Monthly Action Plan, January 2016

Sr. No Source Purposal

1 Project Head LT DG Shifting

2 Project Head LT DG panel shifting

3 HOD E&I Submercible pump Power supply option from 30 KVA DG

4 Breakdown Control cable jointing for Raw mill water tank float
5 decided in meeting Bag filter Operation in DP mode

6 HOD E&I Bag Filter Manometer relocation

7 Modification in lab New lab below cooler light, power wiring

8 HOD E&I 1 BHK electrical wiring

9 Project Head Cable drum shifting from CCR

10 HOD E&I Welding machine repairing

11 Project pending Job Power bus bar arrangement at LS crusher raw mill, coal mill,
12 Decided in meeting ZSS modification

13 HOD E&I ZSS trial

14 HOD E&I control trial of Raw mill CA fan, classifier, tertiary crusher

15 Plant Head LC 3 transformer earthing modification

16 HOD E&I Electrical store 5 S

17 HOD E&I Air Blaster trial after modification in contoller time setting as
18 HOD E&I Modification in water drain in compressure air receiver tank fo

19 decided in meeting Preheater Fresh air damper trial after modification for fire pro

20 decided in meeting Coal bin calibration

21 decided in meeting Raw Coal Hopper calibration

22 Plant Head CCR transformer power cable rerouting & dressing

23 HOD E&I Coal mill and Kiln feed SFM calibration

24 HOD E&I LC1 MCC power bus bar and control tightness checking
25 HOD E&I CCR MCC power bus bar and control tightness checking

26 Breakdown Proximity switches to be replace at DPC dicharge gate open

27 HOD E&I LC -2 control transformer shifting and bus bar tightness

28 HOD E&I Packing Plant MCC bus bar, power, and control tightness

30 Daily basis services


DG diesel filling
Dg start & Stop & power changeover
welding & machine connection
grinding machine connection
Drill machine connection
house keeping
Others services
Monthly Action Plan, January 2016

Activity Responsibility Target Date Accountability

1. Arrangement for utility/ emergency power supply


2. Dismentaling of power & control connection .
3. Regger gang for shifting of DG, start
4 Installation of DG, 17.01.2016
Mr. Manish Yadav HOD E&I
5 power & control connection. finishing at
6. testing of DG, 30.01.2016
7. Change over swith Connection

1. Arrangement for utility power supply


2. Dismentaling of connection .
3. Regger gang for shifting of DG, start
4 Installation of pannel , 17.01.2016
5 power & control cable laying dressing & connection. Mr. R M Kushwaha HOD E&I
finishing at
6. testing of DG with power & control cable, 30.01.2016
7. Change over switch, power cable dismentalling , fixing and
again cable Connection

1.power cable laying through temprorary route,


2.Dismentaling of old cable, 06.01.2016 to
3.Both side cable connection, Mr. Martand HOD E&I
07.01.2016
4. testing of pump operation

1. Digging of controll cable,loop testing of cable,


08.01.2016 to
2.Proper jointing & insulation of cable. Mr. R M Kushwaha HOD E&I
10.01.2016
3 laying of cable in under ground
1.Required process team operation & DP observation.
2.Final setting of DP switch at per operation requirement and 10.01.2016 to
final, Mr. Mostkim HOD E&I
15.01.2016
3. NEA power schedule

1.Dismentaling of copper tube After material


Mr. Faizan HOD E&I
2. PU connector & PU pipe required aviability

1.Wall cutting as per cable route & power socket & panel board
2.HDP pipe laying,
3.Metal box & panel board fixing. 02.01.2015 to
4.Mains input & power cable laying as per load, Mr. Manish HOD E&I
12.01.2016
5. MCB, Starter fixing, switches & power socket fixing. Cable
connection, testing of power to machine,

1.Wall cutting as per cable route & power socket & panel board
2.HDP pipe laying,
3.Metal box & panel board fixing subject to
4.Mains input & power cable laying as per load , Mr. Sathish material HOD E&I
5. MCB, fixing, switches & power socket fixing. Cable aviability
connection, testing of power to machine

