Reference No. EP PIC ID Status System Panel Location Equipment Failure Description Date Reporting Progress ACB at Panel Tx1, Tx2 and Common Supply to 1. Damage report has been submitted Load Trip Due to OCEF Relay at LV Room to Rapid Rail. Admin Building 2. Item received from Rapid Rail on 1. Measure voltage and current at primary & 16/03/2022. RR PIC : DZAHIR secondary side to ensure no fault current. 3. Plan to replace 3 unit of OCEF relay OCEF Relay (Mikro 2. Disconnected cable input to relay & torn on on (27/03/2022). DR-001 Farid WORK ORDER ID: Close LV MSB SUBD (Admin) MK 1000A -150D) the relay to confirm the relay condition. 07/03/2022 DPT001-2022-155538 4. Replacement Job Completed on 3. To replace 3 unit OCEF Relay (Mikro MK 27/03/2022. 1000A-150D) 5. Pending Closure Report to RR. 6. Closure Report Submitted to RR. 7. Job Complete. 1. FUSE 16 Amp & 2 Amp Blow 1. Damage report has been submitted 2. Closing Coil Faulty to Rapid Rail. 1. Fuse (500 V- 3. Under Voltage Release Coil Faulty 2. Fuse purchased by Edinson but 80kA/16A) 1. Conduct troubleshoot for ACB Coupler A. pending other spare part. RR PIC : SYAHMI 2. Fuse (380V- 2. Measure reading for all ACB Coupler A Coil. 3. Replacement Job for fuse Completed DR-002 Farid WORK ORDER ID: Open LV MSB SRRS (SB) 100kA/ 2A) (Motorize, UVR, Shuntrip, Closing Coil). 07/03/2022 on 29/03/2022. STN028-2022-618 3. Under Voltage 3. Reading of the measurement shows UVR and 4. Pending under voltage release coil Release Coil Closing Coil faulty. and closing coil replacement parts. 4. Closing oil 4. To replace fuse 16A & 2A, Closing Coil and UVR. 1. 4mm Cable (Red, Black, Green) Burnt 1. Damage report has been submitted 2. 1mm Cable (Red, Black, Green) Burnt to Rapid Rail. 1. Check Fuse F10 from Battery bank. 2. Item received from Rapid Rail on 1. 4mm Cable (Red, 2. Check voltage battery bank. Voltage drop 17/03/2022. RR PIC : SYAHMI Battery Charger & Black, Green) detected. (Total=87Cell) 3. Plan to replace cable on 29/03/2022 DR-003 Farid WORK ORDER ID: Open LV SRRS (SB) 2. 1mm Cable (Red, 3. Check and found cable burn at battery bank. 07/03/2022 4. Replacement Job Completed on STN028-2022-621 Battery Cell Black, Green) 4. To replace cable 4mm and 1mm. 29/03/2022. 3. Fuse F10 5. Pending Closure Report to RR. 6. Closure Report Submitted to RR. 7. Job Complete. Battery Cell Drain Out 1. Damage report has been submitted 1. Measure output charger voltage : 121.4 VDC to Rapid Rail. (Normal). 2. Plan to retest battery on 29/03/2022. 2. Most battery voltages drop to 0.243 VDC for 3. Test on 29/03/2022 to be reschedule. each battery cell. Require more information. 3. Battery Cell leaking. 4. Item Received from Rapid Rail on RR PIC : SYAHMI 4. To replace 87 battery cell. 30/03/2022 for battery retest. DR-004 Munzir WORK ORDER ID: Open LV Battery Cell SRRS (SB) Battery Cell (87 cell 08/03/2022 5. Retest for battery cell completed and - KAP 1) found only one battery cell require to STN028-2022-622 replaced. 6. Replacement Job Completed on 10/06/2022. 7. Pending Closure Report to RR. 8. Closure Report Submitted to RR. 9. Job Complete. 1. 4mm Cable (Red, Black, Green) 3 Set Burnt 1. Damage report has been submitted 2. 1mm Cable (Red, Black, Green) 1 Set Burnt to Rapid Rail. 1. Check and found cable burn from battery 2. Item received from Rapid Rail on RR PIC : DZAHIR 1. 4mm Cable (Red, charger to battery bank during Preventive 17/03/2022. WORK ORDER ID: Black, Green) Maintenance. 3. Plan to replace Cable on 24/03/2022. DR-005 Farid Close LV Battery Cell BDUS(SB) 09/03/2022 STN031-2022-814 2. 1mm Cable (Red, 2. Currently cable has bad insulation. 4. Replacement Job Completed on Black, Green) 24/03/2022. 