Standards:
We have considered for the verification of the steel members the Manual of Steel
Construction of the American Institute of Steel Construction Inc. AISC .
All members satisfy a deflection limit under service loads of L/360 and in overall the
Structure has a drift under gravity loads of 5mm.
Method of analysis:
The structure has been modelled & analyzed using the computer program Staad Pro and
thyssenkrupp factory calculation. The structure model is composed by linear members and
joints. At the bottom joints have been assumed as fixed supports and wall support is to be
only transmitting the horizontal forces (FX & FZ only).
Calculation results:
We include attached to this criteria a report including the input data, geometry,
mechanical properties of members, buckling factors, load cases, displacements,
reactions, stresses, demand/capacity factors, deflections. We also include some 2d
views showing joint labels and geometry as well.
4
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
5
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
The geometry adapted for the model of the structure is based on the Architectural
Drawings
Materials:
All members used in the structure are specified as ASTM A36 (equivalent to the BS EN
10025, Grade S275 JR).
Lateral supports on R.C.: we understand we will attach the structure to the concrete
When ever we have floor slab. Therefore we will have 2 supports whenever the floor
slab exists on both side at any particular level in order to minimize the load transferred to
the main structure.
Lift Number Steel beam Length Steel Beam size & Type Steel Beam Grade
PL09 Single Shaft RCC Single Shaft RCC Single Shaft RCC
PL12 Single Shaft RCC Single Shaft RCC Single Shaft RCC
SL1 & SL3 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275
SL2 & SL4 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275
SL5 & SL6 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275
The steel separate beam length is verified the size from 2.07m to 3.12m. The maximum
steel separate beam length is 3.12m (SL1~SL3 Lifts)
6
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
7
Installation Manual
Expansion drive
pipe
8
Rail support
Full weld
Full weld
Fixed support
Expansion drive
pipe
Full
weld
Full
weld
9
Full
weld
raker
Crosspiece
Bolt M12
Rail support
Spring washer
Fixed support 12
Big washer 12
Big washer 12
Bolt M12×40
10
Installation steps of guide rail
a) Installing the car rail
a.1) Connection of the guide rail and the rail seat:
Bolt M12
Spring
washer 12
Big washer 12
Spacer
Rail seat
Compression
guide plate
Spacer shim
Bolt M12×45
Rail support
Big washer 12
Spring
washer 12
Bolt M12
Bolt M12×40
11
a.3) Connection between guide rails
Rail connection plate
Guide rail
Guide
rail
Bolt M12
Spring
washer 12 Spacer
Rail seat
Spacer shim
Bolt M12×60
12
b.2) Connection between guide rail and rail support:
Big washer 12 Spring washer
Bolt M12
12
Bolt M12×50 Compression
guide plate Spacer
Spring washer 12
Big washer 12
Compression
guide plate
Bolt M12×40
13
Installation Manual
14
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
Note: 150 x 150 beam is more than enough calculation however, we have considered 200 x 200 mm
steel beam in higher side Note: Load capacity factor considered 0.3 I/O 0.2, due to higher side.
15
STTAD PRO TOOL STEEL BEAM CALCUALTION & CERITIRA
16
17
Moment resulting from connection eccentricity load added
18
Moment resulting from connection eccentricity load added
19
Moment resulting from connection eccentricity load added
20
Moment resulting from connection eccentricity load added
21
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
22
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
The loads input on each beam are comprised by three different forces: FY, FX * 2, which is
transferred to steel beam fixing on wall area.
Lift Number Steel beam Length Steel Beam size & Type Steel Beam Grade
PL09 Single Shaft RCC Single Shaft RCC Single Shaft RCC
PL12 Single Shaft RCC Single Shaft RCC Single Shaft RCC
SL1 & SL3 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275
SL2 & SL4 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275
SL5 & SL6 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275
Load case 1: cabin ecc. Left” loads due to the eccentricity and emergency break of the cabin.
Load case 2: cabin ecc. Right” loads due to the eccentricity and emergency break of the
cabin.
The guide rail loads that were given by the manufacturer are input on each of
The beams supporting the guide rail. These loads were input in two sets, case 1 and
Case 2, corresponding to each side of the cabin.
23
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
The above details are indicated the Load acting in the steel beam fixing area of wall. The
details of anchor bolt and guide rails load details are following contents part 4, 5, 6 & 7.
24
25
26
Welding Calculation
𝑃𝑉 = 1 𝐾𝑁
𝑃𝐻 = 10 𝐾𝑁
a = 6mm
EN 1993_1_8 4.5.3.2
B 𝜗⊥ ≤ 𝛿𝜐⁄𝛾𝜇2
1. S275 → 𝛿𝜐 = 410 𝑁⁄
𝑚𝑚2
2. As per Table 4.1 → 𝛽𝜔 = 0,85
𝛾𝜇2 = 1,25
𝐹 (𝑝𝑒𝑟𝑝𝑒𝑛𝑑𝑖𝑐𝑢𝑙𝑎𝑟 𝑜𝑛 𝑡ℎ𝑒 𝑤𝑒𝑙𝑑) 10 𝐾𝑁
3. 𝜗⊥ = 𝜏⊥ = = 6𝑥100 = 1,96 𝑁⁄
𝑇𝑜𝑡𝑎𝑙 𝑙𝑒𝑛𝑔𝑡ℎ 𝑜𝑓 𝑤𝑒𝑙𝑑 𝑥 𝑎𝑥√2 𝑚𝑚 x 6𝑥√2 𝑚𝑚2
𝜏∥ = 0
4. Verification
410
A [1,962 + 3 (1,962 + 𝑜 2 )]0,5 = 3,92 𝑁⁄ < = 385 𝑁⁄
𝑚𝑚2 1,25 𝑥 0,85 𝑚𝑚2
410
B 2,78 𝑁⁄ < = 328 𝑁⁄
𝑚𝑚2 1,14 𝑚𝑚2
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
28
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
The Anchor bolt using the steel beam bracket fixing and guide rail bracket fixing
29
30
31
32
33
HIT-HY 200 injection mortar
Anchor design (ETAG 001 / EN 1992-1) / Rods&Sleeves / Concrete
Injection mortar system Benefits
34
1 Updated: May-19
Approvals / certificates
Description Authority / Laboratory No. / date of issue
European technical Assessment a) DIBt, Berlin ETA-11/0493/ 2017-07-28 (HY200 A)
European technical Assessment a) DIBt, Berlin ETA-12/0006/ 2017-05-30 (HY200 A)
European technical Assessment a) DIBt, Berlin ETA-11/0492/ 2014-06-26 (HY200 A)
European technical Assessment a) DIBt, Berlin ETA-12/0084/ 2017-07-28 (HY200 R)
European technical Assessment a) DIBt, Berlin ETA-12/0028/ 2017-05-30 (HY200 R)
European technical Assessment a) DIBt, Berlin ETA-12/0083/ 2018-06-26 (HY200 R)
European technical Assessment a) DIBt, Berlin ETA-18/0837/ 2018-11-29 (HY200 A/R)
Shockproof fastenings in civil Federal Office for Civil BZS D 13-604 / 2013-12-31
defence installations Protection, Bern BZS D 13-603 / 2013-12-31
Fire test report IBMB, Brunswick 3502/676/12 / 2017-09-15
a) All data given in this section according to the ETA approval for the product.
