Reference No. EP PIC ID Status System Panel Location Equipment Failure Description Date Reporting Progress
ACB at Panel Tx1, Tx2 and Common Supply to 1. Damage report has been submitted
Load Trip Due to OCEF Relay at LV Room to Rapid Rail.
Admin Building 2. Item received from Rapid Rail on
1. Measure voltage and current at primary & 16/03/2022.
RR PIC : DZAHIR secondary side to ensure no fault current. 3. Plan to replace 3 unit of OCEF relay
OCEF Relay (Mikro 2. Disconnected cable input to relay & torn on on (27/03/2022).
DR-001 Farid WORK ORDER ID: Close LV MSB SUBD (Admin) MK 1000A -150D) the relay to confirm the relay condition. 07/03/2022
DPT001-2022-155538 4. Replacement Job Completed on
3. To replace 3 unit OCEF Relay (Mikro MK 27/03/2022.
1000A-150D) 5. Pending Closure Report to RR.
6. Closure Report Submitted to RR.
7. Job Complete.
1. FUSE 16 Amp & 2 Amp Blow 1. Damage report has been submitted
2. Closing Coil Faulty to Rapid Rail.
1. Fuse (500 V- 3. Under Voltage Release Coil Faulty 2. Fuse purchased by Edinson but
80kA/16A) 1. Conduct troubleshoot for ACB Coupler A. pending other spare part.
RR PIC : SYAHMI 2. Fuse (380V- 2. Measure reading for all ACB Coupler A Coil. 3. Replacement Job for fuse Completed
DR-002 Farid WORK ORDER ID: Open LV MSB SRRS (SB) 100kA/ 2A) (Motorize, UVR, Shuntrip, Closing Coil). 07/03/2022 on 29/03/2022.
STN028-2022-618 3. Under Voltage 3. Reading of the measurement shows UVR and 4. Pending under voltage release coil
Release Coil Closing Coil faulty. and closing coil replacement parts.
4. Closing oil 4. To replace fuse 16A & 2A, Closing Coil and
UVR.
1. 4mm Cable (Red, Black, Green) Burnt 1. Damage report has been submitted
2. 1mm Cable (Red, Black, Green) Burnt to Rapid Rail.
1. Check Fuse F10 from Battery bank. 2. Item received from Rapid Rail on
1. 4mm Cable (Red,
2. Check voltage battery bank. Voltage drop 17/03/2022.
RR PIC : SYAHMI Battery Charger & Black, Green) detected. (Total=87Cell) 3. Plan to replace cable on 29/03/2022
DR-003 Farid WORK ORDER ID: Open LV SRRS (SB) 2. 1mm Cable (Red, 3. Check and found cable burn at battery bank. 07/03/2022 4. Replacement Job Completed on
STN028-2022-621 Battery Cell Black, Green)
4. To replace cable 4mm and 1mm. 29/03/2022.
3. Fuse F10 5. Pending Closure Report to RR.
6. Closure Report Submitted to RR.
7. Job Complete.
Battery Cell Drain Out 1. Damage report has been submitted
1. Measure output charger voltage : 121.4 VDC to Rapid Rail.
(Normal). 2. Plan to retest battery on 29/03/2022.
2. Most battery voltages drop to 0.243 VDC for 3. Test on 29/03/2022 to be reschedule.
each battery cell. Require more information.
3. Battery Cell leaking. 4. Item Received from Rapid Rail on
RR PIC : SYAHMI 4. To replace 87 battery cell. 30/03/2022 for battery retest.
DR-004 Munzir WORK ORDER ID: Open LV Battery Cell SRRS (SB) Battery Cell (87 cell 08/03/2022 5. Retest for battery cell completed and
- KAP 1) found only one battery cell require to
STN028-2022-622
replaced.
6. Replacement Job Completed on
10/06/2022.
7. Pending Closure Report to RR.
8. Closure Report Submitted to RR.
9. Job Complete.
1. 4mm Cable (Red, Black, Green) 3 Set Burnt 1. Damage report has been submitted
2. 1mm Cable (Red, Black, Green) 1 Set Burnt to Rapid Rail.