5. Pending Closure Report to RR. 6. Closure Report Submitted to RR. Job Complete. Fibre Cable Defective Alarm Triggered due to 1. Damage report has been submitted Faulty Fibre Patch Cord to Rapid Rail. 1. Retighten fibre patch cord cable connections 2. Received item from previous GF2 and carried out vissual inspection. panel on 27/03/2022. RR PIC : SYAHMI Fibre Patchcord 2. Temperory used other fibre patch cord cable 3. Plan to replace Fibre Optic Patch Cord DR-006 Hilman WORK ORDER ID: Open 33kV GIS KWDS(SB) Cable (ST-SC and alarm disapppear. 10/03/2022 on 03/04/2022. STN004-2022-830 Connector) 3. Require to change with new ST-SC Single 4. Replacement Job Completed on Mode Fibre Optic Patch Cord. 03/04/2022. 5. Pending Closure Report to RR. 6. Closure Report Submitted to RR. Job Complete. DPM Meter Display for Genset Unclear Visual. 1. Damage report has been submitted RR PIC : SYAHMI DR-007 Munzir WORK ORDER ID: Open Genset Genset KL Sentral Linkway ENTES DPM Meter 1. Visual Checking 13/03/2022 to Rapid Rail. KLSLINKWAY-2022-4 2. DPM can only display current value. 2. Pending replacement parts. 3. To replace with new DPM Meter. Surge Diverter (Blue Phase) Faulty 1. Damage report has been submitted 1. Conduct visual inspection. to Rapid Rail. 2. Item received from Novaris MULTIMOV 2. Measure Voltage input. Voltage OK. Rapid Rail on 16/03/2022. 3. Plan to RR PIC : DZAHIR Surge Diverters DR-008 Hilman WORK ORDER ID: Close LV MSB ESC03(NB & SB) 3. Item suspected faulty based on voltage input 08/03/2022 replace SPD on 22/03/2022. 4. ES03-2022-193 (SD1-150-275-N ) is normal. Replacement Job Completed on Blue Phase 4. To replace new Surge Diverter due to no 22/03/2022. 5. Pending Closure Report 1. CHINT Stored protection against lightning surge for blue to RR. 6. Closure Report Submitted to RR PIC : FARHAN DR-009 Munzir WORK ORDER ID: Open LV MSB SUJS(NB) Energy Motor phase. 1. Stored Energy Motor Faulty 20/03/2022 RR.Damage 1. Job Complete. report has been submitted 2. CHINT Under 2. Under Voltage Release Faulty to Damage Rapid Rail. STN033-2022-769 Voltage Release Auxiliary Transformer Temperatore Controller 1. report has been submitted 1. Check Did the motorise gear and found the Not Function 2. Stored to energy motor replacement job Rapid Rail. motorise 1. gearfound Check and broken. that the MCB at control completed 2. on 26/05/2022. Item received from Rapid Rail on 2. Measure reading for panel is in trip position. undervoltage coil. 3. Pending 16/03/2022. under voltage release Undervoltage 2. Check power Coil Reading supply = 0.612kΩ voltage. Available (242.0 replacement parts.Temperatore 3. Plan to replace RR PIC : IQBAL Temperatore 3. Require to replace with new Stored Energy VAC). Controller on 19/03/2022. DR-010 Farid WORK ORDER ID: Close Auxiliary PER SEMP(SB) 02/03/2022 Transformer Controller (Neuron Motor and Under Voltage 3. Reset MCB but trip again. Release. 4. Replacement Job Completed on POR001-2022-616 Tech - KN805 4. To replace temperatore controller as item 19/03/2022. being suspected faulty. 5. Item Replaced. Pending Closure Report to RR. 6. Closure Report Submitted to RR. Job RR PIC : IQBAL Complete. DR-011 Farid WORK ORDER ID: Close LV ESDB-RS SUBD(RSMO) Timer Relay(ANLY Automatic Transfer Switch Does Not Function 13/03/2022 1. Damage report has been submitted AH3-1) due to Timer Relay Faulty to Damage Rapid Rail. DPT001-2022-155677 1. report has been submitted 1. CheckEnergy Stored and found Motor that MT timer relay faulty. Faulty 2. Anly to RapidAH3-1 Rail. relay has been purchased 2. ACB 1. Temperory Incomerswap with GT A cannot timer relay perform and ATS auto close. onPending 2. 24/03/2022 by Edinson. replacement parts. RR PIC : SYAHMI system backdeltail to normal. 