor


submitted separately)

7500
SERVICE LIFT
LOBBY
AC
ACK
ING SETB
10 m BUILD

8000
DROP ROOM
A24
? FIRE PUMP 5°


ROOF AREA
SHAFT 12 AB

35°
+38.90 FFL
RESERVATIONS SATELLITE
FFL +6.00

300
A23 CF DISHES AREA

7500
ADMIN FFL +6.00

9000
C02 AA


OFFICES

ACK
LUGGAGE

+13.00 FFL
XRAY
LUGGAGE C02 AHU

SETB
CART SHAFT
CE C02

ING
A22

ILD
10600

BU
BD

7200
FIRE PUMP SHAFT MEP PLANT ROOM

5m
CD

500
C02
BC

SL02
4900

K
SETBAC

8550
A21

SL01

CC 145°

700

50 700
CORE 1

5700
5000

DING
A20 BB
CB

3m BUIL

9550
7350

2500
CA CORE 2

°
BA

90
K
G SETBAC
5m BUILDIN

A19
)

ZONE 02 ZONE 04


2
6000
9000

500
9000

A18 C11 3°
C10
9000
9000 ZONE 03
Cutout details
C09 9000
6° C08 9000
A17 9000
C07

5000
C06 9000
C05 9000
C04
6° C03
A16
C02

refer sheet no. 024


C01 6000
3° 6000

2500
6000 A01
A15
9000 A02

Open
A14 A03
9000 A04
9000 A05

6° 9° A06
A13
6° 6° 3° A07

Overhead Height 5000


A12

emergency
A11 A08

700
A10 A09

3700

3700
exit.

Str. Ht. 2500


Note:

2500
1. Structural calculation shall be resubmitted

4000
4500
8 separately

2500
2. Shaft Lighting submittal shall be submitted

Str. Ht. 2500


separately
+35.20 FFL
7000

7000
3. Portable ladder one set at all floors in Lobby by

2500
main contractor for firefighter reaching to car top, in
12
case of emergency
4. Interface drawings for Intercom, CCTV, BMS,
+50.00 FFL Monitoring system, Fire alarm system will be

2500
submitted separately in coordination with main
Weather proof Shaft lighting,
5000
contractor

3700

3700
Str. Ht. 2500

2500

cable, GI Trunking & fixing

Str. Ht. 2500


by tkeq (ESMDB-04-L10-01
Weather proof Shaft lighting, for SL01 Lift &

5000
1 cable, GI Trunking & fixing

2500
SMDB-04-L11-LIFT-01 for
7 by tkeq (ESMDB-04-L10-01
for SL01 Lift &
SL02 Lift) (Material & rating REFERENCE CONTRACT DRAWINGS

3700
to be submitted separately)
+6.00 FFL SMDB-04-L11-LIFT-01 for

Str. Ht. 2500


DRAWING NUMBER REV DRAWING TITLE

5000
+31.50 FFL

3700
SL02 Lift) (Material & rating

2500
PAL-WAT-Z3-XX-M2-ARC- 4200 C00 CORE 1 ENLARGED PLANS
Weather proof Shaft lighting, to be submitted separately)
cable, GI Trunking & fixing 11 PAL-WAT-Z3-XX-M2-ARC- 4201 C00 CORE 1 ENLARGED PLANS
by tkeq (ESMDB-04-L10-01
2500

for SL01 Lift &


SMDB-04-L11-LIFT-01 for +46.30 FFL
SL02 Lift) (Material & rating

2500
to be submitted separately) REFERENCE SHOP DRAWINGS

3700

3700
DRAWING NUMBER REV DRAWING TITLE

Str. Ht. 2500


PAL-WAT-Z0-10-M2-ARC-1010~1125 C02 IFC PLANS

2500
DETAIL-Y SL01 & SL02 Lifts
6000

6000

6
5000

3700

3700
2500

Str. Ht. 2500


+27.80 FFL

5000
2500
10 Certified for co-ordination with contract documents
Str. Ht. 2500

DEPARTMENT COMPANY SIGNATURE DATE


+42.60 FFL 10.11.2019

5000
ARCHITECTURAL
G QATAR

2500
STRUCTURAL QATAR
26.10.2019
DETAIL-X
3700

3700
+0.00 FFL MECHANICAL 26.10.2019
2500

Str. Ht. 2500

ELECTRICAL 26.10.2019

DRAWING STATUS

2500
5
MATCH LINE Y-Y 02 ISSUED FOR APPROVAL 27.11.2019 KS M.M. M.M. A.K.

+24.10 FFL 01 ISSUED FOR APPROVAL 10.11.2019 KS M.M. M.M. A.K.


