1. FUSE 16 Amp & 2 Amp Blow 1. Damage report has been submitted
2. Closing Coil Faulty to Rapid Rail.
3. Under Voltage Release Coil Faulty 2. Fuse purchased by Edinson but
1. Conduct troubleshoot for ACB Coupler A. pending other spare part.
2. Measure reading for all ACB Coupler A Coil. 3. Replacement Job for fuse Completed
1. Fuse (500 V- (Motorize, UVR, Shuntrip, Closing Coil). on 29/03/2022.
80kA/16A) 3. Reading of the measurement shows UVR and 4. Pending under voltage release coil
RR PIC : SYAHMI 2. Fuse (380V- Closing Coil faulty. and closing coil replacement parts.
DR-002 Farid WORK ORDER ID: Open LV MSB SRRS (SB) 100kA/ 2A) 4. To replace fuse 16A & 2A, Closing Coil and 07/03/2022
STN028-2022-618 3. Under Voltage UVR.
Release Coil
4. Closing oil
1. 4mm Cable (Red, Black, Green) Burnt 1. Damage report has been submitted
2. 1mm Cable (Red, Black, Green) Burnt to Rapid Rail.
1. Check Fuse F10 from Battery bank. 2. Item received from Rapid Rail on
2. Check voltage battery bank. Voltage drop 17/03/2022.
detected. (Total=87Cell) 3. Plan to replace cable on 29/03/2022
1. 4mm Cable (Red, 3. Check and found cable burn at battery bank. 4. Replacement Job Completed on
RR PIC : SYAHMI Black, Green) 4. To replace cable 4mm and 1mm. 29/03/2022.
Battery Charger &
DR-003 Farid WORK ORDER ID: Open LV SRRS (SB) 2. 1mm Cable (Red, 07/03/2022 5. Pending Closure Report to RR.
Battery Cell
STN028-2022-621 Black, Green) 6. Closure Report Submitted to RR.
3. Fuse F10 7. Job Complete.
Fibre Cable Defective Alarm Triggered due to 1. Damage report has been submitted
Faulty Fibre Patch Cord to Rapid Rail.
1. Retighten fibre patch cord cable connections 2. Received item from previous GF2
and carried out vissual inspection. panel on 27/03/2022.
2. Temperory used other fibre patch cord cable 3. Plan to replace Fibre Optic Patch Cord
and alarm disapppear. on 03/04/2022.
RR PIC : SYAHMI Fibre Patchcord 3. Require to change with new ST-SC Single 4. Replacement Job Completed on
DR-006 Hilman WORK ORDER ID: Open 33kV GIS KWDS(SB) Cable (ST-SC Mode Fibre Optic Patch Cord. 10/03/2022 03/04/2022.
STN004-2022-830 Connector) 5. Pending Closure Report to RR.
6. Closure Report Submitted to RR. Job
Complete.
DPM Meter Display for Genset Unclear Visual. 1. Damage report has been submitted
1. Visual Checking to Rapid Rail.
RR PIC : SYAHMI 2. DPM can only display current value. 2. Pending replacement parts.
DR-007 Munzir WORK ORDER ID: Open Genset Genset KL Sentral Linkway ENTES DPM Meter 3. To replace with new DPM Meter. 13/03/2022
KLSLINKWAY-2022-4
Surge Diverter (Blue Phase) Faulty 1. Damage report has been submitted
1. Conduct visual inspection. to Rapid Rail. 2. Item received from
2. Measure Voltage input. Voltage OK. Rapid Rail on 16/03/2022. 3. Plan to
3. Item suspected faulty based on voltage input replace SPD on 22/03/2022. 4.
Novaris MULTIMOV is normal. Replacement Job Completed on
RR PIC : DZAHIR
Surge Diverters 4. To replace new Surge Diverter due to no 22/03/2022. 5. Pending Closure Report
DR-008 Hilman WORK ORDER ID: Close LV MSB ESC03(NB & SB) 08/03/2022
(SD1-150-275-N ) protection against lightning surge for blue to RR. 6. Closure Report Submitted to
ES03-2022-193
Blue Phase phase. RR. Job Complete.
Step Down Transformer Overheat & Burnt 1. Damage report has been submitted
1. Isolate MCB AC supply to TX. to Rapid Rail.
2. Temporarily used DC Supply. 2. Pending replacement parts.
3. Require to replace with new step down 3. Item Received from Rapid Rail on
transformer. 23/05/2022.
RR PIC : SYAHMI 4. Replacement Job Completed on
Step Down 28/05/2022.
DR-013 Munzir WORK ORDER ID: Open LV Battery Charger SUBS(NB) 05/04/2022
Transformer 5. Pending Closure Report to RR.
