RAS MARKAZ CRUDE OIL PARK PROJECT

SS01A-MCC-602 AUXILIARY POWER REQUIREMENT DATA (AC & DC)

Doc No 9686-6120-DB-PO0079-0004 Rev. 01 Doc. Class 2

RAS MARKAZ CRUDE OIL PARK

SS01A-MCC-602 AUXILIARY POWER


REQUIREMENT DATA (AC & DC)

01 11.01.2023 9 Issued for Information KR SRINUBABU NELSON


B1 10.02.2021 8 Issued for Approval KR SRINUBABU NELSON
A1 24.12.2020 6 Issued for Review / Comments KR SRINUBABU NELSON
REV DATE PAGES DESCRIPTION PP /CHK /APP
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
110V DC LOAD CALCULATION - (SS01A-MCC-602)

DOCUMENT TITLE : 110V DC LOAD CALCULATION

CLIENT : OMAN TANK TERMINAL COMPANY (OTTCO)

EPC CONTRACTOR : CHINA PETROLEUM PIPELINE ENGINEERING CO., LTD.

PROJECT TITLE : RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)

DOCUMENT NUMBER : 9686-6120-DB-PO0079-0004

SB DESIGNATION : 415V LV MCC (SS01A-MCC-602)

LOCATION : OMAN

REVISION DATE : 29/12/2022

REVISION NUMBER : 1

Page 1 of 3
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
110V DC LOAD CALCULATION - (SS01A-MCC-602)
Load
LOAD
Operating (Tripping) Load at Continuous (Closing) Load at
No. of in
S. No. DESCRIPTION Units per Beginning of Load cycle load End of Load cycle REMARKS
panels Watts
Panel (First 1 Minute) (Next 58 Min) (Last 1 Minute)
(Each)
(Watts) (Watts) (Watts)
TRANSFORMER INCOMERS - 5000A 2
1 Protection Relay (IED) Other Protection 1 2 12 24 24 24
2 Protection Relay (IED) 64 REF 1 2 12 24 24 24
3 ACB Tripping Coil 2 2 450 1800 Tripping Coil Operating time (35mS)
4 ACB Closing Coil 1 2 450 900 Closing Coil Operating time (40mS)
5 ACB Spring charging motor 1 2 250 500 Spring charge motor operating time (5 sec)
6 Lockout relay (86) 2 2 47 188
7 Trip relay (94) 1 2 18 36
8 Arcon 2 2 20 80
9 Trip circuit supervision relay (74) 2 2 18 72 72 72
10 Miscellaneous Load (Aux. Relays +Aux. Contactor etc) 1 2 60 120 120 120
11 Indicating lamps 12 2 0.26 6.24 6.24 6.24
12 Multifunction Meter 1 2 8 16 16 16

BUS COUPLER-1 - 5000A 1 B/C-1 Normally Open, Tripping not envisaged


1 Protection Relay (IED) Other Protection 1 1 12 12 12 12
2 ACB Tripping Coil 2 1 450 Tripping Coil Operating time (35mS)
3 ACB Closing Coil 1 1 450 Closing Coil Operating time (40mS)
4 ACB Spring charging motor 1 1 250 Spring charge motor operating time (5 sec)
5 Lockout relay (86) 1 1 47 47
6 Trip relay (94) 1 1 18 18
7 Arcon 1 1 20 20
8 Trip circuit supervision relay (74) 2 1 18 36 36 36
9 Miscellaneous Load (Aux. Relays +Aux. Contactor etc) 1 1 60 60 60 60
10 Indicating lamps 12 1 0.26 3.12 3.12 3.12
11 DC to DC Converter 2 1 200 400 400 400
12 Diode Module 2 1 40 80 80 80

Page 2 of 3
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
110V DC LOAD CALCULATION - (SS01A-MCC-602)
Load
LOAD
Operating (Tripping) Load at Continuous (Closing) Load at
No. of in
S. No. DESCRIPTION Units per Beginning of Load cycle load End of Load cycle REMARKS
panels Watts
Panel (First 1 Minute) (Next 58 Min) (Last 1 Minute)
(Each)
(Watts) (Watts) (Watts)
OUTGOINGs 5
1 Protection Relay (IED) Other Protection 1 5 12 60 60 60
2 Lockout relay (86) 1 5 47 235
3 ACB Tripping Coil 2 5 540 5400 Tripping Coil Operating time (35mS)
4 ACB Closing Coil 1 5 540 2700 Closing Coil Operating time (35mS)
5 ACB Spring charging motor 1 5 275 1375 Spring charge motor operating time (3 sec)
6 Trip circuit supervision relay (74) 2 5 18 180 180 180
7 Indicating lamps 8 5 0.26 10.4 10.4 10.4

Miscellaneous 1 1 200 200 200 200

Total for 415V switchgear 9128 1304 6779

Total DC load in Watts 9128 1304 6779

Total DC Load in Watts


9584 1369 7118
(Considering 5% Detailed Design Margin)
Total DC Load in Watts
(Considering 15% future load) 11022 1574 8185
NOTES:
1. Closing coil load for 2 breaker considered for converter sizing, Since 2 out of 3 will operate at a time
2. For lockout relays continuous power consumption not considered. Since the lock out relays will operate only on fault, tripping load only considered
3. Tripping of all closed circuits except buscoupler has been considered for the battery sizing during first cycle (1 min).
4. 110V DC to 24V DC convertor considered for ethernet switch IPCS comm.

