ELECTRICAL ITEMS Builings(Part-III) SoR 2022-23

SL. Scheduled
ITEM CODE DESCRIPTION OF ITEM Unit
NO. Rate
1523 a 4 Way SPN DB 1 No 48.00
1524 b 8 Way SPN DB 1 No 97.00
1525 c 12 Way SPN DB 1 No 145.00
1526 d 4 Way TPN DB 1 No 145.00
1527 e 8 Way TPN DB 1 No 290.00
1528 f 12 Way TPN DB 1 No 436.00
4 Way VTPN DB with MCCBs / MCB
1529 g 1 No 242.00
Circuits
8 Way VTPN DB with MCCBs / MCB
1530 h 1 No 363.00
Circuits
12 Way VTPN DB with MCCBs / MCB
1531 i 1 No 484.00
Circuits
SERVICING OF HT VCBs
Carryout routine maintenance, servicing
and testing of 630A to 3000A HT VCB by
cleaning fixed contacts, moving contacts
and arcchutes including servicing and
1532 ELEC-7.15.17 putting the VCB in perfect working 1 No 9900.00
condition after detting all relay and ON,
OFF mechanism etc done with only
manufacturing companies / Authorised
dealers of respective switch gears
POWER QUALITY ANALYSIS
Carrying out power quality analysis of the
existing load at point of supply/ or as
directed with the use of necessary
equipment ( At 10 points) and recording
1533 ELEC-7.15.18 1 day 28600.00
voltage, current, frequency, KW, KVA,
KVAR,PF,THDV, THDI, Load imbalance,
preparation and submission of detailed
analysis report with remedial measure.
Note 1: Above job is carriedout
irrespective of measuremnts at various
electrical panels/ load centers (Upto 10
pts)
Note 2: For estimating, one day shall be
considered number of hours of one
normal working day and it should be
actual time required for measurement at
site.
THERMOGRAPHY
Service Charges towards Thermography at
site with FLIR make E5 thermal Imaging
1534 7.15.19 Camera with CRIP Resolution of 10,800- 1 Job 38500.00
pixel detector and 2% accuracy including
all required jobs
7.16 TRANSFORMERS
Supply and Transportation of ------ KVA
TRANSFORMER with all test reports. The
Transformer shall be designed and
manufactured as per IS:1180 OCTC with
ELEC-7.16.1 level - I with initial filling of oil as per IS
335-1993. The basic details of the
Transformer are as under.
Makes: Kirloskar / PETE / Esennar /
Voltamp / Crompton / ABB / Schneider.

Page 304 of 467


ELECTRICAL ITEMS Builings(Part-III) SoR 2022-23

SL. Scheduled
ITEM CODE DESCRIPTION OF ITEM Unit
NO. Rate
1. Quantity : 1
2. Rated KVA : ........KVA
3. Service & Location: Continuous
Outdoor Distribution Transformer
4. Mounting : Plinth.
5. Wound : Copper Double wound
6. Type : Core type oil immersed
7. Cooling : ONAN
8. Temp Rise : 40⁰C in oil, 45⁰C by
resistance
9. Vector Group: Dyn 11
10. Primary Connection : Delta
11. Nominal Voltage / Current : ______
12. Highest system Voltage: 12000V
13. Primary Frequency :50 HZ +/- 3%
14. Number of Phases : 3
15. Primary wires: 3
16. Secondary connection : Star
17. Secondary Volts / Current : 433V
18. Secondary phases : 3
19. Secondary wires: 4
20. Taps on primary winding for primary
voltage variation : +5% to - 10% in steps
of 2.5% of 7 position (6 Steps)

21. Terminal arrangement. a.HV: HT


terminal box as per the site condition.
b. LV: Cable box suitable to receive -------
-----Sq.mm XLPE cable22. LV:One
separate terminal for earthing.23. Total
Losses at 50% Loading [Watts] [Max] --- as
per IS24. Total Losses at 100% Loading
[Watts] [Max]--- as per IS25.Percentage
Impedance at 75 deg. C at ----- as per
IS26. No Load current: Less than 2% of
full load current.
27. Standrad Fittings & Accessories.
a. Rating and terminal marking plate:
One
b. Lifting Lugs:Two
c. Off-circuit tap switch :One
d. Earthing Terminals :Two
e. Radiators ( Attachable)
:Adequate
f. Explosion vent with Diaphragm :One
g. Conservator with Drain plug:one
h. Oil filling hole with cap :One
i. Oil level indicator : One
j. Dehydrating Silicagel Breather : One
k. Terminal Arrangement: HV With
Treminal Box
l. Terminal Arrangement : LV Cable Box
m. Separate Neutral Bushing : One
n. Filter valve with blanking plate : One
o. Drain cum filter valve with blanking
plate : One
p. Air release device : One