For hammer drilled holes, hammer drilled holes with Hilti hollow drill bit:
Anchorage depth 1)
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
HIT-V
Embedment depth [mm] 80 90 110 125 170 210 240 270
Base material thickness [mm] 110 120 140 161 234 266 300 340
HIS-N
Embedment depth [mm] 90 110 125 170 205 - - -
Base material thickness [mm] 120 150 170 230 270 - - -
HIT-Z
Effective anchorage depth2) hef =lHelix [mm] 50 60 60 96 100 - - -
Effective embedment depth3) hef=hnom,min [mm] 70 90 110 145 180 - - -
Base material thickness [mm] 130 150 170 245 280 - - -
1) The allowed range of embedment depth is shown in the setting details.
2) For combined pull-out and concrete cone failure
3) For concrete cone failure
a) Hilti anchor rod HIT-Z-F: M16 and M20
35
Updated: May-19 2
Characteristic resistance
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
Non-cracked concrete
HIT-V 5.8 18,0 29,0 42,0 70,6 111,9 153,7 187,8 224,0
Tension NRk HIS-N 8.8 [kN] 25,0 46,0 67,0 111,9 116,0 - - -
HIT-Z a) 24,0 38,0 54,3 88,2 122,0 - - -
HIT-V 5.8 9,0 15,0 21,0 39,0 61,0 88,0 115,0 140,0
Shear VRk HIS-N 8.8 [kN] 13,0 23,0 34,0 63,0 58,0 - - -
HIT-Z a) 12,0 19,0 27,0 48,0 73,0 - - -
Cracked concrete
HIT-V 5.8 15,1 21,2 35,2 50,3 79,8 109,6 133,9 159,7
Tension NRk HIS-N 8.8 [kN] 24,7 39,9 50,3 79,8 105,7 - - -
HIT-Z a) 21,1 30,7 41,5 62,9 86,9 - - -
HIT-V 5.8 9,0 15,0 21,0 39,0 61,0 88,0 115,0 140,0
Shear VRk HIS-N 8.8 [kN] 13,0 23,0 34,0 63,0 58,0 - - -
HIT-Z a) 12,0 19,0 27,0 48,0 73,0 - - -
a) Hilti anchor rod HIT-Z-F: M16 and M20
Design resistance
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
Non-cracked concrete
HIT-V 5.8 12,0 19,3 28,0 47,1 74,6 102,5 125,2 149,4
Tension NRd HIS-N 8.8 [kN] 16,7 30,7 44,7 74,6 77,3 - - -
HIT-Z a) 16,0 25,3 36,2 58,8 81,3 - - -
HIT-V 5.8 7,2 12,0 16,8 31,2 48,8 70,4 92,0 112,0
Shear VRd HIS-N 8.8 [kN] 10,4 18,4 27,2 50,4 46,4 - - -
HIT-Z a) 9,6 15,2 21,6 38,4 58,4 - - -
Cracked concrete
HIT-V 5.8 10,1 14,1 23,5 33,5 53,2 73,0 89,2 106,5
Tension NRd HIS-N 8.8 [kN] 16,5 26,6 33,5 53,2 70,4 - - -
HIT-Z a) 14,1 20,5 27,7 41,9 58,0 - - -
HIT-V 5.8 7,2 12,0 16,8 31,2 48,8 70,4 92,0 112,0
Shear VRd HIS-N 8.8 [kN] 10,4 18,4 27,2 50,4 46,4 - - -
HIT-Z a) 9,6 15,2 21,6 38,4 58,4 - - -
a) Hilti anchor rod HIT-Z-F: M16 and M20
Recommended loads b)
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
Non-cracked concrete
HIT-V 5.8 8,6 13,8 20,0 33,6 53,3 73,2 89,4 106,7
Tension NRec HIS-N 8.8 [kN] 11,9 21,9 31,9 53.3 55,2 - - -
HIT-Z a) 11,4 18,1 25,9 42,0 58,1 - - -
HIT-V 5.8 5,1 8,6 12,0 22,3 34,9 50,3 65,7 80,0
Shear VRec HIS-N 8.8 [kN] 7,4 13,1 19,4 36,0 33,1 - - -
HIT-Z a) 6,9 10,9 15,4 27,4 41,7 - - -
Cracked concrete
HIT-V 5.8 7,2 10,1 16,8 24,0 38,0 52,2 63,7 76,1
Tension NRec HIS-N 8.8 [kN] 11,9 19,8 23,9 38,0 50,3 - - -
HIT-Z a) 10,0 14,6 19,8 29,9 41,4 - - -
HIT-V 5.8 5,1 8,6 12,0 22,3 34,9 50,3 65,7 80,0
Shear VRec HIS-N 8.8 [kN] 7,4 13,1 19,4 36,0 33,1 - - -
HIT-Z a) 6,9 10,9 15,4 27,4 41,7 - - -
a) Hilti anchor rod HIT-Z-F: M16 and M20
b) With overall partial safety factor for action = 1,4. The partial safety factors for action depend on the type of loading and shall be taken from
national regulations. 36
3 Updated: May-19
Characteristic resistance in case of seismic performance category C1
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
HIT-V 8.8, AM 8.8 - 14,7 29,0 42,8 67,8 93,1 113,8 135,8
Tension NRk,seis [kN]
HIT-Z a); HIT-Z-R 17,9 26,1 35,3 53,4 73,9 - - -
HIT-V 8.8, AM 8.8 - 23,0 34,0 63,0 98,0 141,0 184,0 224,0
HIT-Z a) - - -
Shear VRk,seis [kN] 7,0 17,0 16,0 28,0 45,0
HIT-Z-R 8,0 19,0 22,0 31,0 48,0 - - -
a) Hilti anchor rod HIT-Z-F: M16 and M20
Materials
37
5 Updated: May-19
Mechanical properties for HIT-Z
Anchor size M8 M10 M12 M16 M20
Nominal tensile HIT-Z(-F) a) 650 650 650 610 595
[N/mm²]
strength fuk HIT-Z-R 650 650 650 610 595
HIT-Z(-F) a) 520 520 520 490 480
Yield strength fyk [N/mm²]
HIT-Z-R 520 520 520 490 480
Stressed cross-
HIT-Z(-F) a)
section of thread [mm²] 36,6 58,0 84,3 157 245
HIT-Z-R
As
Moment of HIT-Z(-F) a)
[mm³] 31,9 62,5 109,7 278 542
resistance W HIT-Z-R
a) Hilti anchor rod HIT-Z-F: M16 and M20