00 ISSUED FOR APPROVAL 26.10.2019 KS M.M. M.M. A.K.
3900

3900

REV. DESCRIPTION DATE DWN CHKD APPD APPD


5000
Str. Ht. 2500

Total height 64500


2500

PROJECT
ALAR PROJECT DEVELOPMENT

5000
P
2500
CLIENT
3700

3700

AL JASRAH REAL ESTATE DEVELOPMENT WLL,


Str. Ht. 2500

-3.90 FFL
Travel height 57600

QNB CAPITAL LCC


60 FFL
Pit Stop 4 PROJECT MANAGER
Switch by

60
2500

tkeap
+20.40 FFL Sill
3rd Floor, Salam Tower, Corniche Road, West Bay,
Narrow Top PO Box 207288, Doha, State of Qatar
2500

Jamb
3700

tel: +974 4436 7288


Door
Str. Ht. 2500

header Narrow LEAD DESIGNER | ARCHITECT | LANDSCAPE ARCHITECT ENGINEER:- STRUCTURE | MECHANICAL | ELECTRICAL |
CAD FILENAME:-PAL-MAN-Z4-ALL-SDW-TC-LF-0005 SHT 001-004 REV 00 (CORE 1).DWG

Side Jamb PUBLIC HEALTH | FIRE & LIFE SAFETY


5100

Counter Weight Sub filler Doors


B CAST IRON
1100

4750

DETAIL-Y
3700

3700
2000

DETAIL-X london | 44 0 20 7906 6600 watg.com http://www.wsp.com


450

Str. Ht. 2500

-7.60 FFL Weather proof Shaft lighting 13 ARCHITECT OF RECORD & CONSTRUCTION SUPERVISION
A two way switch Buildings & Infrastructure
5000

(ESMDB-04-L10-01 for SL01 Lift P.O. Box 55781, Doha, State of Qatar
Pit Depth 1900

3
2500

Tel.: +(974) 4466 4203 Fax.: +(974) 4466 7843


& SMDB-04-L11-LIFT-01 for Email: infoqatar@shakeregypt.com
www.shakergroup.com
SL02 Lift) by Main Contractor
Pit inspection
1300

box by tkeq +16.70 FFL MAIN CONTRACTOR SUB CONTRACTOR


Weather proof Shaft lighting,
500

Al Emadi Building, 250 D Ring Road

-9.50 SSL cable, GI Trunking & fixing by


Tel : +974 4553366 Fax : +974 4553377
P.O. Box : 22373 Doha - Qatar
E - mail : manqat@manqat.com

300 tkeq (ESMDB-04-L10-01 for SL01 QATAR


Guide Rails

Lift & SMDB-04-L11-LIFT-01 for


Brackets

250 DRAWING TITLE


Shaft Depth 3150 SL02 Lift) (Material & rating to be
Pit ladder (MS material) submitted separately)
by tkeq MATCH LINE X-X SECTIONAL ELEVATION FOR SL01 & SL02 LIFTS
500(w)x500(d)x500(h) Fire lift
SECTION - A Sump pit by main contractor THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
DRAWING NUMBER: SCALE 1:50 ORIG. DWG SIZE: A1 REV.

PAL-MAN-Z4-ALL-SDW-TC-LF-0005 Sht. 003 Con't. on 004 02


100x100 Hole for Wiring Weather proof 100x100 Hole for Wiring KEY PLAN : AA AB AC AD

by Main Contractor
7500

by Main Contractor
7500 8000

Weather proof 3 phase Isolator ZONE 06

Weather proof 1 phase Isolator 3 phase Isolator (ESMDB-04-L10-01) Weather proof 1 phase
C

-
ACK
° SETB
52 ING

(SMDB-04-L11-LIFT-01)
BUILD

Isolator (ESMDB-04-L10-01)
10 m

(SMDB-04-L11-LIFT-01) by Main contractor DA

50
DB

by Main contractor

55
by Main Contractor by Main Contractor

00
DC

75
00
DD

54
?