1. Ground prepration as per standard,2. shifting of cable with subject to


hydra & tipper,3. arrange drum as proper way Mr. R M Kushwaha ground HOD E&I
availability

Mr. Martand 30.01.2016 HOD E&I

1.Power Distribution Pannel for welding machine, grinding &


other services,2.Power cable laying,3. Power Junction Box
fixing,4. , MCB chanel,MCB,Terminal connector fixing in the JB, 10.01.2016 to
Mr. R M Kushwaha HOD E&I
5.cable gland hole & cable glanding in cable, 6.cable connection 15.01.2016
at both end
1. Drawing approval of proximity stand & drill hole rotating flap, 2.
prepration of proximity stand & rotating flap,3. Drill hole in the
shaft and making thread in the shaft.4. fixing of stand & rotating 10.01.2016 to
Mr. Faizan HOD E&I
flap as per shout & site. 5.Testing of ZSS and its feedback in PLC 15.01.2016
taping of

Trial to be done as per NEA power schedule start


17.01.2016
Mr. Faizan HOD E&I
finishing at
30.01.2016

Trial to be done as per NEA power schedule 10.01.2016 to


Mr. Vikash Mishra HOD E&I
15.01.2016

1.make the drawing of earth pit & connection 2. Checked the


earthing value of grid & individual earth pit,3. Do the digging as
per water level of raw mill floor, 4.Put the earthing rod in side the
earth as base referance of raw mill floor.5.Checked the value of
individual value of earth pit and grid.6.If resistance value is high Mr. Manish yadav HOD E&I
then make the new pit as per standard 7. Make the floor level as
per required 8. connect the strip with grid and transformer.

As per 5 S guideline start


17.01.2016
Mr. Manish Chaudhary HOD E&I
finishing at
30.01.2016

Trial to be done as per NEA power schedule start


17.01.2016
Mr. Vikash Mishra HOD E&I
finishing at
25.01.2016
1. Required solenoid volve with coil
2.required mechanical help for pipe fitting solenoid valve fiitting. start
3. control cable laying fro compresor to RIO panel 20.01.2016
4. loop testing Mr. Mostkim HOD E&I
finishing at
5. PLC logic implementation 6. Final operation testing 30.01.2016

Trial to be done as per NEA power schedule start


17.01.2016
Mr. Mostkim HOD E&I
finishing at
19.01.2016

1.Required min 5ton standered weight, start


2.and manpower for lifting weights over bin, 12.01.2016
3. required ups supply during calibration period Mr. Vikash Mishra HOD E&I
finishing at
19.01.2016

1.Required min 5ton standered weight, start


2.and manpower for lifting weights over bin, 12.01.2016
3. required ups supply during calibration period Mr. Vikash Mishra HOD E&I
finishing at
19.01.2016

1. Shutdown for 12 days, start


2 cutting set for support & frame of cable tray. 01.02.2016
3. Action plan as attached Mr. Manish, Mr. Martand HOD E&I
finishing at
10.02.2016

1. cross checking first with variable drafts, then calibration at 30- start
40 mm wc draft condition 20.01.2016
Mr. Vikash Mishra HOD E&I
finishing at
25.01.2016

start
10.01.2016
Mr. R M kushwaha HOD E&I
finishing at
11.01.2016
start
12.01.2016
Mr. R M kushwaha HOD E&I
finishing at
13.01.2016

1. Proximity switches to be change start


2. testing of feedback as per NEA schedue 25.01.2016
Mr. Vikas Mishra HOD E&I
finishing at
30.01.2016

start
05.01.2016
Mr. Mustkin HOD E&I
finishing at
07.01.2016

start
10.01.2016
Mr. Suryabali HOD E&I
finishing at
15.01.2016

Mr. Martand HOD E&I


Mr. Martand HOD E&I
Shift Incharge HOD E&I
Shift Incharge HOD E&I
Shift Incharge HOD E&I
Sectional Incharge HOD E&I
Shift Incharge HOD E&I
Remark