3. Replacement Plan to replace DR-012 Munzir WORK ORDER ID: Open LV MSB BSCS(SB) CHINT Stored 2. Conduct check on stored energy 31/03/2022 3. JobTimer Relay on Completed on Energy Motor 3. To replace motor newthe and found timer relayenergy motor is stored 03/04/2022. 28/05/2022. STN030-2022-643 4. Pending 4. Replacement JobReport Closure Completed to RR.on faulty. 3. Require to replace with new stored energy 03/04/2022. 5. Closure Report Submitted to RR. motor. 5. 6. Pending Closure Report to RR. Job Complete. Step Down Transformer Overheat & Burnt 6. 1. Closure DamageReport report Submitted to RR. Job has been submitted 1. Isolate MCB AC supply to TX. Complete. to Rapid Rail. 2. Temporarily used DC Supply. 2. Pending replacement parts. 3. Require to replace with new step down 3. Item Received from Rapid Rail on RR PIC : SYAHMI Step Down transformer. 23/05/2022. DR-013 Munzir WORK ORDER ID: Open LV Battery Charger SUBS(NB) 05/04/2022 4. Replacement Job Completed on STN001-2022-703 Transformer 28/05/2022. 5. Pending Closure Report to RR. 6. Closure Report Submitted to RR. 7. Job Complete. 1. Damage report has been submitted to Rapid Rail. 2. Pending replacement parts. 3. Item Received from Rapid Rail. RR PIC : DZAHIR 4. Plan to replace OCEF Relay on OCEF Relay (Mikro OCEF Relay Faulty 19/06/2022. DR-014 Hilman WORK ORDER ID: Open LV SDB SUBD(RSMO) 07/04/2022 DPT001-2022-158490 MK 1000A -150D) 1. Troubleshoot Relay and try to reset the 5. Item received is from different alarm. 2. Could not clear alarm indicator light. specification. 3. Relay is faulty and do not function. 6. Item has been returned to Rapid Rail. 4. Require to replace with new OCEF Relay 7. Item Received from Rapid Rail. (Mikro MK 1000A-150D) 8. Plan to replace OCEF Relay on 1. Stored Energy Motor Faulty 1. Damage report has been submitted 2. Under Voltage Release Faulty to Rapid Rail. 1. Check the motorise gear and and 2. Pending replacement parts. RR PIC : IQBAL undervoltage coil at Incomer B ACB. DR-015 Munzir WORK ORDER ID: Open LV MSB TASS(SB) CHINT Stored 2. Found ACB Incomer B cannot auto close. 11/04/2022 STN027-2022-774 Energy Motor 3. After further checking, motorise gear and undervoltage coil is faulty. 4. Require to replace with new Stored Energy Motor and Under Voltage Release. 1. Damage report has been submitted to Rapid Rail. 2. Pending replacement parts. Stored Energy Motor Faulty 3. Item Received from Rapid Rail. RR PIC : IQBAL 1. ACB Incomer A cannot perform charging and 4. Plan to replace OCEF Relay on DR-016 Munzir WORK ORDER ID: Open LV MSB TCOS(SB) CHINT Stored auto close. 11/04/2022 02/06/2022. STN026-2022-806 Energy Motor 2. Conduct deltail check on stored energy 5. Replacement Job Completed on motor and found the stored energy motor is 02/06/2022. faulty. 6. Pending Closure Report to RR. 3. Require to replace with new stored energy 7. Closure Report Submitted to RR. motor. 8. Job Complete. Auxiliary Transformer Fan Faulty 1. Damage report has been submitted 1. Disconnect and take motor fan winding to Rapid Rail. resistance measurement and found 6 motor fan 2. Pending replacement parts. low resistance reading. 3. Item Received from Rapid Rail. 2. Disconnect capacitor of the fan motor and 4. Plan to replace auxiliary transformer RR PIC : FARHAN measure the value of capacitors. fan on 22/06/2022. Auxiliary 5. Replacement Job Completed on DR-017 Munzir WORK ORDER ID: Open PER Auxiliary Transformer KAJD 3. Found value of capacitor decreasing. 19/04/2022 DPT002-2021-5004 Transformer Fan 02/06/2022. 4. Inspect the cable connection and measure the resistance. 6. Pending Closure Report to RR due to 5. Change capacitor of the auxiliary transformer no soft copy of work order received. fan and found item does not working. 