38
Updated: May-19 6
Setting details for HIT-V
Anchor size M8 M10 M12 M16 M20 M24 M27 M30
Critical spacing
scr,sp [mm] 2 ccr,sp
for splitting failure
1,0 hef for h / hef ≥ 2,00
Critical edge distance for
ccr,sp [mm] 4,6 hef – 1,8 h for 2,00 > h / hef > 1,3
splitting failure c)
2,26 hef for h / hef ≤ 1,3
Critical spacing for concrete
scr,N [mm] 2 Ccr,sp
cone failure
Critical edge distance for
ccr,N [mm] 1,5 hef
concrete cone failure d)
For spacing (edge distance) smaller than critical spacing (critical edge distance) the design loads have to be reduced.
a) hef,min ≤ hef ≤ hef,max (hef: embedment depth)
b) Maximum recommended torque moment to avoid splitting failure during instalation with minimum
spacing and edge distance
c) h: base material thickness (h ≥ hmin)
d) The critical edge distance for concrete cone failure depends on the embedment depth hef and the
design bond resistance. The simplified formula given in this table is on the save side.
39
Updated: May-19 8
Setting details for HIS-N
Anchor size M8 M10 M12 M16 M20
Nominal diameter of drill bit d0 [mm] 14 18 22 28 32
Diameter of element d [mm] 12,5 16,5 20,5 25,4 27,6
Effective anchorage and drill
hef [mm] 90 110 125 170 205
hole depth
Minimum base material
hmin [mm] 120 150 170 230 270
thickness
Diameter of clearance hole
df [mm] 9 12 14 18 22
in the fixture
Thread engagement
hs [mm] 8-20 10-25 12-30 16-40 20-50
length; min - max
Minimum spacing smin [mm] 60 75 90 115 130
Minimum edge distance cmin [mm] 40 45 55 65 90
Critical spacing for splitting
scr,sp [mm] 2 ccr,sp
failure
1,0 hef for h / hef ≥ 2,0
40
9 Updated: May-19
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
41
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
The guiderail type and dimension are verified as per manufacture calculation based on
capacity, speed, car dead weight, rope weight, travel and gravity force. Which we provided
the guiderail force details in the GAD.
The guide rail loads that were given by the manufacturer are input on each of
The beams supporting the guide rail. These loads were input in two sets, case 1 and
Case 2, corresponding to each side of the cabin
Load case 1: cabin ecc. Left” loads due to the eccentricity and emergency break of the cabin.
Load case 2: cabin ecc. Right” loads due to the eccentricity and emergency break of the
cabin.
42
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
Stress calculation
Type T – 114 / B V = Load / Area = 62 x 1000 (N) / 2089 mm2 = 29,68 N mm2 < 275 N
mm2 safe
Type T – 75 3 / B V = Load / Area = 62 x 1000 (N) / 1099 mm2 = 56,41 N mm2 < 275 N
mm2 safe
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
44
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
45
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
The guide rail loads that were given by the manufacturer are input as per following table
Lift Number Steel beam Length Steel Beam size & Type Steel Beam Grade
PL09 Single Shaft RCC Single Shaft RCC Single Shaft RCC
PL12 Single Shaft RCC Single Shaft RCC Single Shaft RCC
SL1 & SL3 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275
SL2 & SL4 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275
SL5 & SL6 3.15 – 0.03 = 3.12 H beam 200 x 200 x 7 x 10 Grade S275
46
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
47
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
SL1~SL4 Lifts machine bed load acting points. The base plate size are mentioned in the GAD,
which is designed based following force loads.
Figure 1-2 Sketch map of installation the T/M in Top Floor of the Well
For installing the traction machine, the height of scaffold on the top floor can be adjusted on the actual
needs to provide enough space to install the traction machine, Shaft Top Beam of traction machine and
Governor Assy. The Traction machine, Shaft Top Beam of traction machine and Governor Assy. should
be suspended at the entrance of landing door on the top floor, so the scaffold should answer for the void
requirements of suspending. The safety requirements of scaffold can refer to the R000000241
<EC001-TS Preparation for Elevator Installation>.
