This document provides a weekly list of maintenance activities taking place from May 20-26, 2023 across various EPSB locations. It includes 17 work permits and emergency permits for tasks like preventative maintenance, equipment replacement, testing, inspection, and fiber cable work. Most work is scheduled overnight and on weekends to minimize operational impacts, though some work requires temporarily switching power sources or de-energizing equipment. Safety measures like ensuring access to viaduct areas are also noted.
This document provides a weekly list of maintenance activities taking place from May 20-26, 2023 across various EPSB locations. It includes 17 work permits and emergency permits for tasks like preventative maintenance, equipment replacement, testing, inspection, and fiber cable work. Most work is scheduled overnight and on weekends to minimize operational impacts, though some work requires temporarily switching power sources or de-energizing equipment. Safety measures like ensuring access to viaduct areas are also noted.
This document provides a weekly list of maintenance activities taking place from May 20-26, 2023 across various EPSB locations. It includes 17 work permits and emergency permits for tasks like preventative maintenance, equipment replacement, testing, inspection, and fiber cable work. Most work is scheduled overnight and on weekends to minimize operational impacts, though some work requires temporarily switching power sources or de-energizing equipment. Safety measures like ensuring access to viaduct areas are also noted.
EPSB WEEKLY LIST OF ACTIVITY (20/05/2023-26/05/2023)
WORK PERMIT ISSUE DATE TASK DESCRIPTION LOCATION DURATION REMARKS
WP-23-0568 PREVENTIVE MAINTENANCE BAUS SB 1900hrs-0000hrs - No impact to operation. WP-23-0568 PREVENTIVE MAINTENANCE SUJS SB 0700hrs-1300hrs - No impact to operation. - Interruption possibility EP-23-1758-1 CAPACITOR BANK CONTACTOR REPLACEMENT TTDS NB 0000Hrs-0400Hrs 20/05/2023 during replacement work. EP-23-1678-1 EARTHING & LIGHTNING (VIADUCT) SRRS - BTHS 0000Hrs-0400Hrs - Require access to viaduct. WP-23-0568 ONLINE PD MAPPING SRRS 0000Hrs-2359Hrs - No impact to operation. WP-23-0568 PREVENTIVE MAINTENANCE TTDS NB 1900hrs-0000hrs - No impact to operation. WP-23-0568 PREVENTIVE MAINTENANCE STKS NB 0700hrs-1300hrs - No impact to operation. ON-LOAD TEST MOBILE GENSET FOR 1000KVA - Required to De-Energize EP-23-1672-1 BTHS 0000Hrs-0400Hrs 21/05/2023 GENERATOR Both Bound EP-23-1677-1 EARTHING & LIGHTNING (VIADUCT) BTHS - BSCS 0000Hrs-0400Hrs - Require access to viaduct. WP-23-0568 ONLINE PD MAPPING BTHS 0000Hrs-2359Hrs - No impact to operation. WP-23-0568 PREVENTIVE MAINTENANCE TTDS SB 1900hrs-0000hrs - No impact to operation. WP-23-0568 PREVENTIVE MAINTENANCE STKS SB 0700hrs-1300hrs - No impact to operation. 22/05/2023 EP-23-1676-1 EARTHING & LIGHTNING (VIADUCT) MERS - BUBS 0000Hrs-0400Hrs - Require access to viaduct. WP-23-0568 ONLINE PD MAPPING MERS 0000Hrs-2359Hrs - No impact to operation. WP-23-0568 PREVENTIVE MAINTENANCE PHDS NB 1900hrs-0000hrs - No impact to operation. WP-23-0568 PREVENTIVE MAINTENANCE KAJS NB 0700hrs-1300hrs - No impact to operation. WP-23-0566 COMPETENT ENGINEER INSPECTION (INCLUDING SUBS - SEMS 0700hrs-1900hrs - No impact to operation. PYWP-23-1569 DEPOT) WP-23-0568 ONLINE PD MAPPING PHDS 0700Hrs-0400Hrs - No impact to operation. EP-23-1757-1 FIBRE CABLE REPLACEMENT KWDS & KWDF 0000Hrs-0400Hrs - No impact to operation. PYWP-23-1803 - De-Energize MSB B for replacement of UVR. 23/05/2023 - Normalize back MSB B after complete. EP-23-1759-1 UNDER VOLTAGE RELEASE (UVR) REPLACEMENT BAUS NB 0000Hrs-0400Hrs - ATS will change over to another source during this work. - There will be a glitch during ATS changeover. EP-23-1675-1 EARTHING & LIGHTNING (VIADUCT) BSCS - BDUS 0000Hrs-0400Hrs - Require access to viaduct.
WP-23-0568 PREVENTIVE MAINTENANCE PHDS SB 1900hrs-0000hrs - No impact to operation.
WP-23-0568 PREVENTIVE MAINTENANCE KAJS SB 0700hrs-1300hrs - No impact to operation. COMPETENT ENGINEER INSPECTION (INCLUDING WP-23-0566 SEMP - KAJS 0700hrs-1900hrs - No impact to operation. DEPOT) WP-23-0568 ONLINE PD MAPPING BDUS 0700Hrs-0400Hrs - No impact to operation. - No impact to operation. - EPSB will standby manpower PYWP-23-1803 24/05/2023 33kV & LV RELAY RECALIBRATION KWDF 0000Hrs-0400Hrs at in-between station and at the relay recalibration work station. EP-23-1674-1 EARTHING & LIGHTNING (VIADUCT) BDUS - SUJS - KAJD 0000Hrs-0400Hrs - Require access to viaduct.
- Interruption possibility for all
EP-23-1671-1 PM BATTERY CHARGER SUBD INFRA & RSMO 0000Hrs-0400Hrs connected load to battery charger. WP-23-0568 PREVENTIVE MAINTENANCE PBDS NB 1900hrs-0000hrs - No impact to operation. WP-23-0568 PREVENTIVE MAINTENANCE KAJD DCR 0700hrs-1300hrs - No impact to operation. WP-23-0682 FIBRE CABLE REPLACEMENT BUBS SB 0000Hrs-0400Hrs - No impact to operation. - De-Energize AT2 for replacement of Temperature Controller. - Normalize back AT2 after REPLACEMENT OF TEMPERATURE CONTROLLER AT complete. EP-23-1756-1 25/05/2023 KAJD DCR 0000Hrs-0400Hrs AT2 - ATS will change over to another source during this work. - There will be a glitch during ATS changeover. EP-23-1673-1 EARTHING & LIGHTNING (VIADUCT) SUJS - STKS 0000Hrs-0400Hrs - Require access to viaduct. WP-23-0568 ONLINE PD MAPPING SUJS & KAJD 0700Hrs-0400Hrs - No impact to operation. WORK PERMIT ISSUE DATE TASK DESCRIPTION LOCATION DURATION REMARKS WP-23-0568 PREVENTIVE MAINTENANCE PBDS SB 1900hrs-0000hrs - No impact to operation. WP-23-0568 PREVENTIVE MAINTENANCE KAJD INFRA & RSMO 0700hrs-1300hrs - No impact to operation. ONLINE PD MAPPING KWDS 0700Hrs-2359Hrs - No impact to operation. - De-Energize RT2 for replacement of Temperature EP-23-1754-1 REPLACEMENT OF TEMPERATURE CONTROLLER AT RT2 KDAS NB 0000Hrs-0400Hrs Controller. 26/05/2023 - Normalize back RT2 after complete. - Change selector to out of service before replacement EP-23-1755-1 BBHI RELAY REPLCEMENT TMUS SB 0000Hrs-0400Hrs work. - No impact to operation.