1. Check and found cable burn from battery 2. Item received from Rapid Rail on
RR PIC : DZAHIR 1. 4mm Cable (Red, charger to battery bank during Preventive 17/03/2022.
WORK ORDER ID: Black, Green) Maintenance. 3. Plan to replace Cable on 24/03/2022.
DR-005 Farid Close LV Battery Cell BDUS(SB) 09/03/2022
STN031-2022-814 2. 1mm Cable (Red, 2. Currently cable has bad insulation. 4. Replacement Job Completed on
Black, Green) 24/03/2022.
5. Pending Closure Report to RR.
6. Closure Report Submitted to RR. Job
Complete.
Fibre Cable Defective Alarm Triggered due to 1. Damage report has been submitted
Faulty Fibre Patch Cord to Rapid Rail.
1. Retighten fibre patch cord cable connections 2. Received item from previous GF2
and carried out vissual inspection. panel on 27/03/2022.
RR PIC : SYAHMI Fibre Patchcord 2. Temperory used other fibre patch cord cable 3. Plan to replace Fibre Optic Patch Cord
DR-006 Hilman WORK ORDER ID: Open 33kV GIS KWDS(SB) Cable (ST-SC and alarm disapppear. 10/03/2022 on 03/04/2022.
STN004-2022-830 Connector) 3. Require to change with new ST-SC Single 4. Replacement Job Completed on
Mode Fibre Optic Patch Cord. 03/04/2022.
5. Pending Closure Report to RR.
6. Closure Report Submitted to RR. Job
Complete.
DPM Meter Display for Genset Unclear Visual. 1. Damage report has been submitted
RR PIC : SYAHMI
DR-007 Munzir WORK ORDER ID: Open Genset Genset KL Sentral Linkway ENTES DPM Meter 1. Visual Checking 13/03/2022 to Rapid Rail.
KLSLINKWAY-2022-4 2. DPM can only display current value. 2. Pending replacement parts.
3. To replace with new DPM Meter.
Surge Diverter (Blue Phase) Faulty 1. Damage report has been submitted
1. Conduct visual inspection. to Rapid Rail. 2. Item received from
Novaris MULTIMOV 2. Measure Voltage input. Voltage OK. Rapid Rail on 16/03/2022. 3. Plan to
RR PIC : DZAHIR Surge Diverters
DR-008 Hilman WORK ORDER ID: Close LV MSB ESC03(NB & SB) 3. Item suspected faulty based on voltage input 08/03/2022 replace SPD on 22/03/2022. 4.
ES03-2022-193 (SD1-150-275-N ) is normal. Replacement Job Completed on
Blue Phase 4. To replace new Surge Diverter due to no 22/03/2022. 5. Pending Closure Report
1. CHINT Stored protection against lightning surge for blue to RR. 6. Closure Report Submitted to
RR PIC : FARHAN
DR-009 Munzir WORK ORDER ID: Open LV MSB SUJS(NB) Energy Motor phase.
1. Stored Energy Motor Faulty 20/03/2022 RR.Damage
1. Job Complete.
report has been submitted
2. CHINT Under 2. Under Voltage Release Faulty to Damage
Rapid Rail.
STN033-2022-769 Voltage Release Auxiliary Transformer Temperatore Controller 1. report has been submitted
1. Check
Did the motorise gear and found the
Not Function 2. Stored
to energy motor replacement job
Rapid Rail.
motorise
1. gearfound
Check and broken.
that the MCB at control completed
2. on 26/05/2022.
Item received from Rapid Rail on
2. Measure reading for
panel is in trip position. undervoltage coil. 3. Pending
16/03/2022. under voltage release
Undervoltage
2. Check power Coil Reading
supply = 0.612kΩ
voltage. Available (242.0 replacement parts.Temperatore
3. Plan to replace
RR PIC : IQBAL Temperatore 3. Require to replace with new Stored Energy
VAC). Controller on 19/03/2022.