1.5 Installation steps of traction machines
1.5.1 Install overspeed governor beam
a) Install I-shape steel bars in the well:
49
Tractor beam
Washer
Gusset plate
Bolt assembly
Figure 1-7 Installation of Traction machine Beam, Gusset Plate, Washer and Bolt Assembly
Connecting line of the CWT Connecting line of the Central line of the
guide railCWT guide rail car guide rail CWT pulley
Tractor beam
Gusset plate
Central line
of the car
50
Tractor beam
Gusset plate
Washer
Bolt assembly
Tractor beam
Hanging beam
Hanging beam
Tractor beam
Figure 1-11 Relative Position of Hanging Beam and Traction machine Beam
c) Fit the traction machine and the basket of the master installation tool outside the well on the top floor.
See Figure 1-12 (a/b/c/d).
51
Machine Bed Support Rubber PAD details
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
52
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
Hoisting Hook
Hoisting hook load KN details are indicated in the GAD, Main contractor to provide Hook
with TKE given load and location as per GAD. The construction unit guarantees the intension
and function of hook, obey the local regulation.
The design of Hook to calculate the shear value capacity with considered factor of safety 1.6
56
Main Parameters SL01 & SL02 KEY PLAN :
AA
AB AC AD
AA
Weather proof Shaft lighting, by tkea Escape ladder from Car top Weather proof Shaft lighting, 52
°
10 m
BUILD
ING
SETB
ACK
cable, GI Trunking & fixing by cable, GI Trunking & fixing by Rated Load(kg) 2000 (26 PERSON) DA
by tkeq
50
Rescue ladder inside ca
DB
55
tkeq (SMDB-04-L11-LIFT-01) tkeq (ESMDB-04-L10-01)
00
Rated Speed(m/s) 1.60
A
DC
75
-
by tkeq
00
DD
54
?
00
(Material & rating to be
DE D09
73
285 1125 1190 1190 1125 285
56 D08
00
38°
submitted separately) submitted separately)
STAIRWAY
ST-19
90
00 D06
A30 90
00
Control Style
A16
DUPLEX
9000
FIRE LOBBY 90
00 D04
9000
CORE 4
ZONE 05
90
00 D02
56
00 D01
9000
A27
300
B06
9000
400 400 Door Opening Type 4 PANEL CENTRAL OPENING A26
9500 B05
8650 B04
8650 B03
9000
B02
6365
ZONE 01
AD
9°
7500
Door Opening(DW×DH) (mm) 1400 x 2300
120
SERVICE LIFT
LOBBY
AC
ACK
ING SETB
10 m BUILD
8000
DROP ROOM
A24
? FIRE PUMP 5°
3°
ROOF AREA
SHAFT 12 AB
35°
ARD
RESERVATIONS SATELLITE
FFL +6.00
A23 CF DISHES AREA
7500
ARD Car Dimension(CW×CD×CH) (mm) 1500 x 2700 x 2950
ADMIN FFL +6.00
9000
C02 AA
6°
OFFICES
ACK
LUGGAGE
XRAY
LUGGAGE C02 AHU
SETB
CART SHAFT
CE C02
ING
A22
ILD
10600
BU
BD
7200
Suspension Ratio
FIRE PUMP SHAFT MEP PLANT ROOM
6°
5m
Intermediate fire 2:1 CD C02
BC
SL02
4900
K
SETBAC
8550
A21
SL01
3°
CC 145°
Inverter CTR
CORE 1
5700
DING
A20 BB
CB
3m BUIL
Traction Machine Type DAF 270 SERIES
9550
7350
9°
CAR GAUGE=1706
CA CORE 2
°
BA
90
K
G SETBAC
5m BUILDIN
A19
)
9°
2
6000
9000
9000
A18 C11 3°
C10
C09
9000
9000
9000
ZONE 03
6° C08 9000
A17
T114/B
C07
C06 9000
C05 9000
C04
6° C03
A16
62
C02
C01 6000
3° 6000
6000 A01
A15
9000 A02
1620
A14 A03
9000 A04
9000 A05
6°
6° 9° A06
1500
A13
6° 6° 3° A07
468 89 Trap door 89 248 248 89 Trap door 89 468 Power AC 3-415V-50Hz
A12
A11
A10 A09 A08
MS Steel Car Top filler CAST IRON 1. Structural calculation shall be resubmitted
CAR GAUGE=1706 Power Starting current (A) 89
Barricade 700mm height
separately
CAR DEPTH=2700
Supply Nominal current (A)
Ø450
50
SHAFT DEPTH=3150
890 800
Power Capacity(kVA) 43 2. Shaft Lighting submittal shall be submitted
225
H.COP H.COP
Light Capacity(kVA) [2+(OH+TH+PD-1)xLP/700 ① separately
3. Portable ladder one set at all floors in Lobby by
200
Heat Dissipation(kJ/h/lift) 11705
220 220 main contractor for firefighter reaching to car top,
Ø450 Ø450 Ø450 Ø450 Force (kN)
in case of emergency
P1 P2 P3 P4 P5 P6 P7 P8' P9 P10 Fx Fy
4. Interface drawings for Intercom, CCTV, BMS,
62
890 890 100 85 36 37 - 58 80 120182 62 2.2 2.8 Monitoring system, Fire alarm system will be
1200
MS Steel Car Top Force when safety gear operation submitted separately in coordination with main
Note: ①The result of formula
1530
Barricade 700mm height should be rounded up to integer. P10 contractor
The units of OH, TH and PD are Fx
MAIN 2nd MAIN 2nd meter, and the unit of LP is watt. Fy Fx
COP COP COP COP
SL02 SL01 For General requirement notes, please refer drawing sheet number - 006
Sill Sill
Doors Doors
REFERENCE CONTRACT DRAWINGS
115 185
A02
30
PAL-WAT-Z3-XX-M2-ARC- 4200 C00 CORE 1 ENLARGED PLANS
300
Filling required Filling required PAL-WAT-Z3-XX-M2-ARC- 4201 C00 CORE 1 ENLARGED PLANS
by Main contractor by Main contractor
Narrow Jamb Narrow Jamb
550 STRUCTURE OPENING 1630 70 350 350 70 STRUCTURE OPENING 1630 550
REFERENCE SHOP DRAWINGS
CAR WIDTH=1500 CAR WIDTH=1500
DRAWING NUMBER REV DRAWING TITLE
SHAFT WIDTH=2600 200 SHAFT WIDTH=2600 PAL-WAT-Z0-10-M2-ARC-1010~1125 C02 IFC PLANS
300 TOTAL SHAFT WIDTH=5400 300
Infilled with concrete or Cutout for Control panel
Cutout for Control panel
(Cutout to be closed after the control
(fire-proofing) decorate
by main contractor
SHAFT PLAN (Cutout to be closed after the control
panel installation by main contractor) panel installation by main contractor)
(At 12th. floor)
AA
Escape ladder from Car top
by tkea Escape ladder from Car top Certified for co-ordination with contract documents
Weather proof Shaft lighting, by tkeq Weather proof Shaft lighting,
cable, GI Trunking & fixing by Rescue ladder inside car DEPARTMENT COMPANY SIGNATURE DATE