Completed

Completed
Completed
Completed
UNITED CEMENTS PVT. LTD.
NAUBISE-4, DHADING, NEPAL
Daily E&I HOD work book
Sl.no. Date Location Discription

MCC bus bar tightness and


1 LC 2 blowering work was done and also
2/1/2016 feeder tightness work completed.
2 LC 1 Room cleaning and cable dressing
work
3 House keeping work
13 nos. ceiling rose fixed and 4*4
box covered with top and some
4 Admin bulding neatness work done

5 Cooler Area Two welding set connection


6 Cement silo One light connection
From room 30 two exhaust fan and
7 Admin bulding 2.5 Sq.mm wire coil was taken
and kept in store number 4.
Room cleaning and cable dressing
03/01/2016
8 LC 1 was done

Raw mill Truck Cable dressing work was done


9
trippler

KC and PC firing FK pump Solenoid


10 Coal mill valve checked in presence of
Mechanical department.It is
working properly
11 packing plant Bag printing M/C shifting work
from Main store to Packing plant
12 Coal mill House keeping work
13 Cement mill 800 LQ1 and 800 LQ2 damaged
indication lamp changed.
14 100 DC 1 DP switch setting was set -100 bar
as per the instruction of Mr.J.K
15 Raw mill 300 LQ1 and 300 LQ2 damaged
indication lamp changed

04/01/2016
7 watts CFL light fixed for
16 Admin bulding staircase doom light and two wall
light removed in second floor and
04/01/2016
17 Admin bulding Three tube light fixed in terse and
connection was done.
Loose cable 3.5 core x 70 sq.mm
18 removed inbetween MRSS and Raw
mill hopper
Cable damaged at feeder side
19 900 FN 7 gland so cable cut and newly
glanded and termination work was
20 Badging plant control panel and
control cable shifted to LC2.
MCC bus bar tightness and
21 LC 2 blowering work was done and also
feeder tightness work completed.
Control transformer shifting work
22 LC 2 completed.

Power DB Cleaning, 4P 63 A MCB


23 New Lab fixed and Termination was done in
05/01/2016
both side. Power has been charged
from CCR Lighting Panel in Cable
All floor load checked and Coaxial
24 Admin bulding cable root found and faulted DTH
corrected with Service Engineer.
Teritary Welding JB work was completed.
crusher &
25
Coal mill

MPCB fixed and termination work


26 New Lab done inbetween MPCB and TB was
done.
Raw mill hopper top sequential
27 timer panel card removed and
06/01/2016 shifted to Packing plant work.
Raw mill LRS motor running
Continuously so checked and
28 Raw mill found that V- Belt was in burn
condition and also auxiliary
contactor was in damaged
condition. Auxiliary contactor was
MCC 6 Bus bar tightness and
blowering work, KC and PC firing
29 Coal mill
Panel blowering and tightness
work and Weigh feeder and RIO
panel bloering and cleaness work
30 Raw mill hopper feeding
Sequential timer connection was
31 Packer top bag filter sequential
timer panel connection was done.
3P 32 A MCB fixed and connection
32 Pump House was done in MCB and lighting
07/01/2016 panel side in Admin building.
Casing caping laying and DOL
33 New Lab starter fixing work and power
cable laying for three motors
Power cable phase sequence
34 Admin bulding checked and one gyser connection
changed from y phase to R phase.
Welding JB power cable connected
35 Near DPC

Net adapter is shifted from Plant


36 CCR Building head room to CCR Cable celler
room with IT person.
packing plant sequential timer connection was
37
900 DC 1 done and trial taken.
38 Packing Plant Light separation work was done.