DR-010 Farid WORK ORDER ID: Close Auxiliary PER SEMP(SB) 02/03/2022
Transformer Controller (Neuron Motor and Under Voltage
3. Reset MCB but trip again. Release. 4. Replacement Job Completed on
POR001-2022-616 Tech - KN805 4. To replace temperatore controller as item 19/03/2022.
being suspected faulty. 5. Item Replaced. Pending Closure
Report to RR.
6. Closure Report Submitted to RR. Job
RR PIC : IQBAL Complete.
DR-011 Farid WORK ORDER ID: Close LV ESDB-RS SUBD(RSMO) Timer Relay(ANLY Automatic Transfer Switch Does Not Function 13/03/2022 1. Damage report has been submitted
AH3-1) due to Timer Relay Faulty to Damage
Rapid Rail.
DPT001-2022-155677 1. report has been submitted
1. CheckEnergy
Stored and found
Motor that MT timer relay faulty.
Faulty 2. Anly
to RapidAH3-1
Rail. relay has been purchased
2. ACB
1. Temperory
Incomerswap with GT
A cannot timer relay
perform and ATS
auto close. onPending
2. 24/03/2022 by Edinson.
replacement parts.
RR PIC : SYAHMI system backdeltail
to normal. 3. Replacement
Plan to replace
DR-012 Munzir WORK ORDER ID: Open LV MSB BSCS(SB) CHINT Stored 2. Conduct check on stored energy 31/03/2022 3. JobTimer Relay on
Completed on
Energy Motor 3. To replace
motor newthe
and found timer relayenergy motor is
stored 03/04/2022.
28/05/2022.
STN030-2022-643 4. Pending
4. Replacement JobReport
Closure Completed
to RR.on
faulty.
3. Require to replace with new stored energy 03/04/2022.
5. Closure Report Submitted to RR.
motor. 5.
6. Pending Closure Report to RR.
Job Complete.
Step Down Transformer Overheat & Burnt 6.
1. Closure
DamageReport
report Submitted to RR. Job
has been submitted
1. Isolate MCB AC supply to TX. Complete.
to Rapid Rail.
2. Temporarily used DC Supply. 2. Pending replacement parts.
3. Require to replace with new step down 3. Item Received from Rapid Rail on
RR PIC : SYAHMI Step Down transformer. 23/05/2022.
DR-013 Munzir WORK ORDER ID: Open LV Battery Charger SUBS(NB) 05/04/2022 4. Replacement Job Completed on
STN001-2022-703 Transformer
28/05/2022.
5. Pending Closure Report to RR.
6. Closure Report Submitted to RR.
7. Job Complete.
1. Damage report has been submitted
to Rapid Rail.
2. Pending replacement parts.
3. Item Received from Rapid Rail.
RR PIC : DZAHIR 4. Plan to replace OCEF Relay on
OCEF Relay (Mikro OCEF Relay Faulty 19/06/2022.
DR-014 Hilman WORK ORDER ID: Open LV SDB SUBD(RSMO) 07/04/2022
DPT001-2022-158490 MK 1000A -150D) 1. Troubleshoot Relay and try to reset the 5. Item received is from different
alarm.
2. Could not clear alarm indicator light. specification.
3. Relay is faulty and do not function. 6. Item has been returned to Rapid Rail.
4. Require to replace with new OCEF Relay 7. Item Received from Rapid Rail.
(Mikro MK 1000A-150D) 8. Plan to replace OCEF Relay on
1. Stored Energy Motor Faulty 1. Damage report has been submitted
2. Under Voltage Release Faulty to Rapid Rail.
1. Check the motorise gear and and 2. Pending replacement parts.
RR PIC : IQBAL undervoltage coil at Incomer B ACB.
DR-015 Munzir WORK ORDER ID: Open LV MSB TASS(SB) CHINT Stored 2. Found ACB Incomer B cannot auto close. 11/04/2022
STN027-2022-774 Energy Motor 3. After further checking, motorise gear and
undervoltage coil is faulty.
4. Require to replace with new Stored Energy
Motor and Under Voltage Release.
1. Damage report has been submitted
to Rapid Rail.
