This document provides a weekly list of maintenance activities from March 18-23, 2023 for various EPSB locations. It includes details of 14 work permits for preventative maintenance of equipment like battery chargers, busducts, and switchboards. Many require temporary power interruptions at locations like TASS, SUBD, and TMIS NB between midnight and 4 AM with generators or alternate supplies used to minimize impacts.
This document provides a weekly list of maintenance activities from March 18-23, 2023 for various EPSB locations. It includes details of 14 work permits for preventative maintenance of equipment like battery chargers, busducts, and switchboards. Many require temporary power interruptions at locations like TASS, SUBD, and TMIS NB between midnight and 4 AM with generators or alternate supplies used to minimize impacts.
This document provides a weekly list of maintenance activities from March 18-23, 2023 for various EPSB locations. It includes details of 14 work permits for preventative maintenance of equipment like battery chargers, busducts, and switchboards. Many require temporary power interruptions at locations like TASS, SUBD, and TMIS NB between midnight and 4 AM with generators or alternate supplies used to minimize impacts.
EPSB WEEKLY LIST OF ACTIVITY (18/03/2023-24/03/2023)
WORK PERMIT ISSUE DATE TASK DESCRIPTION LOCATION DURATION REMARKS
WP-23-0284 PREVENTIVE MAINTENANCE MUDS SB 1900hrs-0000hrs - No impact to operation WP-23-0284 PREVENTIVE MAINTENANCE BDUS SB 0700hrs-1300hrs - No impact to operation
- De-Energize MSB to conduct
preventive maintenance for busduct and MSB. EP-23-0939-1 REPLACEMENT OF LV DPM METER AND TASS 0000Hrs-0400Hrs - Normalize back MSB after TRANSFORMER TEMPERATURE CONTROLLER complete. 3/18/2023 - ATS will change over to another source during this work.
- Interruption possibility for all
EP-23-0943-1 PM BATTERY CHARGER TTDS 0000Hrs-0400Hrs connected load to battery charger. WP-23-0322 ONLINE PD MAPPING TTDS 0000Hrs-2359Hrs - No impact to operation WP-23-0284 PREVENTIVE MAINTENANCE BAUS NB 1900hrs-0000hrs - No impact to operation WP-23-0284 PREVENTIVE MAINTENANCE SUJS NB 0700hrs-1300hrs - No impact to operation
- Require to open AT2 at OCC
A and AT4 at OCC B (Supply for RSMO and INFRA Building) - ATS will changeover to ON-LOAD TEST FIXED GENSET FOR 2000KVA EP-23-0940-1 SUBD 0000Hrs-0400Hrs generator supply at LV Room 3/19/2023 GENERATOR RSMO and INFRA. - Generator to run under two load from RSMO and INFRA for at least 60 minutes.
PM BATTERY CHARGER, TRANSFORMER, MSB AND
EP-23-0944-1 SUBD ADMIN 0000Hrs-0400Hrs - No impact to operation BUSDUCT WP-23-0322 ONLINE PD MAPPING SUBD ADMIN 0000Hrs-2359Hrs - No impact to operation WP-23-0284 PREVENTIVE MAINTENANCE BAUS SB 1900hrs-0000hrs - No impact to operation 3/20/2023 WP-23-0284 PREVENTIVE MAINTENANCE SUJS SB 0700hrs-1300hrs - No impact to operation WP-23-0284 PREVENTIVE MAINTENANCE TTDS NB 1900hrs-0000hrs - No impact to operation WP-23-0284 PREVENTIVE MAINTENANCE STKS NB 0700hrs-1300hrs - No impact to operation WP-23-0283 COMPETENT ENGINEER INSPECTION (INCLUDING SUBS - SEMS 0700hrs-1900hrs - No impact to operation PYWP-23-0826 DEPOT) WP-23-0322 ONLINE PD MAPPING PHDS 0700Hrs-0400Hrs - No impact to operation 3/21/2023 - Interruption possibility for all EP-23-0942-1 PM BATTERY CHARGER STKS 0000Hrs-0400Hrs connected load to battery charger.
- Interruption possibility for all
EP-23-0941-1 PM BATTERY CHARGER PHDS 0000Hrs-0400Hrs connected load to battery charger. WP-23-0284 PREVENTIVE MAINTENANCE TTDS SB 1900hrs-0000hrs - No impact to operation WP-23-0284 PREVENTIVE MAINTENANCE STKS SB 0700hrs-1300hrs - No impact to operation COMPETENT ENGINEER INSPECTION (INCLUDING PYWP-23-0826 SEMP - KAJS 0700hrs-1900hrs - No impact to operation DEPOT) PYWP-23-1170 ONLINE PD MAPPING SUBS 0700Hrs-0400Hrs - No impact to operation
- De-Energize MSB to conduct
preventive maintenance for 3/22/2023 busduct and MSB. - Normalize back MSB after EP-23-0947-1 PM MSB & BUSDUCT TMIS NB 0000Hrs-0400Hrs complete. - ATS will change over to another source during this work.
- Interruption possibility for all
PYWP-23-1173 PM BATTERY CHARGER SUBS 0000Hrs-0400Hrs connected load to battery charger. WORK PERMIT ISSUE DATE TASK DESCRIPTION LOCATION DURATION REMARKS WP-23-0284 PREVENTIVE MAINTENANCE PHDS NB 1900hrs-0000hrs - No impact to operation WP-23-0284 PREVENTIVE MAINTENANCE KAJS NB 0700hrs-1300hrs - No impact to operation
- De-Energize MSB to conduct
preventive maintenance for busduct and MSB. - Normalize back MSB after EP-23-0946-1 PM MSB & BUSDUCT TMIS SB 0000Hrs-0400Hrs complete. 3/23/2023 - ATS will change over to another source during this work.
- Interruption possibility for all
PYWP-23-1172 PM BATTERY CHARGER KASS 0000Hrs-0400Hrs connected load to battery charger. PYWP-23-1170 ONLINE PD MAPPING KASS 0700Hrs-0400Hrs - No impact to operation WP-23-0284 PREVENTIVE MAINTENANCE PHDS SB 1900hrs-0000hrs - No impact to operation WP-23-0284 PREVENTIVE MAINTENANCE KAJS SB 0700hrs-1300hrs - No impact to operation PYWP-23-1170 ONLINE PD MAPPING KWDS 0700Hrs-2359Hrs - No impact to operation
- De-Energize MSB to conduct
preventive maintenance for busduct and MSB. - Normalize back MSB after EP-23-0945-1 3/24/2023 PM MSB & BUSDUCT TMUS NB 0000Hrs-0400Hrs complete. - ATS will change over to another source during this work.