00
DE D09

73
False ceiling False ceiling LIFT
56
00
D08

90
00 D07

38°
STAIRWAY
ST-19
90
00 D06

Cutout for LIP 410 Cutout for LIP 410


A30 90
00 A16

9000
FIRE LOBBY 90
00 D04

C
A29

-
90
00 D03

9000
50

50
CORE 4
90
00 D02
A28
56
ZONE 05 00 D01

9000
150

150
A27

120

120
B06

9000
B05

False ceiling False ceiling


9500

Cutout for LIP


A26 B04

20

20
8650

Cutout for LIP 8650 B03

9000
410 410
B02
6365 B01
3235
A25 CORE 3 VOID

ZONE 01
AD

50

50

7500
SERVICE LIFT
LOBBY
AC
ACK
ING SETB
10 m BUILD

8000
150

150
DROP ROOM
A24
? FIRE PUMP 5°


ROOF AREA
SHAFT 12 AB

120

120

35°
RESERVATIONS SATELLITE
FFL +6.00
A23 CF DISHES AREA

7500
ADMIN FFL +6.00

9000
C02 AA


OFFICES

ACK
20

20
LUGGAGE
XRAY
LUGGAGE C02 AHU

SETB
CART SHAFT
CE C02

ING
A22

ILD
10600

BU
BD

7200
FIRE PUMP SHAFT MEP PLANT ROOM

5m
False ceiling Height 2600 at 2nd. ~ 11th. floors

False ceiling Height 2600 at 2nd. ~ 11th. floors


CD C02
BC

SL02
4900

K
SETBAC

8550
A21

SL01

CC CORE 1 145°

5700

DING
A20 BB
CB

3m BUIL

9550
7350

CA CORE 2

°
BA

90
K
G SETBAC

JAMB JAMB
5m BUILDIN

A19
)

ZONE 02 ZONE 04


2
6000
9000
9000
Structure opening Height 2500

Structure opening Height 2500


A18 C11 3°
C10
C09
9000
9000
9000
ZONE 03
6° C08 9000
A17 9000
C07
C06 9000
C05 9000
C04
6° C03
A16
C02
C01 6000
3° 6000
6000 A01
A15
9000 A02

JAMB JAMB
A14 A03
9000 A04
9000 A05

6° 9° A06
A13
6° 6° 3° A07
A12
A11 A08

DOORS DOORS
A10 A09

Structure opening Height 2500

Structure opening Height 2500


False ceiling Height 2600

False ceiling Height 2600


397 105 397
CONTROLLER CONTROLLER
Note:

250
Ø50 Hole (Typical) DOORS DOORS
397 105 397 1. Structural calculation shall be resubmitted
Cutout for LOP

1780

1780
separately
2. Shaft Lighting submittal shall be submitted

250
Ø50 Hole (Typical)
Cutout for LOP separately
Filling required Filling required
by Main contractor by Main contractor
3. Portable ladder one set at all floors in Lobby by

950
main contractor for firefighter reaching to car top, in
SL02 SL01
Filling required Filling required
case of emergency
by Main contractor by Main contractor 4. Interface drawings for Intercom, CCTV, BMS,

950
FFL FFL SL02 SL01
Monitoring system, Fire alarm system will be
submitted separately in coordination with main
90 150 400 90 90 400 150
70 90 contractor

350

350
70
550 DOOR ROUGH=1700 350 350 DOOR ROUGH=1700 550 FFL FFL

SHAFT WIDTH=2600 200 SHAFT WIDTH=2600

TOTAL SHAFT WIDTH=5400 550 DOOR ROUGH=1630 70 350 350 70 DOOR ROUGH=1630 550

SHAFT WIDTH=2600 200 SHAFT WIDTH=2600


REFERENCE CONTRACT DRAWINGS
DRAWING NUMBER REV DRAWING TITLE
TOTAL SHAFT WIDTH=5400
PAL-WAT-Z3-XX-M2-ARC- 4200 C00 CORE 1 ENLARGED PLANS

115
PAL-WAT-Z3-XX-M2-ARC- 4201 C00 CORE 1 ENLARGED PLANS

300
Filling required Filling required
by Main contractor by Main contractor

115
300
90 DOOR WIDTH=1400 70 DOOR WIDTH=1400 Filling required Filling required
70 90 by Main contractor by Main contractor REFERENCE SHOP DRAWINGS
550 STRUCTURE OPENING 1700 350 350 STRUCTURE OPENING 1700 550
DRAWING NUMBER REV DRAWING TITLE
SHAFT WIDTH=2600 200 SHAFT WIDTH=2600 150 400 90 DOOR WIDTH=1400 DOOR WIDTH=1400 90 400 150
PAL-WAT-Z0-10-M2-ARC-1010~1125 C02 IFC PLANS
300 TOTAL SHAFT WIDTH=5400 300 550 STRUCTURE OPENING 1630 70 350 350 70 STRUCTURE OPENING 1630 550
Infilled with concrete or Infilled with concrete or SHAFT WIDTH=2600 200 SHAFT WIDTH=2600
(fire-proofing) decorate ENTRANCE VIEW (fire-proofing) decorate
by main contractor by main contractor 300 TOTAL SHAFT WIDTH=5400 300
(At B, P, 1 ~ 11th. floors)
Infilled with concrete or Infilled with concrete or
C
Cutout for Control panel
(Cutout to be closed after the control (fire-proofing) decorate ENTRANCE VIEW (fire-proofing) decorate
Cutout for Control panel
(Cutout to be closed after the control Certified for co-ordination with contract documents
-

by main contractor by main contractor


panel installation by main contractor) (At 12th. floor) panel installation by main contractor)
DEPARTMENT COMPANY SIGNATURE DATE
ARCHITECTURAL QATAR
10.11.2019
Cutout for LIP 410 Cutout for LIP 410
STRUCTURAL QATAR
26.10.2019
50