Page 305 of 467


ELECTRICAL ITEMS Builings(Part-III) SoR 2022-23

SL. Scheduled
ITEM CODE DESCRIPTION OF ITEM Unit
NO. Rate
q. Thermometer Pocket : One
r. Four :Unidirectional flat rollers
s. One :10Cm dial thermometer(Rigid
stem type)
1535 a 160 KVA Copper Wound Transformer 1 No 776160.00
1536 b 200 KVA Copper Wound Transformer 1 No 847107.00
1537 c 250 KVA Copper Wound Transformer 1 No 873180.00
1164240.0
1538 d 315 KVA Copper Wound Transformer 1 No
0
1428620.0
1539 e 400 KVA Copper Wound Transformer 1 No
0
1502598.0
1540 f 500 KVA Copper Wound Transformer 1 No
0
1671898.0
1541 g 630 KVA Copper Wound Transformer 1 No
0
2010254.0
1542 h 1000 KVA Copper Wound Transformer 1 No
0
2272500.0
1543 i 1250 KVA Copper Wound Transformer 1 No
0
3245000.0
1544 j 1600 KVA Copper Wound Transformer 1 No
0
4077600.0
1545 k 2000 KVA Copper Wound Transformer 1 No
0
Supply and Transportation of ------ KVA
TRANSFORMER with all test reports. The
Transformer shall be designed and
manufactured as per IS:1180 OCTC with
ELEC-7.16.2 level - I with initial filling of oil as per IS
335-1993. The basic details of the
Transformer are as under.
Makes: Thota / Power Tech or equivalent

1. Quantity : 1
2. Rated KVA : ........KVA
3. Service & Location: Continuous
Outdoor Distribution Transformer
4. Mounting : Plinth.
5. Wound : Copper Double wound
6. Type : Core type oil immersed
7. Cooling : ONAN
8. Temp Rise : 40⁰C in oil, 45⁰C by
resistance
9. Vector Group: Dyn 11
10. Primary Connection : Delta
11. Nominal Voltage / Current : ______
12. Highest system Voltage: 12000V
13. Primary Frequency :50 HZ +/- 3%
14. Number of Phases : 3
15. Primary wires: 3
16. Secondary connection : Star
17. Secondary Volts / Current : 433V
18. Secondary phases : 3
19. Secondary wires: 4
20. Taps on primary winding for primary
voltage variation : +5% to - 10% in steps

Page 306 of 467


ELECTRICAL ITEMS Builings(Part-III) SoR 2022-23

SL. Scheduled
ITEM CODE DESCRIPTION OF ITEM Unit
NO. Rate
of 2.5% of 7 position (6 Steps)

21. Terminal arrangement.


a.HV: HT terminal box as per the site
condition.
b. LV: Cable box suitable to receive --
----------Sq.mm XLPE cable
22. LV:One separate terminal for
earthing.
23. Total Losses at 50% Loading [Watts]
[Max] --- as per IS
24. Total Losses at 100% Loading [Watts]
[Max]--- as per IS
25.Percentage Impedance at 75 deg. C at
----- as per IS
26. No Load current: Less than 2% of full
load current.
27. Standrad Fittings & Accessories.
a. Rating and terminal marking plate:
One b. Lifting Lugs:Two c. Off-
circuit tap switch :One d. Earthing
Terminals :Two
e. Radiators ( Attachable)
:Adequate f. Explosion
vent with Diaphragm :One
g. Conservator with Drain plug:one h.
Oil filling hole with cap :One i. Oil
level indicator : One j. Dehydrating
Silicagel Breather : One k. Terminal
Arrangement: HV With Treminal Box
l. Terminal Arrangement : LV Cable Box
m. Separate Neutral Bushing : One n.
Filter valve with blanking plate : One
o. Drain cum filter valve with blanking
plate : One p. Air release
device : One q. Thermometer
Pocket : One r. Four :Unidirectional
flat rollers s. One :10Cm dial
thermometer(Rigid stem type)
1546 a 100 KVA Copper Wound Transformer 1 No 378900.00
1547 a 160 KVA Copper Wound Transformer 1 No 606375.00
1548 b 200 KVA Copper Wound Transformer 1 No 667013.00
1549 c 250 KVA Copper Wound Transformer 1 No 727650.00
Supply and Transportation of 3 Phase, 50
Hz, Dry type, Indoor type copper wound
Transformer designed and manufactured
as per IS 2026-1977 and IS 11171-1985,
connected delta on primary side and Star
on secondary side with additional neutral
ELEC-7.16.3 brought out on load side, 11000V /
(433V / 415V) with HV off load tap
changing + 5% to -5% in steps of 2.5%,
temporature rise by the resistance
90⁰C complete with test reports with
the following standard mountings.
Makes: Kirloskar / PETE / Esennar /

