Professional Documents
Culture Documents
D 05-Dec-19 N.Q.HUY Y.H.KANG Y.H.KANG ADDED THE BUS DUCT INSPECTION ITEM(4)
C 22-Aug-19 N.Q.HUY Y.H.KANG Y.H.KANG REVISED AS PER THE OWNER'S COMMENTS
B 16-July-19 N.Q.HUY Y.H.KANG Y.H.KANG REVISED AS PER THE OWNER'S COMMENTS
A 04-Jun-19 N.Q.HUY Y.H.KANG Y.H.KANG FOR APPROVAL
Owner’s Engineer
Contractor
Project
Title
INSPECTION AND TEST PLAN FOR ELECTRICAL EQUIPMENT
INSTALLATION (MV, LV, MCC, PANEL)
Document No.
Rev. Page-No.
NS2-DH01-P0ZEN-140003 D 8 Pages
CONTENTS
3) REFERENCE DOCUMENTS
DETAILED LEGEND
S : Surveillance Point A point where Contractor and others may carry out surveillance
of work in progress and documentation associated on an unscheduled basis, with no
notification required by any party and without amendment to the scheduled
program.
-1-
1) INSPECTION AND TEST PLAN
Contact Resistance Test for Main IEC-62271 & Refer 24micro ohm per each
2.5 Bus bar document manufacture phase at DC100A
NS2-DH01-P0ZEN-140003 (3) H W W 100%
Over 10 mega-ohms
IEC-60439 & Refer ( Referred from IEC
3.4 Insulation Resistance Test for Main
document manufacturer 60439-1 : minimum
NS2-DH01-P0ZEN-140003 (3) H W W 100%
Bus bar
1000ohm/V)
Abbreviation : S: Surveillance R: Report Review RW: Random Witness Inspection W: Witness Inspection H: Hold Inspection Acc: Accept Rej: Reject N/A: Not applicable
-2-
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT ID No : NS2-DH01-P0ZEN-140003
(2 x 600MW) Rev : D
TITLE: INSPECTION AND TEST PLAN FOR Electrical Equipment (MV/LV/MCC/BUS DUCT/PANEL) Installation
Participation by
Description of Inspection and Codes & Standards Sampling
No Acceptance Criteria Record Format Sub- Remark
Test Procedure Contractor Owner frequency
Con D
4. Installation of NON SEGREGATED PHASE BUS DUCT
Visual Installation inspection of
1.1 AFC Drawing AFC Drawing NS2-DH01-P0ZEN-140003 (1) H W W 100%
Bus Duct
-3-
2) INSPECTION REPORT FOR ELECTRICAL EQUIPMENT (MV/LV/MCC/ BUS DUCT ) INSTALLATION
FOR 24/JUN/2020
CONTRACTOR DATE
MV/LV/MCC/BUS DUCT/PANEL
SUBCONTRACTOR LILAMA INSTALLATION PAGE 1 of 1
PROJECT NAME Nghi Son 2 BOT Thermal Power Plant Project UNIT NO. 1
INFORMATION DATA
The 22kV circuit breaker
System/Component Sys./Component ID
6 Torque Test for Main Busbar/ Bus Duct and Earthing bar joints.
14 Bus bar joint protection cover and Bus bar sequence and phase identification.
COMMENTS :
Full Name
Signature
Date
-4-
OWNER IR No.
TEST REPORT
CONTRACTOR
FOR DATE
MV/LV/MCC/BUS DUCT TORQUE
SUBCONTRACTOR PAGE of
PROJECT NAME Nghi Son 2 BOT Thermal Power Plant Project UNIT NO.
INFORMATION DATA
System/Component Sys./Component ID
OTHER COMMENTS :
Full Name
Signature
Date
-5-
OWNER IR No.
INSPECTION REPORT
FOR
CONTRACTOR DATE
MV/LV/MCC/BUS DUCT BUSBAR
SUBCONTRACTOR PAGE of
System/Component Sys./Component ID
Yes No
OTHER COMMENTS :
Full Name
Signature
Date
-6-
OWNER IR No.
SUBCONTRACTOR PAGE of
System/Component Sys./Component ID
CALIBRATION DUE
TEST INSTRUMENT MAKER/MODEL SERIAL NO.
DATE
30 kV DC shall be applied on voltage apply points for 1 minute with CB in open condition.
OTHER COMMENTS :
Full Name
Signature
Date
-7-
OWNER INSPECTION REPORT IR No.
FOR
CONTRACTOR NEUTRAL GROUNDING RESISTOR DATE
CUBICLE
SUBCONTRACTOR PAGE of
PROJECT NAME Nghi Son 2 BOT Thermal Power Plant Project UNIT NO.
INFORMATION DATA
System/Component Sys./Component ID
COMMENTS :
Full Name
Signature
Date
-8-
3) REFERENCE DOCUMENTS
-9-