LOCATION : OMAN
REVISION NUMBER : 1
Page 1 of 3
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
110V DC LOAD CALCULATION - (SS01A-MCC-602)
Load
LOAD
Operating (Tripping) Load at Continuous (Closing) Load at
No. of in
S. No. DESCRIPTION Units per Beginning of Load cycle load End of Load cycle REMARKS
panels Watts
Panel (First 1 Minute) (Next 58 Min) (Last 1 Minute)
(Each)
(Watts) (Watts) (Watts)
TRANSFORMER INCOMERS - 5000A 2
1 Protection Relay (IED) Other Protection 1 2 12 24 24 24
2 Protection Relay (IED) 64 REF 1 2 12 24 24 24
3 ACB Tripping Coil 2 2 450 1800 Tripping Coil Operating time (35mS)
4 ACB Closing Coil 1 2 450 900 Closing Coil Operating time (40mS)
5 ACB Spring charging motor 1 2 250 500 Spring charge motor operating time (5 sec)
6 Lockout relay (86) 2 2 47 188
7 Trip relay (94) 1 2 18 36
8 Arcon 2 2 20 80
9 Trip circuit supervision relay (74) 2 2 18 72 72 72
10 Miscellaneous Load (Aux. Relays +Aux. Contactor etc) 1 2 60 120 120 120
11 Indicating lamps 12 2 0.26 6.24 6.24 6.24
12 Multifunction Meter 1 2 8 16 16 16
Page 2 of 3
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
110V DC LOAD CALCULATION - (SS01A-MCC-602)
Load
LOAD
Operating (Tripping) Load at Continuous (Closing) Load at
No. of in
S. No. DESCRIPTION Units per Beginning of Load cycle load End of Load cycle REMARKS
panels Watts
Panel (First 1 Minute) (Next 58 Min) (Last 1 Minute)
(Each)
(Watts) (Watts) (Watts)
OUTGOINGs 5
1 Protection Relay (IED) Other Protection 1 5 12 60 60 60
2 Lockout relay (86) 1 5 47 235
3 ACB Tripping Coil 2 5 540 5400 Tripping Coil Operating time (35mS)
4 ACB Closing Coil 1 5 540 2700 Closing Coil Operating time (35mS)
5 ACB Spring charging motor 1 5 275 1375 Spring charge motor operating time (3 sec)
6 Trip circuit supervision relay (74) 2 5 18 180 180 180
7 Indicating lamps 8 5 0.26 10.4 10.4 10.4
Page 3 of 3
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
240V AC HEATER LOAD CALCULATION - (SS01A-MCC-602)
LOCATION : OMAN
REVISION NUMBER : 1
Page 1 of 2
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
240V AC HEATER LOAD CALCULATION - (SS01A-MCC-602)
S. No. DESCRIPTION Total LOAD in Total LOAD in Watts REMARKS
Watts
NOTES:
1. 60W is considered for Panel Heater Circuit.
2. 300W is considered for Motor Space Heater Circuit.
Page 2 of 2
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
240V AC CONTROL TRF. CALCULATION - (SS01A-MCC-602)
LOCATION : OMAN
REVISION NUMBER : 1
Page 1 of 3
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
240V AC CONTROL TRF. CALCULATION - (SS01A-MCC-602)
S. No. DESCRIPTION Total in LOAD in Total LOAD in Watts Total LOAD REMARKS
Bus-A Watts in kVA
S. No. DESCRIPTION Total in LOAD in Total LOAD in Watts Total LOAD REMARKS
Bus-B Watts in kVA
Page 2 of 3
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
240V AC CONTROL TRF. CALCULATION - (SS01A-MCC-602)
Page 3 of 3