Page 307 of 467


ELECTRICAL ITEMS Builings(Part-III) SoR 2022-23

SL. Scheduled
ITEM CODE DESCRIPTION OF ITEM Unit
NO. Rate
Voltamp / Crompton / ABB / Schneider.
1. Rated KVA : ........KVA (Cast Resin)
2. Service: Indoor
3. Mounting : Floor.
4. Copper wound : Double.
5. Type of cooling : ANAN.
6. Insulation Class : Class F
7. Temparature rise by resistance : 90⁰C
8. Vector Group: Dyn 11
9. Primary Connection : Delta10. Primary
Volts : 1100011. Primry Frequency :
5012.Primary Phases : 313. Primary
wires: 314. Secondary connection :
Star15. Secondary Volts : 433V /
415V16. Secondary phases : 317.
Secondary wires: 418. Taps on
primary winding for primary voltage
variation :+5.0% to - 10.0% in steps of
2.5% through links.
19. Terminal arrangement.
a. HV: Cable end box b. LV : Cable end
box
20. No load losses (Watts): ........... As
per IS specifications
21. Load losses (Watts): ..............As per
IS specifications
22. Impedance(Z%) : ............As per
IS specifications
23. Fittings & Accessories.
a. Rating and terminal marking plate b.
Earthing terminals
c. Lifting Lugs
d. Winding temporature Indicator
e. Seperate neutral bushing
f. Uni directional flat rollers.
250 KVA Copper Wound Cast Resin 1218815.0
1550 a 1 No
Transformer 0
315 KVA Copper Wound Cast Resin 1540800.0
1551 b 1 No
Transformer 0
400 KVA Copper Wound Cast Resin 1920269.0
1552 c 1 No
Transformer 0
500 KVA Copper Wound Cast Resin 2126558.0
1553 d 1 No
Transformer 0
630 KVA Copper Wound Cast Resin 2440660.0
1554 e 1 No
Transformer 0
750 KVA Copper Wound Cast Resin 2701401.0
1555 f 1 No
Transformer 0
1000 KVA Copper Wound Cast Resin 2886345.0
1556 g 1 No
Transformer 0
1250 KVA Copper Wound Cast Resin 3525000.0
1557 h 1 No
Transformer 0
1600 KVA Copper Wound Cast Resin 4340330.0
1558 i 1 No
Transformer 0
2000 KVA Copper Wound Cast Resin 5344758.0
1559 j 1 No
Transformer 0
1560 ELEC-7.16.4 Supply, Installation, Testing and 1 No 652800.00

Page 308 of 467


ELECTRICAL ITEMS Builings(Part-III) SoR 2022-23

SL. Scheduled
ITEM CODE DESCRIPTION OF ITEM Unit
NO. Rate
Commissioning of OLTC for transformers
with RTCC etc., complete.
NOTE 1 : All Test reports to be submitted
NOTE 2. 2% may be added on the above
price towards Installation, Testing and
Commissioning
NOTE 3 : If level 2 transformer is to be
supplied then increase the price by 10%
Supply , Fabrication, Transportation and
fixing of Box type RS Joist pole made
with 2 Nos 175X85 mm ( ISMB Modified )
or equivalent about 30'-0 length / 9.1
mtrs length poles welded together
including excavation of pit, coil earthing,
Special T&P, painting of Pole with 1 coat
of Red oxide and 2 coats of alluminium
1561 ELEC-7.16.5 1 No 87846.00
paint, CC 1:3:6 upto ground and 1:2:4 for
Couping work, 200A AB Switch, HG fuse
sets, required angle iron channels,
clamps, nuts and bolts, 11KV pin
insulators, 2Nos GI pipe earthings as per
the IS with brick massonry chamber
including labour and transportation
charges etc., complete.
Supply, Fabrication, Transportation and
erection of DP structure made with 2 Nos
175mm x 85mm ( ISMB Modified ) or
equivalent about 30'-0 length / 9.1 mtrs
length RS joist pole erection of the same
Including excavation of pit in all kinds of
1562 ELEC-7.16.6 soil including breaking stones, concreting 1 No 153731.00
with (1:3:6) mixture base plate, coil
earthing back filling, 1:2:4 for couping
including red oxide primary painting and
two coats of aluminium painting etc.,
complete as required with following as
per CEIG norms.
a). 400A AB Switch-1No
b) HG Fuse sets-1No
c). LAS-1set.
d) Required Number of 11KV pin and disc
insulatiors.
e) Required length of 100X50mm and
75X40 mm ISMC chanell iron including two
coats of redoxide and two coats of enamil
paint ect for finished item of work.
f) 11KV pin insulators and disc insulators.
g) AB switch operating pipe with handle
and lock and key arrangements.
h). "0" SWG or 8.25 mm dia hard drawn
bare copper wire including copper binding
wire etc., complete as required including
connections.
i) 40X6mm GI strip for the DP structure
earthing.
j) 25X6mm copper strip for lightning