2. Pending replacement parts.
Stored Energy Motor Faulty 3. Item Received from Rapid Rail.
RR PIC : IQBAL 1. ACB Incomer A cannot perform charging and 4. Plan to replace OCEF Relay on
DR-016 Munzir WORK ORDER ID: Open LV MSB TCOS(SB) CHINT Stored auto close. 11/04/2022 02/06/2022.
STN026-2022-806 Energy Motor 2. Conduct deltail check on stored energy 5. Replacement Job Completed on
motor and found the stored energy motor is 02/06/2022.
faulty. 6. Pending Closure Report to RR.
3. Require to replace with new stored energy 7. Closure Report Submitted to RR.
motor. 8. Job Complete.
Auxiliary Transformer Fan Faulty 1. Damage report has been submitted
1. Disconnect and take motor fan winding to Rapid Rail.
resistance measurement and found 6 motor fan 2. Pending replacement parts.
low resistance reading. 3. Item Received from Rapid Rail.
2. Disconnect capacitor of the fan motor and 4. Plan to replace auxiliary transformer
RR PIC : FARHAN measure the value of capacitors. fan on 22/06/2022.
Auxiliary 5. Replacement Job Completed on
DR-017 Munzir WORK ORDER ID: Open PER Auxiliary Transformer KAJD 3. Found value of capacitor decreasing. 19/04/2022
DPT002-2021-5004 Transformer Fan 02/06/2022.
4. Inspect the cable connection and measure
the resistance. 6. Pending Closure Report to RR due to
5. Change capacitor of the auxiliary transformer no soft copy of work order received.
fan and found item does not working. 7.Job Complete
6. After all inspection, 6 auxiliary transformer
fan is required to replace.
Temperatore Controller for Transformer Faulty
1. The meter readings remain unchanged after 1. Damage report has been submitted
swapping the cable connections to Rapid Rail.
between R-phase and S-phase. 2. Pending replacement parts.
- Reading before swapped 3. Plan to replace Timer Relay on
R =72.3°C 03/06/2022.
S =43.7°C 4. Replacement Job Completed on
T =41.3°C 03/06/2022.
- Reading after swapped 5. Closure Report Submitted to RR.
RR PIC : DZAHIR Digital Temperatore 6. Job Complete.
DR-018 Hilman WORK ORDER ID: Open TPSS Rectifier Trasformer BUBS(NB) Controller Display R =74.4°C 21/04/2022
STN018A-2022-896 (DK P-300C) S =41.9°C
T =41.1°C
2. Retighten the cable connections and did a
visual check.
3. Swapped cable connections between R-
phase and S-phase
4. Currently, the temperatore controller reading
for R-phase is inaccurate and is require to
replace.
Surge Diverter (Blue Phase) Faulty 1. Damage report has been submitted
1. The CE inspector highlights that SPD`s display to Rapid Rail.
inside cubicle 2 is blinking. 2. Pending replacement parts.
2. Did a visual inspection and retightened the
DEG01
ACB CHINTBAE NA1-2000
CBI2410A Faulty BatteryDue Charger Module
RR PIC : SYAHMI
Novaris MULTIMOV cable12170
GPP
Faulty
connections.
Battery Lifetime Drop to Damage
Surge Diverters Parts
3. UPS
1. Measuredbattery the voltage
faulty across panel
forcable
genset each phase
(Bus-Tieon
DR-019 Hilman WORK ORDER ID: Open LV MSB BUBS(SB) One
1.
1.
Battery
Check and Cell Faulty
retighten for outgoing MCB2 11/05/2022
STN018A-2022-907 (SD1-150-275) 1. Air
the
(DGCheckCircuit
SPD.
incoming).
control
Breaker
(R=243.8v,
internal
battery
(ACB) incomer
Y=243.3v,
resistance
3) at ACDB andpanel A cannot
voltage battery
Yellow Phase closed
S=243.2v)
2. UPS by
moduleAuto or
show Manual
(Alert mode.
in each cell.
2.Check
2.