STN001-2022-703
6. Closure Report Submitted to RR.
7. Job Complete.
Temperatore Controller for Transformer Faulty 1. Damage report has been submitted
1. The meter readings remain unchanged after to Rapid Rail.
swapping the cable connections 2. Pending replacement parts.
between R-phase and S-phase. 3. Plan to replace Timer Relay on
- Reading before swapped 03/06/2022.
R =72.3°C 4. Replacement Job Completed on
S =43.7°C 03/06/2022.
T =41.3°C 5. Closure Report Submitted to RR.
- Reading after swapped 6. Job Complete.
R =74.4°C
S =41.9°C
T =41.1°C
RR PIC : DZAHIR Digital Temperatore 2. Retighten the cable connections and did a
DR-018 Hilman WORK ORDER ID: Open TPSS Rectifier Trasformer BUBS(NB) Controller Display visual check. 21/04/2022
STN018A-2022-896 (DK P-300C) 3. Swapped cable connections between R-
phase and S-phase
4. Currently, the temperatore controller reading
for R-phase is inaccurate and is require to
replace.
Surge Diverter (Blue Phase) Faulty 1. Damage report has been submitted
1. The CE inspector highlights that SPD`s display to Rapid Rail.
inside cubicle 2 is blinking. 2. Pending replacement parts.
2. Did a visual inspection and retightened the
cable connections.
3. Measured the voltage across each phase on
Novaris MULTIMOV the SPD. (R=243.8v, Y=243.3v,
RR PIC : SYAHMI
Surge Diverters S=243.2v)
DR-019 Hilman WORK ORDER ID: Open LV MSB BUBS(SB) 4. The voltages are available. 11/05/2022
(SD1-150-275)
STN018A-2022-907 5. There is no surge protection on Y-Phase for
Yellow Phase
MSB incomer.
6. Require to replace SPD.
One Battery Cell Faulty 1. Damage report has been submitted
1. Check internal resistance and voltage battery to Rapid Rail.
in each cell. 2. Pending replacement parts.
2. Found one cell faulty (Cell 87). V = 0 VDC 3. Item Received from Rapid Rail.
RR PIC : DZAHIR 3. Temporary isolate supply from battery bank 4. Plan to replace battery cell on
Fukuda (Nickel to load. (no redundancy for 110 VDC) 24/06/2022.
DR-020 Munzir WORK ORDER ID: Open LV Battery Charger IVS2(NB) 11/05/2022
Cadmium Battery) 4. Require to replace one unit of new battery 5. Closure Report Submitted to RR.
IVS02-2022-204
cell. 6. Job Complete.
DEG01 BAE CBI2410A Battery Charger Module 1. Damage report has been submitted
Faulty to Rapid Rail.
1. Check and retighten cable for outgoing MCB 2. Pending replacement parts.
(DG control battery 3) at ACDB panel 3. Plan to replace Timer Relay on
2.Check and found battery voltage drop during 28/05/2022.
troubleshoot 4. Replacement Job Completed on
RR PIC : AHMAD BAE CBI2410A Reading of voltage drop: 10.18 Vdc 03/05/2022.
DR-021 farid WORK ORDER ID: Open Genset Battery Charger SEMP(A) Recharge and 3. Due to low battery voltage, the generator 13/05/2022 5. Closure Report Submitted to RR.
POR001-2022-661 Continuity Module (DEG1) unable to operate. 6. Job Complete.
4. Require to replace one unit of BAE CBI2410A
battery charger module.
ACB CHINT NA1-2000 Faulty Due to Damage 1. Damage report has been submitted
Parts to Rapid Rail.
1. Air Circuit Breaker (ACB) incomer A cannot 2. Pending replacement parts.
closed by Auto or Manual mode.
2. LV supply SB backup by coupler.
3. Inspect and find mechanism part broken
inside the ACB frame.
RR PIC :IQBAL 4. ACB incomer A cannot be close on position
ACB CHINT NA1- by auto & manual operation.
DR-022 farid WORK ORDER ID: Open LV MSB BAUS(SB) 13/05/2022
2000 5. If supply incomer B fails, station will totally
STN009-2022-618
blackout on LV side.
6. Require to replace new ACB Immediately.
GPP 12170 Battery Lifetime Drop 1. Damage report has been submitted
1. UPS battery faulty for genset panel (Bus-Tie 2 to Rapid Rail.
incoming). 2. Pending replacement parts.
2. UPS module show (Alert state: replace 3. Item Received from Rapid Rail.
battery) . 4. Plan to replace battery on
3. Check and reset the alarm but indicator 17/06/2022.
alarm still appear at UPS module. 4. Replacement Job Completed on
RR PIC : SYAHMI 4. Battery voltage reading (measured): 17/06/2022.
DR-023 farid WORK ORDER ID: Open Genset Genset Bustie SEMP(B) GPP 12170 Battery 26.75Vdc. 18/05/2022 5. Closure Report Submitted to RR.
