Professional Documents
Culture Documents
WORK PERMIT
DATE TASK DESCRIPTION LOCATION DURATION REMARKS
NO.
• De-Energize MSB A (SB) to conduct
contactor step 8 replacement.
• Normalize back MSB A after complete.
MCCB AND Contactor Step 8 • De-Energize MSB B (NB) to conduct MCCB
EP-23-1272-1 15/04/2023 BAUS 0000Hrs-0400Hrs
Replacement replacement.
• Normalize back MSB B after complete.
• ATS will change over to another source
during this work
EP-23-1271-1 15/04/2023 Earthing & Lightning (Viaduct) MALS - MALP 0000Hrs-0400Hrs • Require access to viaduct.
EP-23-1269-1 16/04/2023 Earthing & Lightning (Viaduct) TAPS - TMIS 0000Hrs-0400Hrs • Require access to viaduct.