4. LV
The supplyand SB
voltages foundbackup
are battery
by
available. voltagereplace
state:
coupler. drop during
battery)
1. Stored. one
2. Found
troubleshoot cell Motor
Energy faulty (Cell
Faulty 87). V = 0 VDC
3.
3. Inspect
5. There
Check
Temporary is and
and find the
noreset
surge
isolate mechanism
protection
alarm
supply but
from part broken
onindicator
Y-Phase
battery for
bank
2. Under
Reading
CHIINT
inside ofVoltage
Closing
the voltage
ACB Release
drop:
Electromagnet
frame. Faulty
10.18 Vdc
(Closing Coil)
MSB
alarm
to
1. incomer.
load.
Under still
(no appear
redundancy
voltage at UPS module.
for 110 VDC)
RR PIC : DZAHIR
3.
4.
Due
Faulty.
4.
6. ACB
Require
Battery
Require
to low
incomer Acoil
battery
to replace
to replace
voltage cannotand
SPD.
reading
one
under
voltage,
be the
close voltage
(measured):
unit on release
generator
position
ofmechanism
new batteryfor
Fukuda (Nickel for
1. ACB
(DEG1)
Done Incomer
unable
replaced to
by auto & manual operation.B faulty.
operate.
new motorize
DR-020 Munzir WORK
PIC ORDER ID: Open LV Battery Charger IVS2(NB) 26.75Vdc.
cell.
2. 11/05/2022 1. Damage report has been submitted
RR : AHMAD
IVS02-2022-204
BAE CBI2410A
Cadmium Battery) 5. After
4. Require
Coupler
5. If supply
Battery
changeto
A.lifetime
incomernew Bmotorize,
replace one unit
dropfails,
ACB
of
station
to only
BAE cannot
will
25 minutes
auto
CBI2410A
totally
and to Damage
Rapid Rail.
DR-021 farid WORK
RR PIC ORDER
:IQBAL ID: Open Genset Battery Charger SEMP(A) Recharge and close.
battery
2. When
blackout charger
conducted module.
on LV Recharge
side. a functionality test, ACB did 13/05/2022 1. report has been submitted
ACB CHINTModule
NA1- BAE
8
3. CBI2410A
seconds. andand Continuity 2. Pending replacement parts.
DR-022 farid POR001-2022-661
WORK
RR PIC ORDER
: SYAHMIID: Open LV MSB BAUS(SB) Continuity
2000 6. Found
not autoFaulty
Require
Module
6. Require
under
close. voltage
to replace
to replace new
2
coil
unitACB
under voltage
Immediately.
of GPP 12170 13/05/2022 to
1. Rapid Rail.
3. Damage reportfrom
Item Received has been
Rapidsubmitted
Rail.
STN009-2022-618 1. CHINT Under release
3. Found
Schneider faulty.
closing
Digital coil
Power faulty.
Meter (Easy Logic PM 2.
to Pending replacement
RapidtoRail. parts.
DR-023 farid WORK
RR PIC ORDER
: IQBAL ID: Open Genset Genset Bustie SEMP(B) GPP 12170 Battery CHINT
1. The
Battery.
4. The
Require Under
battery Voltage
charger
to replace Release
panel
under Faulty
(DEG4)
voltage shows
releaseinand 18/05/2022 1.
4. Damage
Plan report battery
replace has been submitted
cell on
4. ACB 3. Pending
Plan to replace Timer Relay on
DR-024 Munzir POR001-2022-662
WORK Voltage Coil 1200)
1.
indicatorFaulty
Checked offor
and Coupler
retightened
battery A cannot
charger cableoperates
Faultyfail.
connections. 2.
to replacement
Rapid Rail.
24/06/2022.
1. Damage
parts.
report has been submitted
RR PIC ORDER
: IQBAL ID: Open LV MSB SURS(NB) CHIINT
2. CHINTClosing
Under under
Battery
auto
1.
2. ACB
Check
voltage
mode
Checked Charger
for the and coil.
Incomer Card
retightened
voltage B reading
cannot the
auto cable
trip when
at Recharge and
30/05/2022 28/05/2022.
2. Pending replacement parts.
STN028-2022-674 1. 5.
to Closure Report
Rapid Rail.
