TITLE: INSPECTION AND TEST PLAN FOR BOILER AND BOP PIPING INSTALLATION
Codes & Standards Participation by Sampling
No. Description of Inspection & Test Acceptance Criteria Record Format Remarks
Procedure Frequency
Sub-Con Contractor Ower
Method statement for heat treatment No. NS2-DD09-P0ZEN- Method statement for heat treatment No. NS2-DD09-P0ZEN-
2.4 PWHT PWHT Report H W R -
740011 740011
NDE ( For P91 welds, 100% NDE shall be carried out both before See NDE Requirement
2.5 NDE Procedure No. NS2-QE03-P0ZEN-040011 NDE Procedure No. NS2-QE03-P0ZEN-040011 NDE Report H RW R -
and after PWHT). (note 6)
G
That weld joint will applied follow If more than 2 times repairing
ASME B 31.1 That weld joint will applied follow item 2.1 to 2.6 same as
2.7 Repairing weld (if any) item 2.1 to 2.6 same as original H W W 100% at same joint, the welding joint
original activites above respectively
activites above respectively shall be fully cut and rewelded.
ITP No : NS2-DH01-P0ZEN-740008
NGHI SON 2 BOT THERMAL POWER PLANT PROJECT Rev : G
TITLE: INSPECTION AND TEST PLAN FOR BOILER AND BOP PIPING INSTALLATION
Codes & Standards Participation by Sampling
No. Description of Inspection & Test Acceptance Criteria Record Format Remarks
Procedure Frequency
Sub-Con Contractor Ower
Approved Construction Drawing Approved Construction Drawing Final Walkdown Inspection report
NS2-XJ00-P1LBC-371005; NS2-XJ00-P1LBC-371006 NS2-XJ00-P1LBC-371005; NS2-XJ00-P1LBC-371006 (Form#9)
5.1 Final Inspection H W W 100%
NS2-XJ00-P1LAB-371007; NS2-XJ00-P1LBA-371001; NS2- NS2-XJ00-P1LAB-371007; NS2-XJ00-P1LBA-371001; NS2- Punch List Inspection Report
XJ00-P1LBA-371002; NS2-XJ00-P1LBB-131001~131005 XJ00-P1LBA-371002; NS2-XJ00-P1LBB-131001~131005 (Form #10)
Abbreviation : S: Surveillance R: Report Review RW : Random Witness W: Witness Inspection H: Hold Inspection Acc: Accept Rej: Reject N/A: Not Applicable