POR001-2022-662 5. Battery lifetime drop to only 25 minutes and 6. Job Complete.
8 seconds.
6. Require to replace 2 unit of GPP 12170
Battery.
CHINT Under Voltage Release Faulty 1. Damage report has been submitted
1. Checked and retightened cable connections. to Rapid Rail.
2. ACB for Incomer B cannot auto trip when 2. Pending replacement parts.
RR PIC : IQBAL under-voltage occurs.
CHINT Under 3. Require to replace under voltage release.
DR-026 Hilman WORK ORDER ID: Open LV MSB TCOS(SB) 09/06/2022
Voltage Release
STN026-2022-859
Fukuda (Nickel Cadmium Battery) KAP 2 1. Damage report has been submitted
Bloated to Rapid Rail.
1. Found that battery cell inflatable during 2. Pending replacement parts.
visual inspection (preventive maintenance). 3. Item Received from Rapid Rail.
2. Take reading at inflatable battery cell. 4. Plan to replace OCEF Relay on
RR PIC : QAHHAR Fukuda (Nickel Voltage drop to 0.92 Vdc. 20/06/2022.
DR-027 Farid WORK ORDER ID: Open LV Battery Charger KWDS(SB) Cadmium Battery) 3. Require to replace one new Fukuda (Nickel 10/06/2022 5. Replacement Job Completed on
STN004-2022-946 KAP 2 Cadmium Battery) KAP 2 20/06/2022.
6. Closure Report Submitted to RR.
7. Job Complete.
Schneider Digital Power Meter (Easy Logic PM 1. Damage report has been submitted
1200) Faulty to Rapid Rail.
1. Checked and retightened the cable 2. Pending replacement parts.
connections.
2. Measured the input voltage of the meter
RR PIC : FARHAN Schneider Digital (243.7 VAC).
DR-029 Hilman WORK ORDER ID: Open LV MSB KWSS(SB) Power Meter (Easy 3. DPM Meter display does not show any value. 15/06/2022
STN005-2022-843 Logic PM 1200) 4. Require to replace Schneider Digital Power
Meter (Easy Logic PM 1200)
BAE CBI2410A Recharge and Continuity 1. Damage report has been submitted
Module Faulty to Rapid Rail.
1. The battery charger panel (DEG4) shows 2. Pending replacement parts.
indicator of battery charger fail. 3. Item Received from Rapid Rail.
2. Check the voltage reading at Recharge and 4. Plan to replace OCEF Relay on
Continuity Module. There is no reading 22/06/2022.
at the output voltage. Voltage reading = 0.64 V 5. Replacement Job Completed on
3. Use portable charger as temporary action to 22/06/2022.
avoid battery voltage drop. 6. Closure Report Submitted to RR.
RR PIC : IQBAL BAE CBI2410A 4. Unable to start genset in fully auto mode. 7. Job Complete.
DR-030 Farid WORK ORDER ID: Open Genset Battery Charger SEMP(B) Recharge and 5. Require to replace one unit of BAE CBI2410A 17/06/2022
POR001-2022-688 Continuity Module battery charger module.
FUKUDA Nickel Cadmium (KAP1) Faulty 1. Damage report has been submitted
1. Measure voltage for each battery. to Rapid Rail.
RR PIC : SYAHMI 2. Found one battery faulty (0.59 Vdc) 2. Pending replacement parts.
FUKUDA Nickel
DR-031 Hilman WORK ORDER ID: Open LV Battery Charger SUJS(SB) 3. Require to replace one new FUKUDA Kap 1 25/06/2022
Cadmium (KAP1)
STN033-2022-856 battery cell.
1. CHINT Under Voltage Release Faulty 1. Damage report has been submitted
2. CHINT Under Voltage Coil Faulty to Rapid Rail.
1. ACB Incomer B cannot auto close. 2. Pending replacement parts.
1. CHINT Under 2. Found under voltage coil and under voltage
RR PIC : QAHHAR
Voltage Release release faulty.
DR-032 Munzir WORK ORDER ID: Open LV MSB SEMP(NB) 24/06/2022
2. CHINT Under
STN014-2022-632
Voltage Coil
Closing Block Magnet with Rectifier TR1 Faulty 1. Damage report has been submitted
1. Troubleshoot Panel HB2 due to breaker to Rapid Rail.
cannot closed. 2. Pending replacement parts.
2. Found that closing lock magnet with rectifier
TR1 at panel HB2 faulty.
RR PIC : FARHAN Closing Block 3. Temporary swap closing block magnet at
DR-033 Farid WORK ORDER ID: Open 33kV GIS SSU SEMP Magnet with Panel HB4 (Spare Feeder). 13/07/2022
POR001-2022-720 Rectifier TR1 4. Require to replace one unit of closing block
magnet.