WORK PERMIT
DATE TASK DESCRIPTION LOCATION DURATION REMARKS
NO.
Normalisation of HA2, HB3, R1 & R2 Incomer.
Power will be interrupted at Entire Ring 4 for
Normalisation of SSU Semantan
EP-22-2202-1 09/07/2022 SEMP-BUBS 0000Hrs-0400Hrs temporary during switching activities.
Portal
Affected Station (SEMP, MUNS, PASS, MERS,
BUBS, IVS1, IVS2).
WP-22-0872 09/07/2022 DB & SSB Relay Recalibration SUJS-KAJD 0700Hrs-1900Hrs No Impact to Operation.
WP-22-0872 10/07/2022 DB & SSB Relay Recalibration STKS-KAJS 0700Hrs-1900Hrs No Impact to Operation.
EP-22-2200-1 11/07/2022 Earthing Viaduct Inspection SUJS-STKS 0000Hrs-0400Hrs Required to De-energize DC traction supply.
STKS-KAJS
EP-22-2199-1 12/07/2022 Earthing Viaduct Inspection 0000Hrs-0400Hrs Required to De-energize DC traction supply.
Line End
EP-22-2198-1 13/07/2022 Earthing Viaduct Inspection BDUS-SUJS 0000Hrs-0400Hrs Required to De-energize DC traction supply.
WP-22-0872 14/07/2022 DB & SSB Relay Recalibration SUBD 1900Hrs-0700Hrs No Impact to Operation.
WP-22-0872 15/07/2022 DB & SSB Relay Recalibration KWSS 1900Hrs-0700Hrs No Impact to Operation.
WP-22-0872 16/07/2022 DB & SSB Relay Recalibration KDAS 1900Hrs-0700Hrs No Impact to Operation.
WP-22-0872 20/07/2022 DB & SSB Relay Recalibration BSCS-BDUS 0700Hrs-1900Hrs No Impact to Operation.
WP-22-0872 21/07/2022 DB & SSB Relay Recalibration BTHS-SRRS 0700Hrs-1900Hrs No Impact to Operation.
WP-22-0872 22/07/2022 DB & SSB Relay Recalibration TCOS-TASS 0700Hrs-1900Hrs No Impact to Operation.