Page 3 of 3
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
240V AC HEATER LOAD CALCULATION - (SS01A-MCC-602)

DOCUMENT TITLE : 240V AC HEATER LOAD CALCULATION

CLIENT : OMAN TANK TERMINAL COMPANY (OTTCO)

EPC CONTRACTOR : CHINA PETROLEUM PIPELINE ENGINEERING CO., LTD.

PROJECT TITLE : RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)

DOCUMENT NUMBER : 9686-6120-DB-PO0079-0004

SB DESIGNATION : 415V LV MCC (SS01A-MCC-602)

LOCATION : OMAN

REVISION DATE : 29/12/2022

REVISION NUMBER : 1

Page 1 of 2
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
240V AC HEATER LOAD CALCULATION - (SS01A-MCC-602)
S. No. DESCRIPTION Total LOAD in Total LOAD in Watts REMARKS
Watts

1 Panel Lamp 35 10 350


2 Indication Lamps 38 0.3 11.4
3 Panel Heater 35 60 2100
4 Motor Starter - Type - 5 (55kW) 3 300 900
5 Motor Starter - Type - 5 (110kW) 3 300 900

Total for switchgear 4261

Total AC load in Watts 4261

Total AC Load in Watts


4474.47
(Considering 5% Detailed Design Margin)

Total AC Load in Watts


5146 Watts
(Considering 15% future load)

NOTES:
1. 60W is considered for Panel Heater Circuit.
2. 300W is considered for Motor Space Heater Circuit.

Page 2 of 2
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
240V AC CONTROL TRF. CALCULATION - (SS01A-MCC-602)

DOCUMENT TITLE : 240V AC CONTROL TRF. CALCULATION

CLIENT : OMAN TANK TERMINAL COMPANY (OTTCO)

EPC CONTRACTOR : CHINA PETROLEUM PIPELINE ENGINEERING CO., LTD.

PROJECT TITLE : RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)

DOCUMENT NUMBER : 9686-6120-DB-PO0079-0004

SB DESIGNATION : 415V LV MCC (SS01A-MCC-602)

LOCATION : OMAN

REVISION DATE : 29/12/2022

REVISION NUMBER : 1

Page 1 of 3
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
240V AC CONTROL TRF. CALCULATION - (SS01A-MCC-602)
S. No. DESCRIPTION Total in LOAD in Total LOAD in Watts Total LOAD REMARKS
Bus-A Watts in kVA

1 Motor Starter - Type - 1 (upto 11kW) 40 25.52 1020.8


2 Motor Starter - Type - 1 (15 to 30kW) 5 34.42 172.1
3 Motor Starter - Type - 5 (110kW) 2 21.02 42.04
4 Power feeder - Type - 2 33 13.62 449.46

Total AC load in Watts - Bus-A 1684

Total AC Load in Watts


1768.62
(Considering 5% Detailed Design Margin)

Total AC Load in Watts


2034 2.54
(Considering 15% future load)

S. No. DESCRIPTION Total in LOAD in Total LOAD in Watts Total LOAD REMARKS
Bus-B Watts in kVA

1 Motor Starter - Type - 1 (upto 11kW) 37 25.52 944.24


2 Motor Starter - Type - 1 (15 to 30kW) 4 34.42 137.68
3 Motor Starter - Type - 3 (37, 45 & 55kW) 5 43.42 217.1
4 Motor Starter - Type - 5 (110kW) 1 21.02
5 Power feeder - Type - 2 24 13.62 326.88

Total AC load in Watts - Bus-B 1626

Total AC Load in Watts


1707.20
(Considering 5% Detailed Design Margin)

Total AC Load in Watts


1963 2.45
(Considering 15% future load)

Total Load (Bus-A, Bus-B) 3997 5.00

Selected Control Trf. in kVA 6 kVA

Page 2 of 3
VOLTAMP TECHNOLOGY
SWITCHGEAR ENGINEERING DIVISION
P.O.Box. 75 – Rusayl Industrial Estate
Postal code 124
SULTANATE OF OMAN
240V AC CONTROL TRF. CALCULATION - (SS01A-MCC-602)

Power Feeder DOL Feeder 15 to 30kW


Aux. relay 1.6 3 4.8 Aux. relay 1.6 6 9.6
Indication Lamp 0.26 2 0.52 Indication Lamp 0.26 2 0.52
MCU Basic module 8.3 1 8.3 Power Contactor 16 1 16
13.62 MCU Basic module 8.3 1 8.3
34.42
DOL Feeder upto 11kW DOL Feeder - 37, 45, 55kW
Aux. relay 1.6 6 9.6 Aux. relay 1.6 6 9.6
Indication Lamp 0.26 2 0.52 Indication Lamp 0.26 2 0.52
Power Contactor 7.1 1 7.1 Power Contactor 25 1 25
MCU Basic module 8.3 1 8.3 MCU Basic module 8.3 1 8.3
25.52 43.42
DOL Feeder 110kW
Aux. relay 1.6 6 9.6
Indication Lamp 0.26 2 0.52
Power Contactor 2.6 1 2.6
MCU Basic module 8.3 1 8.3
21.02

Page 3 of 3