7.Job Complete 6. After all inspection, 6 auxiliary transformer fan is required to replace. Temperatore Controller for Transformer Faulty 1. The meter readings remain unchanged after 1. Damage report has been submitted swapping the cable connections to Rapid Rail. between R-phase and S-phase. 2. Pending replacement parts. - Reading before swapped 3. Plan to replace Timer Relay on R =72.3°C 03/06/2022. S =43.7°C 4. Replacement Job Completed on T =41.3°C 03/06/2022. - Reading after swapped 5. Closure Report Submitted to RR. RR PIC : DZAHIR Digital Temperatore 6. Job Complete. DR-018 Hilman WORK ORDER ID: Open TPSS Rectifier Trasformer BUBS(NB) Controller Display R =74.4°C 21/04/2022 STN018A-2022-896 (DK P-300C) S =41.9°C T =41.1°C 2. Retighten the cable connections and did a visual check. 3. Swapped cable connections between R- phase and S-phase 4. Currently, the temperatore controller reading for R-phase is inaccurate and is require to replace. Surge Diverter (Blue Phase) Faulty 1. Damage report has been submitted 1. The CE inspector highlights that SPD`s display to Rapid Rail. inside cubicle 2 is blinking. 2. Pending replacement parts. 2. Did a visual inspection and retightened the DEG01 ACB CHINTBAE NA1-2000 CBI2410A Faulty BatteryDue Charger Module RR PIC : SYAHMI Novaris MULTIMOV cable12170 GPP Faulty connections. Battery Lifetime Drop to Damage Surge Diverters Parts 3. UPS 1. Measuredbattery the voltage faulty across panel forcable genset each phase (Bus-Tieon DR-019 Hilman WORK ORDER ID: Open LV MSB BUBS(SB) One 1. 1. Battery Check and Cell Faulty retighten for outgoing MCB2 11/05/2022 STN018A-2022-907 (SD1-150-275) 1. Air the (DGCheckCircuit SPD. incoming). control Breaker (R=243.8v, internal battery (ACB) incomer Y=243.3v, resistance 3) at ACDB andpanel A cannot voltage battery Yellow Phase closed S=243.2v) 2. UPS by moduleAuto or show Manual (Alert mode. in each cell. 2.Check 2. 4. LV The supplyand SB voltages foundbackup are battery by available. voltagereplace state: coupler. drop during battery) 1. Stored. one 2. Found troubleshoot cell Motor Energy faulty (Cell Faulty 87). V = 0 VDC 3. 3. Inspect 5. There Check Temporary is and and find the noreset surge isolate mechanism protection alarm supply but from part broken onindicator Y-Phase battery for bank 2. Under Reading CHIINT inside ofVoltage Closing the voltage ACB Release drop: Electromagnet frame. Faulty 10.18 Vdc (Closing Coil) MSB alarm to 1. incomer. load. Under still (no appear redundancy voltage at UPS module. for 110 VDC) RR PIC : DZAHIR 3. 4. Due Faulty. 4. 6. ACB Require Battery Require to low incomer Acoil battery to replace to replace voltage cannotand SPD. reading one under voltage, be the close voltage (measured): unit on release generator position ofmechanism new batteryfor Fukuda (Nickel for 1. ACB (DEG1) Done Incomer unable replaced to by auto & manual operation.B faulty. operate. new motorize DR-020 Munzir WORK PIC ORDER ID: Open LV Battery Charger IVS2(NB) 26.75Vdc. cell. 2. 11/05/2022 1. Damage report has been submitted RR : AHMAD IVS02-2022-204 BAE CBI2410A Cadmium Battery) 5. After 4. Require Coupler 5. If supply Battery changeto A.lifetime incomernew Bmotorize, replace one unit dropfails, ACB of station to only BAE cannot will 25 minutes auto CBI2410A totally and to Damage Rapid Rail. DR-021 farid WORK RR PIC ORDER :IQBAL ID: Open Genset Battery Charger SEMP(A) Recharge and close. battery 2. When blackout charger conducted module. on LV Recharge side. a functionality test, ACB did 13/05/2022 1. report has been submitted ACB CHINTModule NA1- BAE 8 3. CBI2410A seconds. andand Continuity 2. Pending replacement