Professional Documents
Culture Documents
Owner's Engineer
Contractor
Sub-Supplier
Project
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
(2 x 600MW)
Title
INSPECTION AND TEST PLAN FOR
TRANSFORMER INSTALLATION
Document No.
Rev. Page-No.
NS2-DH01-P0ZEN-140010
0 8
ID No. NS2-DH01-P0ZEN-140010
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
(2 x 600MW) Rev: 0
Not over
- NS2-DD09-P0ZEN-140010 - Method
Check impact recorder records for any - Lateral (X AXIS) : 2G
1.2 Statement for Transformer installation NS2-DH01-P0ZEN-140010 (2) H W W 100%
abnormal impacts during transit - Longitudinal (Y AXIS) : 3 G
- Manufacturer's manual
- Vertical (Z AXIS) : 2G
- NS2-DD09-P0ZEN-140010 - Method
4.1 Check the joints for oil leak No leakage found NS2-DH01-P0ZEN-140010 (3) H W W 100%
Statement for Transformer installation
Inspect cable glands & cable end - NS2-DD09-P0ZEN-140010 - Method - All cable entry points are installed with Glands
4.2 NS2-DH01-P0ZEN-140010 (3) H W W 100%
connections Statement for Transformer installation - Cables in good arrangement and connection
ID No. NS2-DH01-P0ZEN-140010
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
(2 x 600MW) Rev: 0
- NS2-DD09-P0ZEN-140010 - Method
4.3 Check transformer oil level. Statement for Transformer installation - Between Max - Min level NS2-DH01-P0ZEN-140010 (3) H W W 100%
- IEC 60076
5.3 Polarization Index Test(5000V) IEC 60076(2011) Cl.11.1.12 PI: Over 1.3 (R10/R1) NS2-DH01-P0ZEN-140010 (4) H W S 100% For Reference
Abbreviation: S: Surveillance R: Report Review RW : Random Witness W: Witness Inspection H: Hold Inspection
ID. NS2-DH01-P0ZEN-140010
INSPECTION AND TEST PLAN FOR
TRANSFORMER INSTALLATION Rev. 0
CONTENTS
Equipment Unit
Construction RESULT
Inspection
Inspection Item Drawing/ Remark
part Code & Standard Accept Reject N/A
-GSUT: 1800 mm
Length of the rail
- UAT: 11000 mm
Rail
Distance between the rails as per - GSUT: 1600 mm
approved construction drawing - UAT 1009 mm
- GSUT, M16 =
75NM
Torque check for rail fixed bolt
- UAT, M20 =
150NM
Signature
Full Name
Date
Equipment Unit
Construction RESULT
Inspection
Inspection Item Drawing/ Remark
part Code & Standard Accept Reject N/A
- Method Statement
Check impact recorder records for - Not over (X)2G,
TR body any abnormal impacts during (Y)3G, Z(2G)
transit - Manufacturer's
manual
Transformer is
located with center
TR body On foudation check as per approved
construction
drawing
Certainly, not
TR body Transformer is fixed to foundation
movable
Signature
Full Name
Date
Equipment Unit
Construction RESULT
Inspection
Inspection Item Drawing/ Remark
part Code & Standard Accept Reject N/A
- Installed on main
body with a sloop pipe
connect to main TR
Transformer Conservator - Oil level is shown
correctly on Level
Gauge (refer to Oil
Curve)
Transformer
information is fully
Transformer Check nameplate and correctly described
as per construction
drawing
Between Max-Min
Transformer Check Transformer oil level level
(Refer to Oil Curve)
- Fixed on foundation
certainly
Panel NGR Panel - Panel is grounded
- No damage found
- Cable entry is sealed
Construction RESULT
Inspection
Inspection Item Drawing/ Remark
part Code & Standard Accept Reject N/A
- Cleaning
- No damage is found
Bushing Bushing - Oil level between
max-min line
- No oil leak
- TR cleaning
- TR area in good
General Final check
clearance
- No damage is found
Signature
Full Name
Date
Equipment Unit
Inspection result
Construction RESULT
Inspection
Inspection Item Drawing/ Remark
part Code & Standard Accept Reject N/A
1
5
10
PI
1 Min
<Remarks & Comments>
Signature
Full Name
Date