39 Cement silo Light separation work was done.

Packing plant House keeping work


40 and cement
silo
Blending silo light replace and bag filter mano
41
inside meter water level maintenance
ZSS stand and target work for
42 ESP hopper screw conveyor with
Mechanical department.
43 Kiln and Cooler House keeping work

Raw mill trial in auxilary drive all


44 Raw mill LQ and FLS was running for
08/01/2016
mechanical requirement.
45 Raw mill Flow switch cable problem found
and cable removing work is under
08/01/2016

Power transformer earthing


46 LC3 removed and value taken in mesh
mode and individual mode and its
neutral earthing strip collected in
In Plant head room one extension
47 CCR Building box fixed and net and power cable
dressing work was done with IT
DOL starter to Motor cable
termination done and Power
48 New Lab
switch and socket fixing work is
under progress.

Cement mill Welding JB work.


49 near weigh
feeder
Solenoid valve mounted for
50 Pre heater compressor air receiver tank for
operate from CCR DO connection
was done in RIO panel. The
51 09/01/2016 Coal mill Earthing piet nut bolt mounted and
tightness.
52 LT DG panel shifting work.

Cooler and Weling and drilling machine


53
Rawmill connection.
LC 2 and CCR Control transformer power supply
54 changed from SFU income side to
MCC 5
Outgoing side.
600 RVF 1 and 500 DPC 2 ZSS
stand and target work completed
Clincker silo with mechanical department. Trial
55
top taken in Local and Remote mode
while 500 DPC 2 trip due to ZSS
fault so checked and found ZSS
500 RVF 1,2,3 controller problem so controller
Trial were taken in Local and
56 and 500 CC 1 remote mode. ZSS is working
and 2
properly.
Following equipments trial were
done- 200 WF 1,2,3 and 4, Raw mill
57 CA fan, Raw mill classifier, Coal
mill classifier, Raw mill Main drive
LRS, Tertiary crusher LRS, Kiln
feed SFM, Coal mill SFMs.

10/01/2016
Lighting switch board and power
58 New Lab switch and socket termination and
fixed. MCB fixed and termination
10/01/2016 was done for lighting and power
UPS power supply was given to
59 CCR Building CCR Conference hall PC from PLC
control desk VIA third floor power
Near Cement Welding JB connection work
60 mill weigh
feeder

Near Clinker 400 A bus bar and 160 A MCCB


61 removed from loose supply.
silo

LC 5 Cable 400 A bus bar and 160 A MCCB


62 fixed. Cable jointing work is under
cellar
progress.
63 New Lab Three motor trial taken and
lighting connection was given in
Panel cleaning and bus bar
64 LC 1- MCC 1 tightness was done and also cable
tightness was done.
65 Raw mill water tank sensor cable
laying and connection was done.
66 Gate No 2 One granding Machine supply was
given for mechanical.
Clincker silo 5 nos proximity switches replaced
67
top in DPC pneumatic gates.
One earthing rod resistance value
Near LC 3 checked step by step while
68
Transformer
inserting the Earthing rod into the
ground. Values are noted in Shift
Ground Leveling work is under
Near LC 3 progress. After leveling one by one
69
Transformer
Earthing rods are inserting into
the ground accroding to the
Two Welding panel shifted from
70 store. One shifted to LC 3 and
another one to LC 5. In LC 3 panel
MCC 2 and MCC 3 control power
supply was in ON condition even
MCC power was in OFF so checked
71 LC 3
the connection in bus bar but it is
OK. Again searched and found out
Power mixing problem in RIO panel
after separate the supply it is OK.