A
-
300
400 400
ELECTRICAL 26.10.2019
120
DRAWING STATUS
Intermediate fire
02 ISSUED FOR APPROVAL 27.11.2019 KS M.M. M.M. A.K.
wall by main contractor
CAR GAUGE=1706
01 ISSUED FOR APPROVAL 10.11.2019 KS M.M. M.M. A.K.
00 ISSUED FOR APPROVAL 26.10.2019 KS M.M. M.M. A.K.
62
1620
1500
468 89 Trap door 89 248 248 89 Trap door 89 468
500×400 500×700 PROJECT
Counter weight sub
filler CAST IRON ALAR PROJECT DEVELOPMENT
Counter weight sub
CW GUAGE=1320
CAR GAUGE=1706
MS Steel Car Top filler CAST IRON CLIENT
Barricade 700mm height
AL JASRAH REAL ESTATE DEVELOPMENT WLL,
CAR DEPTH=2700
Ø450
SHAFT DEPTH=3150
890 800
QNB CAPITAL LCC
225
H.COP H.COP
200
PROJECT MANAGER
220 220
Ø450 Ø450 Ø450 Ø450
MS Steel Car Top LEAD DESIGNER | ARCHITECT | LANDSCAPE ARCHITECT ENGINEER:- STRUCTURE | MECHANICAL | ELECTRICAL |
1530
30
550 STRUCTURE OPENING 1700 350 350 STRUCTURE OPENING 1700 550 QATAR
ZONE 06
ACK
° SETB
52 ING
BUILD
10 m
50
DB
55
cable, GI Trunking & fixing by
00
cable, GI Trunking & fixing by
DC
75
00
DD
54
tkeq (SMDB-04-L11-LIFT-01) ?
00
DE
tkeq (ESMDB-04-L10-01)
D09
73
56 D08
00
38°
STAIRWAY
9000
FIRE LOBBY 90
00 D04
A29
90
00 D03
9000
285 1125 1190 1190 1125 285
CORE 4
AA
90
00 D02
A28
56
ZONE 05 00 D01
9000
A27
B06
9000
9500 B05
A26 8650 B04
8650 B03
9000
B02
6365 B01
3235
A25 CORE 3 VOID
ZONE 01
AD
9°
7500
SERVICE LIFT
LOBBY
300
AC
ACK
ING SETB
10 m BUILD
8000
DROP ROOM
A24
? FIRE PUMP 5°
3°
ROOF AREA
SHAFT 12 AB
180
180
180
180
35°
RESERVATIONS SATELLITE
FFL +6.00
A23 CF DISHES AREA
7500
ADMIN FFL +6.00
9000
C02 AA
6°
OFFICES
ACK
LUGGAGE
XRAY
LUGGAGE C02 AHU
SETB
CART SHAFT
CE C02
ING
A22
ILD
10600
BU
BD
7200
FIRE PUMP SHAFT MEP PLANT ROOM
6°
5m
CD C02
BC
SL02
4900
K
SETBAC
8550
A21
SL01
3°
CC CORE 1 145°
5700
DING
A20 BB
CB
3m BUIL
9550
7350
9°
CA CORE 2
°
BA
90
K
G SETBAC
5m BUILDIN
A19
)
P1 ZONE 02 ZONE 04
9°
2
6000
9000
9000
A18 C11 3°
C10
C09
9000
9000
9000
ZONE 03
6° C08 9000
A17 9000
C07
C06 9000
C05 9000
C04
6° C03
A16
C02
C01 6000
3° 6000
6000 A01
A15
9000 A02
9° A03
A14
9000 A04
9000
220 220
6° A05
6° 9° A06
A13
6° 6° 3° A07
A12
A11 A09 A08
A10
1620
hook per lift by tkeq
hook per lift by tkeq
Note:
5 Nos. of hoisting
5 Nos. of hoisting
1. Structural calculation shall be resubmitted
separately
2. Shaft Lighting submittal shall be submitted
SHAFT DEPTH=3150
30kN 30kN separately
450
450
30kN 30kN
3. Portable ladder one set at all floors in Lobby by
200
200
200
main contractor for firefighter reaching to car top, in
35kN 35kN case of emergency
Machine bed Governor & Hitching 4. Interface drawings for Intercom, CCTV, BMS,
support bed
Monitoring system, Fire alarm system will be
850
submitted separately in coordination with main
Machine SL02 contractor
SL01
120
1530
Ø25mm Mild steel HDG.