4. Damage
Replacement Submitted
Job to
Completed RR.
on
DR-025 Hilman WORK
RR PIC ORDER
: IQBAL ID: Open LV MSB TASS(SB) Electromagnet
Voltage Release 5. Unable
Requireto
connections.
under-voltage
Continuity to run – 1000kVA
replace
occurs.
Module. Closing
There
mobile
Coil.
iswear
no
genset.
reading 09/06/2022 1.
3. Item report
Received has
from been
Rapidsubmitted
Rail.
CHINT
(ClosingUnder 2. Found that fuse’s holder 6. Pending
2. Job Complete.
03/05/2022. replacement parts.
DR-026 Hilman STN027-2022-828
WORK
RR PIC ORDER
: QAHHARID: Open LV MSB TCOS(SB) Coil)
Fukuda (Nickel 2.
3. Measured
at Require
the output to the input
replace
voltage. voltage
under
Voltage of and
voltage
reading
tear
therelease.
meter
= 0.64 V 09/06/2022 to
1.
4. Rapid
Damage
Plan toRail.
report battery
replace has beenonsubmitted
Voltage Release (UnableVAC).
(243.7 to replace new fuse) Fuse rating (250v- 5. Pending
2.
to Closure
Rapid Report Submitted
replacement
Rail. to RR.
parts.
DR-027 Farid STN026-2022-859
WORK 3. Use portable
Fukuda charger asBattery)
(Nickel Cadmium temporary KAPaction
2 to 17/06/2022.
1. Damage report has been submitted
RR PIC ORDER
: AHMAD ID: Open LV Battery Charger KWDS(SB) Cadmium Battery) 5A).
3. DPM Metervoltagedisplay drop.does not show any value.
10/06/2022 6.
2. Job Complete.
Pending replacement parts.
DR-028 Farid STN004-2022-946
WORK Battery
KAP 2 Charger avoid
Bloated
FUKUDA batteryNickel Cadmium (KAP1) Faulty 4. Damage
to
1. Replacement
Rapid Rail. Job
report hasCompleted on
been submitted
RR PIC ORDER
: FARHANID: Open Mobile Genset Battery Charger KAJD Schneider
Card Digital 3.
4.
4.
Require
Require
Unable
1. Measure
Found that
to replace
to replace
tovoltage
start
batterygenset
new battery
Schneider
in fully
charger
Digital
auto Power
mode.
card. 12/06/2022
17/06/2022.
DPT002-2022-5825 1.
1. CHINT Under forcell
Voltage
inflatable
each
Releasebattery. during
Faulty
2.
to
1.
Pending replacement parts.
Rapid Rail.
DR-029 Hilman WORK
RR PIC ORDER
: IQBAL ID: Open LV MSB KWSS(SB) Power Meter (Easy
BAE CBI2410A Meter
5.
2. Require
visual
Found
(Easy toLogic
inspection
one replace
battery
PM 1200)
one
(preventive
faultyunitmaintenance).
of BAE
Vdc) CBI2410A
15/06/2022 5. Damage
3. Closure
Item reportfrom
Report
Received has been
Submitted
Rapidsubmitted
to RR.
Rail.
DR-030 Farid STN005-2022-843
WORK Logic PM 1200) 2. CHINTreading Under Voltage Coil(0.59
Faulty 2.
to
1.
Pending
Rapid replacement
toRail.
6. Damage report OCEF
parts.
has been submitted
RR PIC ORDER
: SYAHMIID: Open Genset Battery Charger SEMP(B) Recharge and battery
2. Require
3.
1.
Take charger
ACB Incomer
module.
at
to replace inflatable
one new battery
FUKUDA cell.Kap 1 17/06/2022 4. Job
PlanComplete.
replace Relay on
POR001-2022-688 FUKUDA
CHINT Nickel
Continuity
1. Module
Under Voltage drop to B0.92 cannot
Vdc.auto close. 2.
to Pending replacement parts.
Rapid Rail.
20/06/2022.
1.