11/01/2016
One extention box prepared and
72 CCR Building connection given in CCR MCC
11/01/2016 room for corpenter work.
73 Lab Switch boards are covered with
Carry bag for wall plastering work.
Cable laid inbetween compressor
74 Packing Plant air receiver tank and RIO panel for
solenoid valve. The termination
work is under progress.
75 Intend report preparation work.
After ZSS modification work trial
Raw mill was taken all are working properly
76
section
except 100 BC 1 and 23 due to
target problem. So informed to
600 RVF 1 and Trial were taken again after
77
500 DPC 2 change the timing setting of ZSS
controller. It is working properly.
DPC Pneumatic gates solenoid
78 checking one by one and trial from
CCR is Under progress.
New solenoid valve took from
79 store and checked for popet
damper purpose but this valve is
not proper fitting and holes are not
Neutral Earthing value checking
work when earthing rod inserted
LC 3 into ground and earthing
80
Transformer
chemicalwith water was added.
The individual earth pit values are
19.2 ohms, 29.8 ohms and in mesh
81 Cement mill area welding Panel
installation work was done.
82 Packing plant Auto drain valve was fixed for
packing plant air receiver tank 1
83 Packing plant Packer start at 2:10 pm and
stopped at 3:00 PM.
12/1/2016 Power and control cable laying
Damper for work was completed but cable
84
Kiln PA Fan
dressing work and LPBS Mounting
works are under progress.
Clincker silo top all 6 gates open
and close feed back are taken
85
inline with process team but Gate
number 4 is mechanically jam so it
is not operating full open and
86 500 CC 2 ZSS Trial taken now it is working
properly.
500 AR 1 and LPBS cable dressing was done.
87
1A
cable laying & cable dressing
Damper for PA completed from PA Fan to MCC 5
88
Fan
Pannel.but cable glanding work
under progress
Damper for PA damper LPBS mounting & fixining
89 work completed
Fan

In LC5 welding power pannel 3


Cement mill power cable connected
90
13/01/2016 MCC
( 3.5*50sq.mm) & 70sq.mm cable
laid for charging the welding
transformer neutral earthing
LC3 - resistance value checked by added
91
Transformer
earthing chemical powder .and its
value checked in individual and
one body earthing rod shifted to
LC3 - another place and dag the soil in
92
Transformer
mannually and filled the earthing
chemical after that fix the earthing
Pre heater top After Mosdification Trial Taken
93 Pnematic from CCR It is working
gates
properly.Open and Close Feed
94 LC 2, LC4 House keeping work was done.

95 LC 3 Cleaning work was Done

Kiln PA Fan Gland works were done for power


96 and control cables in LPBS and
damper
MCC panel sides.
MCC 5 to RIO panel cable laid for
97 damper and glanding works were
completed. But termination is
under progress

14/01/2016
Another one body earthing rod
removed from the place so the soil
was digged by manually and filled
LC 3 the earthing chemical Powder with
98
Transformer water after that the earthing rod
14/01/2016 was fixed into the ground. The
earth value is 8.3 ohms. Yesterday
fixed earth pit value is 44 ohms.
The earth Value
transformer improving
neutral earthingProcess
resistance value checked by added
LC 3 earthing chemical powder .and its
99
Transformer
value checked in mesh mode.
Value is 3.24 ohms.so Earth
improving process is going on.
Kiln Tyre RTD Cable rerouting work is
100 Number underprogress.cable tray removed
9,10,11,12
and G.I pipe used for RTD cable.
Kiln auxilary Run for mechanical requirement.
101 and Thurester Thurester pressure is 50 Kg/Cm2.
pump
125 KVA DG, 380 KVA A and DG
synchronising panel and power
102
distribution panel cables were
disconnected and shifted from LT
DG room to HT DG.
60 Mtr Length 3.5C x 50 sqmm
103 Clinker silo cable laid and Dressing work
completed from LC5 welding
panel to clincker silo bottom.
3.5C x 120 sqmm Cable
104 LC 5 termination work was completed
PCC panel side with 250 A SFU
Unit and welding panel incomer
Near CCR building power
transformer(2.5 MVA, 6600/415V)
secondary side power cable (1C x
Near CCR 630 sqmm 25 Nos) redressing
105 power work started and the cable tray
transformer and L- channel was cut by use of
cutting machine. After that
disconnect the power cable
15/01/2016 (R,Y,B,N) in sequence and marked
with respective
15/01/2016
150 Watts Halogen Light 2
106 numbers fitted near CCR
transformer for night time
1.5 sqmm cable laid from 30 KVA
107 DG to CCR transformer for Power
transformer work.
108 75 x 75 mm L channel taken from
scrap yard for Power transformer
300 AD 1 Power contactor (3TF46) changed
109 Raw mill Aux. with new one, because its old
Drive
contactor moving and fixed
120 sqmm cable removed from HT
110 HT DG Room DG Auxilary panel and connected
in LT panel.
240 sqmm cable dismanteld cable
111 from 380 KVA DG shifted to LC 5
Cable cellar.
Near CCR Transformer secondary side
112 power cables disconnected and cable
transformer
tray mounting work.
1000 BC1, 2 ZSS target mounting work with
113
and 3 mechanical department.
100 DC 1, 200 DP switch setting was set 100 bar
114 16/01/2016 DC 1, 2 and as per the instruction of Mr. J.K
300 DC 1
singh sir.
115 Cooler Area One welding machine connection
was done.
one Grinding machine and drilling
116 machine connection was done in
coal mill and CCR transformer
TS PVT. LTD.
DING, NEPAL
OD work book
Manpower Pending
Remaks
Engaged status