parts. DR-022 farid POR001-2022-661 WORK RR PIC ORDER : SYAHMIID: Open LV MSB BAUS(SB) Continuity 2000 6. Found not autoFaulty Require Module 6. Require under close. voltage to replace to replace new 2 coil unitACB under voltage Immediately. of GPP 12170 13/05/2022 to 1. Rapid Rail. 3. Damage reportfrom Item Received has been Rapidsubmitted Rail. STN009-2022-618 1. CHINT Under release 3. Found Schneider faulty. closing Digital coil Power faulty. Meter (Easy Logic PM 2. to Pending replacement RapidtoRail. parts. DR-023 farid WORK RR PIC ORDER : IQBAL ID: Open Genset Genset Bustie SEMP(B) GPP 12170 Battery CHINT 1. The Battery. 4. The Require Under battery Voltage charger to replace Release panel under Faulty (DEG4) voltage shows releaseinand 18/05/2022 1. 4. Damage Plan report battery replace has been submitted cell on 4. ACB 3. Pending Plan to replace Timer Relay on DR-024 Munzir POR001-2022-662 WORK Voltage Coil 1200) 1. indicatorFaulty Checked offor and Coupler retightened battery A cannot charger cableoperates Faultyfail. connections. 2. to replacement Rapid Rail. 24/06/2022. 1. Damage parts. report has been submitted RR PIC ORDER : IQBAL ID: Open LV MSB SURS(NB) CHIINT 2. CHINTClosing Under under Battery auto 1. 2. ACB Check voltage mode Checked Charger for the and coil. Incomer Card retightened voltage B reading cannot the auto cable trip when at Recharge and 30/05/2022 28/05/2022. 2. Pending replacement parts. STN028-2022-674 1. 5. to Closure Report Rapid Rail. 4. Damage Replacement Submitted Job to Completed RR. on DR-025 Hilman WORK RR PIC ORDER : IQBAL ID: Open LV MSB TASS(SB) Electromagnet Voltage Release 5. Unable Requireto connections. under-voltage Continuity to run – 1000kVA replace occurs. Module. Closing There mobile Coil. iswear no genset. reading 09/06/2022 1. 3. Item report Received has from been Rapidsubmitted Rail. CHINT (ClosingUnder 2. Found that fuse’s holder 6. Pending 2. Job Complete. 03/05/2022. replacement parts. DR-026 Hilman STN027-2022-828 WORK RR PIC ORDER : QAHHARID: Open LV MSB TCOS(SB) Coil) Fukuda (Nickel 2. 3. Measured at Require the output to the input replace voltage. voltage under Voltage of and voltage reading tear therelease. meter = 0.64 V 09/06/2022 to 1. 4. Rapid Damage Plan toRail. report battery replace has beenonsubmitted Voltage Release (UnableVAC). (243.7 to replace new fuse) Fuse rating (250v- 5. Pending 2. to Closure Rapid Report Submitted replacement Rail. to RR. parts. DR-027 Farid STN026-2022-859 WORK 3. Use portable Fukuda charger asBattery) (Nickel Cadmium temporary KAPaction 2 to 17/06/2022. 1. Damage report has been submitted RR PIC ORDER : AHMAD ID: Open LV Battery Charger KWDS(SB) Cadmium Battery) 5A). 3. DPM Metervoltagedisplay drop.does not show any value. 10/06/2022 6. 2. Job Complete. Pending replacement parts. DR-028 Farid STN004-2022-946 WORK Battery KAP 2 Charger avoid Bloated FUKUDA batteryNickel Cadmium (KAP1) Faulty 4. Damage to 1. Replacement Rapid Rail. Job report hasCompleted on been submitted RR PIC ORDER : FARHANID: Open Mobile Genset Battery Charger KAJD Schneider Card Digital 3. 4. 4. Require Require Unable 1. Measure Found that to replace to replace tovoltage start batterygenset new battery Schneider in fully charger Digital auto Power mode. card. 12/06/2022 17/06/2022. DPT002-2022-5825 1. 1. CHINT Under forcell Voltage inflatable each Releasebattery. during Faulty 2. to 1. Pending replacement parts. Rapid Rail. DR-029 Hilman WORK RR PIC ORDER : IQBAL ID: Open LV MSB KWSS(SB) Power Meter (Easy BAE CBI2410A Meter 5. 