Design calculation to be
submitted by tkeq based on 30kN
30kN
100
loads 30 KN
-
REFERENCE CONTRACT DRAWINGS
DRAWING NUMBER REV DRAWING TITLE
B
PAL-WAT-Z3-XX-M2-ARC- 4200 C00 CORE 1 ENLARGED PLANS
HOOK DETAIL 55 900 600 205 205 600 900 55
A02
150
150
tkeq will coordinate with main contractor for 10kN 10kN PAL-WAT-Z3-XX-M2-ARC- 4201 C00 CORE 1 ENLARGED PLANS
hook fixing during slab casting
180
180
180
180
P2 P4 P4 P2
300
905 685 685 905 REFERENCE SHOP DRAWINGS
SHAFT WIDTH=2600 200 SHAFT WIDTH=2600 DRAWING NUMBER REV DRAWING TITLE
PAL-WAT-Z0-10-M2-ARC-1010~1125 C02 IFC PLANS
300 TOTAL SHAFT WIDTH=5400 300
Opening to be made close after Opening to be made close after
installation by main contractor installation by main contractor Weather proof Shaft lighting,
cable, GI Trunking & fixing
OVERHEAD PLAN
AA
by tkeq (ESMDB-04-L10-01)
Weather proof Shaft lighting, (Material & rating to be
cable, GI Trunking & fixing by submitted separately)
tkeq (SMDB-04-L11-LIFT-01) 285 1125 1190 1190 1125 285
Certified for co-ordination with contract documents
(Material & rating to be
submitted separately) DEPARTMENT COMPANY SIGNATURE DATE
ARCHITECTURAL QATAR
10.11.2019
300
400 400
STRUCTURAL QATAR
26.10.2019
Hook by tkeq Hook by tkeq MECHANICAL 26.10.2019
ELECTRICAL 26.10.2019
500
55 900 840 600 610 600 840 900 55
HOOK
500(w)x500(d)x500(h)
DRAWING STATUS
Fire lift Sump pit by 500 02 ISSUED FOR APPROVAL 27.11.2019 KS M.M. M.M. A.K.
main contractor CWT guard
CWT guard 01 ISSUED FOR APPROVAL 10.11.2019 KS M.M. M.M. A.K.
screen by
P6 P6
1620
screen by tkeq
tkeq 00 ISSUED FOR APPROVAL 26.10.2019 KS M.M. M.M. A.K.
REV. DESCRIPTION DATE DWN CHKD APPD APPD
700
SHAFT DEPTH=3150
CLIENT
P8' P8' P8' P8'
225
1-16x180x575 1-16x180x575 AL JASRAH REAL ESTATE DEVELOPMENT WLL,
Steel plate by tkeq Steel plate by tkeq
Weather proof Power socket and shaft light Weather proof Power socket and shaft light
P7 P7 P7 P7 QNB CAPITAL LCC
13A two way switch (ESMDB-04-L10-01) 13A two way switch (SMDB-04-L11-LIFT-01)
by main contractor by main contractor PROJECT MANAGER
HEADROOM HEIGHT=5000
P6 P6
Weather proof Lift Weather proof Lift 1000 1000
Stop button by tkeq Stop button by tkeq
3rd Floor, Salam Tower, Corniche Road, West Bay,
SAFETY AREA SAFETY AREA PO Box 207288, Doha, State of Qatar
4300
1530
tel: +974 4436 7288
Pit ladder (MS material) Pit ladder (MS material)
by tkeq LEAD DESIGNER | ARCHITECT | LANDSCAPE ARCHITECT ENGINEER:- STRUCTURE | MECHANICAL | ELECTRICAL |
700
700
by tkeq
CAD FILENAME:-PAL-MAN-Z4-ALL-SDW-TC-LF-0005 SHT 001-004 REV 00 (CORE 1).DWG
300
Intermediate fire Weather proof Shaft lighting 13 A two way switch SL02 SL01 Weather proof Shaft lighting 13 A two way
wall by main contractor (SMDB-04-L11-LIFT-01) by Main Contractor switch (ESMDB-04-L10-01) by Main Contractor
A02
250
250
SL01 SL02 Pit Inspection box london | 44 0 20 7906 6600 watg.com http://www.wsp.com
Pit Inspection box by tkeq
by tkeq
ARCHITECT OF RECORD & CONSTRUCTION SUPERVISION
+50.00 FFL +50.00 FFL Buildings & Infrastructure
300
12th.FL 12th.FL P.O. Box 55781, Doha, State of Qatar
Tel.: +(974) 4466 4203 Fax.: +(974) 4466 7843
Email: infoqatar@shakeregypt.com
1410 1190 1190 1410 www.shakergroup.com
SHAFT WIDTH=2600 200 SHAFT WIDTH=2600 SHAFT WIDTH=2600 200 SHAFT WIDTH=2600 MAIN CONTRACTOR SUB CONTRACTOR
TOTAL SHAFT WIDTH=5400 300 TOTAL SHAFT WIDTH=5400 300 Al Emadi Building, 250 D Ring Road
Tel : +974 4553366 Fax : +974 4553377
P.O. Box : 22373 Doha - Qatar
DRAWING TITLE
ZONE 06
ACK
° SETB
52 ING
BUILD
10 m
50
DB
55
Weather proof Shaft lighting 13 A two
00
DC
75
00
DD
54
?