Mr.Mostkim, Under progress


Mr.Raman

Mr. Faizan Under progress


Mr, Harendra
E&I

Mr. Sathish,
Mr.Harendra, completed
Mr.Hari

Mr. Harendra completed


Mr. Harendra completed

Mr.Sathish completed

Mr. Raman,
Mr. Vishal, completed
Mr.Rajesh.

Mr.Manish Yadav,
Mr.Manish C, completed
Mr.Sanjeev

Mr. Faizan,
completed
Mr.Raman

Mr. Surya Bali,


completed
Mr.Mohit
Mr.Mostkim completed
Mr.Mostkim,
completed
Mr.Raman
Mr.Mostkim,
completed
Mr.Raman
Mr.Mostkim,
completed
Mr.Raman
Mr. Sathish
completed
Mr. Vishal

Mr. Sathish
completed
Mr. Vishal
Mr. Ram mano
Mr. Sanjeev completed
Mr. Rajesh
Mr. Manish Yadav
Mr. Suriya bali completed
Mr. Mohit
Mr. Manish yadav
completed
Mr. Sanjeev
Mr. Mostkim
Mr. Raman & completed
1 Helper
Mr. Mostkim
Mr. Raman & completed
1 Helper

Mr. Manish Yadav


Mr. Sathish completed
Mr. Sanjeev

Mr. Sathish
completed
Mr. Marthand

Mr. Ram Mano


completed
Mr. Harendra

Mr. Manish Yadav


Under
Mr. Sathish
Progress
Mr. Vishal

Mr. Mostkim Under


Mr. Gautham Progress

Mr. Mostkim
completed
Mr. Manish Yadav
Mr. Mostkim
Mr. Raman
completed
Mr. Harendra
Mr. Gautham

Mr. Mostkim
completed
Mr. Harendra
Mr. Faizan
completed
Mr. Mohit
Mr. Sathish
Mr. Marthand completed
Mr. Vishal
Mr. Manish yadav
Mr. Sanjeev completed
Mr. Vishal

Mr. Sathish
completed
Mr. Vishal

Mr. Ram mano


Mr. Sanjeev completed
Mr. Hari

Mr. Sathish
completed
Mr. Vishal

Mr. Suriya bali


completed
Mr. Mohit
Mr. Suriya bali
completed
Mr. Mohit
Mr. Suriya bali
completed
Mr. Mohit