2. Require visual Found (Easy toLogic inspection one replace battery PM 1200) one (preventive faultyunitmaintenance). of BAE Vdc) CBI2410A 15/06/2022 5. Damage 3. Closure Item reportfrom Report Received has been Submitted Rapidsubmitted to RR. Rail. DR-030 Farid STN005-2022-843 WORK Logic PM 1200) 2. CHINTreading Under Voltage Coil(0.59 Faulty 2. to 1. Pending Rapid replacement toRail. 6. Damage report OCEF parts. has been submitted RR PIC ORDER : SYAHMIID: Open Genset Battery Charger SEMP(B) Recharge and battery 2. Require 3. 1. Take charger ACB Incomer module. at to replace inflatable one new battery FUKUDA cell.Kap 1 17/06/2022 4. Job PlanComplete. replace Relay on POR001-2022-688 FUKUDA CHINT Nickel Continuity 1. Module Under Voltage drop to B0.92 cannot Vdc.auto close. 2. to Pending replacement parts. Rapid Rail. 20/06/2022. 1. DR-031 Hilman WORK RR PIC ORDER : QAHHARID: Open LV Battery Charger SUJS(SB) Cadmium Voltage (KAP1) Release battery cell. 2. Found under voltage coil and under voltage 3. Require to replace one new Fukuda (Nickel 25/06/2022 3. Damage 2. 5. reportfrom Item Received Pending has been replacement Replacement Job Rapidsubmitted Rail. parts. Completed on DR-032 Munzir STN033-2022-856 WORK to 1. RapidtoRail. Damage report has been submitted RR PIC ORDER : FARHANID: Open LV MSB SEMP(NB) Closing 2. CHINTBlock Under release faulty. Cadmium Battery) KAP 2 24/06/2022 4. Item 3. Plan replace Received 20/06/2022. 2. Pending OCEF from replacement Relay Rapid on Rail. parts. DR-033 Farid STN014-2022-632 WORK ORDER ID: Open 33kV GIS SSU SEMP Magnet with Closing Block Magnet with Rectifier TR1 Faulty 13/07/2022 to 4. RapidtoRail. 07/07/2022. 1. Damage Plan reportfrom replace has been OCEF submitted Relay onRR. Voltage Coil 6. 3. Closure Item Report Received 2. Replacement Pending Submitted replacement Rapid to Rail. parts. DR-034 POR001-2022-720 Rectifier TR1 1. Troubleshoot Panel HB2 due to breaker 5. to Rapid Rail. 22/06/2022. 7. Job Complete. Job Completed on 4. Plan to replace OCEF Relay on 07/07/2022. cannot closed. 2. 5. Pending replacement Replacement 20/07/2022. parts. on Job Completed DR-035 2. Found that closing lock magnet with rectifier 6. Closure Report Submitted to RR. 22/06/2022. 5. DR-036 TR1 at panel HB2 faulty. 7. Replacement 6. Job Complete. Closure Report Job Completed on Submitted to RR. 20/07/2022. DR-037 3. Temporary swap closing block magnet at 7. Closure 6. Job Complete. Report Submitted to RR. DR-038 Panel HB4 (Spare Feeder). 7. Job Complete. 4. Require to replace one unit of closing block DR-039 magnet. DR-040 DR-041 DR-042 DR-043 DR-044 DR-045 DR-046 DR-047 DR-048 DR-049 DR-050 DR-051 DR-052 DR-053 DR-054 DR-055 DR-056 DR-057 DR-058 DR-059 DR-060 DR-061 DR-062 DR-063 DR-064 DR-065 DR-066 DR-067 DR-068 DR-069 DR-070 DR-071 DR-072 DR-073 DR-074 DR-075 DR-076 DR-077 DR-078 DR-079 DR-080 DR-081 DR-082 DR-083 DR-084 DR-085 DR-086 DR-087 DR-088 DR-089 DR-090 DR-091 DR-092 DR-093 DR-094 DR-095 DR-096 DR-097 DR-098 DR-099 DR-100 DR-101 DR-102 DR-103 Pending Troubleshoot List No. EP PIC Status System
1 Hilman Open 33kV
2 Farid Open 33kV
3 Farid Close 33kV
4 Hilman Open Genset
Pending Troubleshoot List
No. EP PIC RR PIC & Work Order ID Status System FR-001 nding Troubleshoot List Panel Location Failure Description Date Reporting Progress To Plan Date LM2 - Breaker After MMJV GIS KWDF (SB) cannot close using 10/03/2022 Cable selector switch. Rectification Work To Plan Date After MMJV LM4 - Breaker Cable GIS BTHS (SB) cannot close using 16/03/2022 Rectification selector switch. Work To Reschedule LM2 - Breaker Job Completed - GIS BSCS (SB) cannot close using 25/03/2022 Retighten Every selector switch. Cable BAE could not Connection charge due to Battery Charger SEMP (Room 1) 25/05/2022 battery bank drain out.
nding Troubleshoot List
Panel Location Failure Description Date Reporting Progress