50

26.10.2019
150

150

MECHANICAL
120

120
20

20

ELECTRICAL 26.10.2019
120 150 DETAIL-Y 60 FFL
150
90
DRAWING STATUS

60
80 90
410

Ø50 Hole (Typical) 02 ISSUED FOR APPROVAL 27.11.2019 KS M.M. M.M. A.K.
190

Cutout for
Cutout for 01 ISSUED FOR APPROVAL 10.11.2019 KS M.M. M.M. A.K.
fireman switch 20 Sill

20
fireman switch
80

80
00 ISSUED FOR APPROVAL 26.10.2019 KS M.M. M.M. A.K.
Structure opening Height 2500

Structure opening Height 2500

JAMB Landing REV. DESCRIPTION DATE DWN CHKD APPD APPD


JAMB doors
DOORS DOORS PROJECT
150 105 105 150
ALAR PROJECT DEVELOPMENT
Cutout for LOP Cutout for LOP CLIENT
250

90
Structure opening Height 2500

Structure opening Height 2500


Sill
AL JASRAH REAL ESTATE DEVELOPMENT WLL,
1800

Bolts fixing
1750

DETAIL-X Narrow QNB CAPITAL LCC


Door Height 2300

Door Height 2300


90 90 jamb
Filling required Filling required PROJECT MANAGER
by Main contractor by Main contractor
950

SL02 SL01
3rd Floor, Salam Tower, Corniche Road, West Bay,
PO Box 207288, Doha, State of Qatar
tel: +974 4436 7288
FFL FFL
LEAD DESIGNER | ARCHITECT | LANDSCAPE ARCHITECT ENGINEER:- STRUCTURE | MECHANICAL | ELECTRICAL |
DETAIL-Z
CAD FILENAME:-PAL-MAN-Z4-ALL-SDW-TC-LF-0005 SHT 001-004 REV 00 (CORE 1).DWG

PUBLIC HEALTH | FIRE & LIFE SAFETY


90 70 90
70
550 DOOR ROUGH=1700 350 350 DOOR ROUGH=1700 550

SHAFT WIDTH=2600 200 SHAFT WIDTH=2600


london | 44 0 20 7906 6600 watg.com http://www.wsp.com
TOTAL SHAFT WIDTH=5400 FFL 60 60
FFL ARCHITECT OF RECORD & CONSTRUCTION SUPERVISION
60

60

DETAIL-Z Narrow Top Buildings & Infrastructure


P.O. Box 55781, Doha, State of Qatar
Jamb Tel.: +(974) 4466 4203 Fax.: +(974) 4466 7843
Email: infoqatar@shakeregypt.com
Door
115

www.shakergroup.com

header Narrow
DETAIL-X MAIN CONTRACTOR SUB CONTRACTOR
300

Filling required Filling required Side Jamb


by Main contractor by Main contractor Al Emadi Building, 250 D Ring Road

SECTION - C SECTION - C Doors Tel : +974 4553366 Fax : +974 4553377


P.O. Box : 22373 Doha - Qatar
E - mail : manqat@manqat.com

90 DOOR WIDTH=1400 70 70 DOOR WIDTH=1400 90 (At G. floor) (At B, P, 1 ~ 12th. floors) QATAR

DRAWING TITLE
550 STRUCTURE OPENING 1700 350 350 STRUCTURE OPENING 1700 550
DETAIL-Y
SHAFT WIDTH=2600 200 SHAFT WIDTH=2600
ENTRANCE VIEW FOR SL01 & SL02 LIFTS
300 TOTAL SHAFT WIDTH=5400 300

Infilled with concrete or Infilled with concrete or THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
(fire-proofing) decorate ENTRANCE VIEW (fire-proofing) decorate DRAWING NUMBER: SCALE 1:20 ORIG. DWG SIZE: A1 REV.
by main contractor by main contractor
(At G. floor) PAL-MAN-Z4-ALL-SDW-TC-LF-0005 Sht. 004 Con't. on END 02
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020

11. CONCLUSION

Conclusion:

1) As a result of our analysis the member are found safe as per AISC ASD design code.
2) Use HST M12/M16 Hilti bolt with embedded length -200mm for the divider beam
which connect to RC wall.