Mr. Suriya bali


completed
Mr. Mohit

Mr. Faizan
completed
Mr. Rajesh

Under
Mr. Faizan
progress

Mr. Misra
completed
Mr. Faizan

Mr. Ram mano completed

Mr. Ram mano


completed
Mr. Sajjad
Mr. Manish Yadav
completed
Mr. Raman

Mr. Sathish
completed
Mr. Vishal

Mr. Manish Yadav


Mr. Sathish
Under
Mr. sanjeev
Progress
Mr. Vishal

Mr. Sanjeev Under


Mr. Vishal Progress

Mr. Mostkim
completed
Mr. Gautham

Mr. Mostkim
completed
Mr. Gautham
Mr. Mostkim Under
Mr. Minu Progress

Mr. Gautham completed

Mr. Mostkim
completed
Mr. Raman

Mr. Faizan completed

Mr. Faizan completed

Mr. V Misra
completed
Mr. Raman
Mr. Sathish
completed
Mr. Harendra

Mr. Sathish completed

Mr. Manish yadav


Mr. Sanjeev completed
Mr. Vishal
Mr. Manish yadav
Mr. Sanjeev completed
Mr. Vishal
Mr. Manish yadav
Under
Mr. Sanjeev
Progress
Mr. Vishal

Mr. Manish Yadav completed

Mr. Ram mano


completed
Mr. Harendra

Mr. Ram mano


completed
Mr. Sanjeev

Mr. Sanjeev completed

Mr. V Misra
completed
Mr. Raman

Mr. Manish yadav


Completed
Mr. Vishal

Mr. Manish yadav Under


Mr. Vishal Progress

Mr Ram Mano Under


Mr. Vishal Progress

Mr. Mostkim
Mr. Raman completed
Mr. Sanjeev
Mr. Sathish
completed
Mr. Sanjeev

Mr. Sathish completed

Mr. Mostkim
Under
Mr. Suriya bali
Progress
Mr. Mohit

Mr. V Misra completed

Mr. Faizan completed

Mr Faizan
completed
Mr Raman

Mr Faizan Under
Mr Raman Progress

Mr Faizan

Mr. Manish Yadav Under


Mr. Vishal progress

Mr. Suriya bali


completed
Mr. Mohit
Mr. Suriya bali
completed
Mr. Mohit
Mr. Suriya bali
Mr. Mohit

Mr. Mostkim
Under
Mr. Raman
progress
Mr. Harendra

Mr. Faizan
completed
Mr. Raman
Mr. Faizan
completed
Mr. Raman

Mr. Harendra completed

Mr. Mostkim Rain


Under
Mr. Raman
Progress
Mr. Harendar

Mr. Mostkim Rain


Mr. Raman completed
Mr. Harendar

Mr.Suryabali singh
Under
Mr.Mohit
Progress
Mr.Sanjeev

Mr. Manish yadav Under


Mr. vishal Progress

Mr. Manish yadav Under


Mr. vishal Progress

Mr. Mostkim completed

Mr. Mostkim,
completed
1 Helper
Mr. Mostkim,
completed
1 Helper

Mr. Raman
completed
Mr. Harendra

Mr. Raman Under


Mr. Harendra progress
Mr. Maish Yadav
Mr. Sathish Under
Mr. Vishal progress
1 Helper

Mr. Maish Yadav


Under
Mr. Sathish
progress
Mr. Vishal

Under
Mr Faizan
progress

Mr Faizan

Mr Ram mano
Mr Manish C
completed
Mr Sanjeev

Mr Suriyabali
completed
Mr Mohit

Mr Suriyabali
Mr Mohit completed
Mr Sanjeev

Mr. Manish Yadav


Mr. sathish Under
Mr. Minu Progress
Mr. Vishal
Mr. Vishal completed

Mr Sathish
Mr Vishal completed
Mr Minu
Mr Sathish
Mr Vishal

Mr Manish Yadav
completed
Mr Raman

Mr R M Kushwa
completed
Mr Harendra

Mr R M Kushwa
completed
Mr Harendra

Mr Mostkim
Under
Mr minu
Progress
Mr Gautham
Mr Suriyabali
completed
Mr Mostkim

Mr Mostkim
completed

Mr Gautham completed

Mr Gautham completed