2500
00
DE D09
73
3700
3700
56 D08
00
LIFT
90
00
3700
3700
D07
38°
STAIRWAY
A30 90
00 A16
9000
for SL02 Lift) by Main Contractor cable, GI Trunking & fixing by A29
FIRE LOBBY 90
00 D04
90
00 D03
9000
CORE 4
90
2500
A28
56
ZONE 05 00 D01
9000
Opening to be made 5 nos. of hoisting A27
9000
9
9500 B05
8650 B03
9000
2
B02
6365
ZONE 01
+55.30 SSL
AD
by main contractor
9°
submitted separately)
7500
SERVICE LIFT
LOBBY
AC
ACK
ING SETB
10 m BUILD
8000
DROP ROOM
A24
? FIRE PUMP 5°
3°
ROOF AREA
SHAFT 12 AB
35°
+38.90 FFL
RESERVATIONS SATELLITE
FFL +6.00
300
A23 CF DISHES AREA
7500
ADMIN FFL +6.00
9000
C02 AA
6°
OFFICES
ACK
LUGGAGE
+13.00 FFL
XRAY
LUGGAGE C02 AHU
SETB
CART SHAFT
CE C02
ING
A22
ILD
10600
BU
BD
7200
FIRE PUMP SHAFT MEP PLANT ROOM
6°
5m
CD
500
C02
BC
SL02
4900
K
SETBAC
8550
A21
SL01
3°
CC 145°
700
50 700
CORE 1
5700
5000
DING
A20 BB
CB
3m BUIL
9550
7350
9°
2500
CA CORE 2
°
BA
90
K
G SETBAC
5m BUILDIN
A19
)
ZONE 02 ZONE 04
9°
2
6000
9000
500
9000
A18 C11 3°
C10
9000
9000 ZONE 03
Cutout details
C09 9000
6° C08 9000
A17 9000
C07
5000
C06 9000
C05 9000
C04
6° C03
A16
C02
2500
6000 A01
A15
9000 A02
9°
Open
A14 A03
9000 A04
9000 A05
6°
6° 9° A06
A13
6° 6° 3° A07
emergency
A11 A08
700
A10 A09
3700
3700
exit.
2500
1. Structural calculation shall be resubmitted
4000
4500
8 separately
2500
2. Shaft Lighting submittal shall be submitted
7000
3. Portable ladder one set at all floors in Lobby by
2500
main contractor for firefighter reaching to car top, in
12
case of emergency
4. Interface drawings for Intercom, CCTV, BMS,
+50.00 FFL Monitoring system, Fire alarm system will be
2500
submitted separately in coordination with main
Weather proof Shaft lighting,
5000
contractor
3700
3700
Str. Ht. 2500
2500
5000
1 cable, GI Trunking & fixing
2500
SMDB-04-L11-LIFT-01 for
7 by tkeq (ESMDB-04-L10-01
for SL01 Lift &
SL02 Lift) (Material & rating REFERENCE CONTRACT DRAWINGS
3700
to be submitted separately)
+6.00 FFL SMDB-04-L11-LIFT-01 for
5000
+31.50 FFL
3700
SL02 Lift) (Material & rating
2500
PAL-WAT-Z3-XX-M2-ARC- 4200 C00 CORE 1 ENLARGED PLANS
Weather proof Shaft lighting, to be submitted separately)
cable, GI Trunking & fixing 11 PAL-WAT-Z3-XX-M2-ARC- 4201 C00 CORE 1 ENLARGED PLANS
by tkeq (ESMDB-04-L10-01
2500
2500
to be submitted separately) REFERENCE SHOP DRAWINGS
3700
3700
DRAWING NUMBER REV DRAWING TITLE
2500
DETAIL-Y SL01 & SL02 Lifts
6000
6000
6
5000
3700
3700
2500
5000
2500
10 Certified for co-ordination with contract documents
Str. Ht. 2500
5000
ARCHITECTURAL
G QATAR
2500
STRUCTURAL QATAR
26.10.2019
DETAIL-X
3700
3700
+0.00 FFL MECHANICAL 26.10.2019
2500
ELECTRICAL 26.10.2019
DRAWING STATUS
2500
5
MATCH LINE Y-Y 02 ISSUED FOR APPROVAL 27.11.2019 KS M.M. M.M. A.K.
3900
PROJECT
ALAR PROJECT DEVELOPMENT
5000
P
2500
CLIENT
3700
3700
-3.90 FFL
Travel height 57600
60
2500
tkeap
+20.40 FFL Sill
3rd Floor, Salam Tower, Corniche Road, West Bay,
Narrow Top PO Box 207288, Doha, State of Qatar
2500
Jamb
3700
header Narrow LEAD DESIGNER | ARCHITECT | LANDSCAPE ARCHITECT ENGINEER:- STRUCTURE | MECHANICAL | ELECTRICAL |
CAD FILENAME:-PAL-MAN-Z4-ALL-SDW-TC-LF-0005 SHT 001-004 REV 00 (CORE 1).DWG
4750
DETAIL-Y
3700
3700
2000
-7.60 FFL Weather proof Shaft lighting 13 ARCHITECT OF RECORD & CONSTRUCTION SUPERVISION
A two way switch Buildings & Infrastructure
5000
(ESMDB-04-L10-01 for SL01 Lift P.O. Box 55781, Doha, State of Qatar
Pit Depth 1900
3
2500
by Main Contractor
7500
by Main Contractor
7500 8000
Weather proof 1 phase Isolator 3 phase Isolator (ESMDB-04-L10-01) Weather proof 1 phase
C
-
ACK
° SETB
52 ING
(SMDB-04-L11-LIFT-01)
BUILD
Isolator (ESMDB-04-L10-01)
10 m
50
DB
by Main contractor
55
by Main Contractor by Main Contractor
00
DC
75
00
DD
54
?