DR-031 Hilman WORK
RR PIC ORDER
: QAHHARID: Open LV Battery Charger SUJS(SB)
Cadmium
Voltage (KAP1)
Release
battery cell.
2. Found under voltage coil and under voltage
3. Require to replace one new Fukuda (Nickel
25/06/2022 3. Damage
2.
5.
reportfrom
Item Received
Pending
has been
replacement
Replacement Job Rapidsubmitted
Rail.
parts.
Completed on
DR-032 Munzir STN033-2022-856
WORK to
1. RapidtoRail.
Damage report has been submitted
RR PIC ORDER
: FARHANID: Open LV MSB SEMP(NB) Closing
2. CHINTBlock
Under release faulty.
Cadmium Battery) KAP 2
24/06/2022 4. Item
3. Plan replace
Received
20/06/2022.
2. Pending
OCEF
from
replacement
Relay
Rapid on
Rail.
parts.
DR-033 Farid STN014-2022-632
WORK ORDER ID: Open 33kV GIS SSU SEMP Magnet with Closing Block Magnet with Rectifier TR1 Faulty 13/07/2022 to
4. RapidtoRail.
07/07/2022.
1. Damage
Plan reportfrom
replace has been
OCEF submitted
Relay onRR.
Voltage Coil 6.
3. Closure
Item Report
Received
2. Replacement
Pending Submitted
replacement Rapid to
Rail.
parts.
DR-034 POR001-2022-720 Rectifier TR1 1. Troubleshoot Panel HB2 due to breaker 5.
to Rapid Rail.
22/06/2022.
7. Job Complete. Job Completed on
4. Plan to replace OCEF Relay on
07/07/2022.
cannot closed. 2.
5. Pending replacement
Replacement
20/07/2022. parts. on
Job Completed
DR-035 2. Found that closing lock magnet with rectifier 6. Closure Report Submitted to RR.
22/06/2022.
5.
DR-036 TR1 at panel HB2 faulty. 7. Replacement
6. Job Complete.
Closure Report
Job Completed on
Submitted to RR.
20/07/2022.
DR-037 3. Temporary swap closing block magnet at 7. Closure
6. Job Complete.
Report Submitted to RR.
DR-038 Panel HB4 (Spare Feeder). 7. Job Complete.
4. Require to replace one unit of closing block
DR-039 magnet.
DR-040
DR-041
DR-042
DR-043
DR-044
DR-045
DR-046
DR-047
DR-048
DR-049
DR-050
DR-051
DR-052
DR-053
DR-054
DR-055
DR-056
DR-057
DR-058
DR-059
DR-060
DR-061
DR-062
DR-063
DR-064
DR-065
DR-066
DR-067
DR-068
DR-069
DR-070
DR-071
DR-072
DR-073
DR-074
DR-075
DR-076
DR-077
DR-078
DR-079
DR-080
DR-081
DR-082
DR-083
DR-084
DR-085
DR-086
DR-087
DR-088
DR-089
DR-090
DR-091
DR-092
DR-093
DR-094
DR-095
DR-096
DR-097
DR-098
DR-099
DR-100
DR-101
DR-102
DR-103
Pending Troubleshoot List
No. EP PIC Status System

1 Hilman Open 33kV

2 Farid Open 33kV

3 Farid Close 33kV

4 Hilman Open Genset

Pending Troubleshoot List


No. EP PIC RR PIC & Work Order ID Status System
FR-001
nding Troubleshoot List
Panel Location Failure Description Date Reporting Progress
To Plan Date
LM2 - Breaker After MMJV
GIS KWDF (SB) cannot close using 10/03/2022 Cable
selector switch. Rectification
Work
To Plan Date
After MMJV
LM4 - Breaker
Cable
GIS BTHS (SB) cannot close using 16/03/2022
Rectification
selector switch.
Work
To Reschedule
LM2 - Breaker Job Completed -
GIS BSCS (SB) cannot close using 25/03/2022 Retighten Every
selector switch. Cable
BAE could not Connection
charge due to
Battery Charger SEMP (Room 1) 25/05/2022
battery bank drain
out.

nding Troubleshoot List