00
DE D09
73
False ceiling False ceiling LIFT
56
00
D08
90
00 D07
38°
STAIRWAY
ST-19
90
00 D06
9000
FIRE LOBBY 90
00 D04
C
A29
-
90
00 D03
9000
50
50
CORE 4
90
00 D02
A28
56
ZONE 05 00 D01
9000
150
150
A27
120
120
B06
9000
B05
20
20
8650
9000
410 410
B02
6365 B01
3235
A25 CORE 3 VOID
ZONE 01
AD
50
50
9°
7500
SERVICE LIFT
LOBBY
AC
ACK
ING SETB
10 m BUILD
8000
150
150
DROP ROOM
A24
? FIRE PUMP 5°
3°
ROOF AREA
SHAFT 12 AB
120
120
35°
RESERVATIONS SATELLITE
FFL +6.00
A23 CF DISHES AREA
7500
ADMIN FFL +6.00
9000
C02 AA
6°
OFFICES
ACK
20
20
LUGGAGE
XRAY
LUGGAGE C02 AHU
SETB
CART SHAFT
CE C02
ING
A22
ILD
10600
BU
BD
7200
FIRE PUMP SHAFT MEP PLANT ROOM
6°
5m
False ceiling Height 2600 at 2nd. ~ 11th. floors
SL02
4900
K
SETBAC
8550
A21
SL01
3°
CC CORE 1 145°
5700
DING
A20 BB
CB
3m BUIL
9550
7350
9°
CA CORE 2
°
BA
90
K
G SETBAC
JAMB JAMB
5m BUILDIN
A19
)
ZONE 02 ZONE 04
9°
2
6000
9000
9000
Structure opening Height 2500
JAMB JAMB
A14 A03
9000 A04
9000 A05
6°
6° 9° A06
A13
6° 6° 3° A07
A12
A11 A08
DOORS DOORS
A10 A09
250
Ø50 Hole (Typical) DOORS DOORS
397 105 397 1. Structural calculation shall be resubmitted
Cutout for LOP
1780
1780
separately
2. Shaft Lighting submittal shall be submitted
250
Ø50 Hole (Typical)
Cutout for LOP separately
Filling required Filling required
by Main contractor by Main contractor
3. Portable ladder one set at all floors in Lobby by
950
main contractor for firefighter reaching to car top, in
SL02 SL01
Filling required Filling required
case of emergency
by Main contractor by Main contractor 4. Interface drawings for Intercom, CCTV, BMS,
950
FFL FFL SL02 SL01
Monitoring system, Fire alarm system will be
submitted separately in coordination with main
90 150 400 90 90 400 150
70 90 contractor
350
350
70
550 DOOR ROUGH=1700 350 350 DOOR ROUGH=1700 550 FFL FFL
TOTAL SHAFT WIDTH=5400 550 DOOR ROUGH=1630 70 350 350 70 DOOR ROUGH=1630 550
115
PAL-WAT-Z3-XX-M2-ARC- 4201 C00 CORE 1 ENLARGED PLANS
300
Filling required Filling required
by Main contractor by Main contractor
115
300
90 DOOR WIDTH=1400 70 DOOR WIDTH=1400 Filling required Filling required
70 90 by Main contractor by Main contractor REFERENCE SHOP DRAWINGS
550 STRUCTURE OPENING 1700 350 350 STRUCTURE OPENING 1700 550
DRAWING NUMBER REV DRAWING TITLE
SHAFT WIDTH=2600 200 SHAFT WIDTH=2600 150 400 90 DOOR WIDTH=1400 DOOR WIDTH=1400 90 400 150
PAL-WAT-Z0-10-M2-ARC-1010~1125 C02 IFC PLANS
300 TOTAL SHAFT WIDTH=5400 300 550 STRUCTURE OPENING 1630 70 350 350 70 STRUCTURE OPENING 1630 550
Infilled with concrete or Infilled with concrete or SHAFT WIDTH=2600 200 SHAFT WIDTH=2600
(fire-proofing) decorate ENTRANCE VIEW (fire-proofing) decorate
by main contractor by main contractor 300 TOTAL SHAFT WIDTH=5400 300
(At B, P, 1 ~ 11th. floors)
Infilled with concrete or Infilled with concrete or
C
Cutout for Control panel
(Cutout to be closed after the control (fire-proofing) decorate ENTRANCE VIEW (fire-proofing) decorate
Cutout for Control panel
(Cutout to be closed after the control Certified for co-ordination with contract documents
-
50
26.10.2019
150
150
MECHANICAL
120
120
20
20
ELECTRICAL 26.10.2019
120 150 DETAIL-Y 60 FFL
150
90
DRAWING STATUS
60
80 90
410
Ø50 Hole (Typical) 02 ISSUED FOR APPROVAL 27.11.2019 KS M.M. M.M. A.K.
190
Cutout for
Cutout for 01 ISSUED FOR APPROVAL 10.11.2019 KS M.M. M.M. A.K.
fireman switch 20 Sill
20
fireman switch
80
80
00 ISSUED FOR APPROVAL 26.10.2019 KS M.M. M.M. A.K.
Structure opening Height 2500
90
Structure opening Height 2500
Bolts fixing
1750
SL02 SL01
3rd Floor, Salam Tower, Corniche Road, West Bay,
PO Box 207288, Doha, State of Qatar
tel: +974 4436 7288
FFL FFL
LEAD DESIGNER | ARCHITECT | LANDSCAPE ARCHITECT ENGINEER:- STRUCTURE | MECHANICAL | ELECTRICAL |
DETAIL-Z
CAD FILENAME:-PAL-MAN-Z4-ALL-SDW-TC-LF-0005 SHT 001-004 REV 00 (CORE 1).DWG
60
www.shakergroup.com
header Narrow
DETAIL-X MAIN CONTRACTOR SUB CONTRACTOR
300
90 DOOR WIDTH=1400 70 70 DOOR WIDTH=1400 90 (At G. floor) (At B, P, 1 ~ 12th. floors) QATAR
DRAWING TITLE
550 STRUCTURE OPENING 1700 350 350 STRUCTURE OPENING 1700 550
DETAIL-Y
SHAFT WIDTH=2600 200 SHAFT WIDTH=2600
ENTRANCE VIEW FOR SL01 & SL02 LIFTS
300 TOTAL SHAFT WIDTH=5400 300
Infilled with concrete or Infilled with concrete or THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
(fire-proofing) decorate ENTRANCE VIEW (fire-proofing) decorate DRAWING NUMBER: SCALE 1:20 ORIG. DWG SIZE: A1 REV.
by main contractor by main contractor
(At G. floor) PAL-MAN-Z4-ALL-SDW-TC-LF-0005 Sht. 004 Con't. on END 02
Rev Date
Structure Calculation Connection Design
for Alar Hotel
4 29-04-2020
11. CONCLUSION
Conclusion:
1) As a result of our analysis the member are found safe as per AISC ASD design code.
2) Use HST M12/M16 Hilti bolt with embedded length -200mm for the divider beam
which connect to RC wall.