You are on page 1of 4

U AUNG MYO WIN

Address - Khat Tar Road,Shwe Lin Ban Industry Zone,Hlaing


Tharyar Town Ship,Yangon.
Contact Number - +959788272961,+959962478349
Email - aungmyowin070321@gmail.com

PERSONAL DETAIL
Name : U AUNG MYO WIN
Date of Birth : 12.10.1992
Nationality : Myanmar
Race : Burma
Religion - Buddhist
Gender - Male
Marital Status - Married
Language - Myanmar/ English
NRC NO - 7/Ya Ta Na (Naing)123070
Applied Post -Senior Electrical Engineer
Expected Salary - 400$

EDUCATIONAL BACKGROWN
B-Tech, BE (Electrical Power) (2016)
Pyay Technological University

OTHER QUALIFICATION
- Computer Basic Course (Microsoft Word, Microsoft Excel, Microsoft Power Point)
- Auto CAD (2D, 3D & Isometric)
- Intermediate English
- Advanced Electrician Training Course (Electrical Inspection Department)
- Motor Control,VFD,.etc
- I can work with foreigners.I can speak English.
STRENGTHS
- Self Confidence in every challenges.
- Willing to work a team.
- Critical thinking, Good common sense and self-motivated.
- Able to multiple assignment under high pressure and consistently meet tight deadline.
- Flexible and can easily adapt to learn new technology at any situation.
- Able to work done on time.

WORK EXPERIENCE

Electrical Site Engineer (1.10.2016 To 30.10.2018) , 2 Years

Royal Onyx Engineering Co.,Ltd

Myingyn No(1) Steel Mill Project,Myanmar Parfun Project,Royal Thukha Condominium

Project,Car Industry Project.

Lighting,Socket, Industrial Socket,Single Phase motor,Three Phase Motor connection,Tray&

Trunking installation,Isolator Switch,PVC Pipe&GI Pipe installation,Exit Lamp,Wall Lamp,

Security Lamp,High Bays Lamp, Fluorescent,LED Lamp, Strip Light installation,Earthing,

Lightning Arrester installation,Panel Installation with Breaker,Motion Senser,Light Senser,

Control, Timer installation ,Panel Wire Termination, Alarm System & Smoke Detector

installation,Neutral &System Earth installation,Electrical fault troubleshooting,Ammeter,Volt

meter selector switch installation,Stabilizer , Generator & ATS Main Panel wire installation,

Electrical 2D plan drawing& single line drawing making with computer, I discuss my

manager & supervisor all electrical problems.

Electrical Site Engineer (1.11.2018 To 30.4.2019),6Months

Winner Engineering Co.,Ltd

Japfa Comfeed Myanmar Pte.,Ltd Project.


Lighting,Socket,industrial Socket,Single& Three Motor Termination,Temperature sensor,

Trunking installation,Panel installation,Earthing & Lightning Arrester installation,400V Line

Installation,Fiuorescent,Lamp,Htoon,Alarm installation,Fan installation,ATS & Generator

Main wire installation,Electrical fault trouble shooting,Control Panel installation,Neutral &

System Earth Installtion,Earth testing,Magger insulation testing for single&three Phase motor

I discuss my manager& foreinger all electrical problems.

Electrical Maintenance Supervisor (1.5.2019 To 1.11.2019 ) 6 Months

South Land Myanmar Co.,Ltd

Lighting,Single &Three Phase Motor Termination, Project Drawing Looking, Tray Line

Trunking making, Socket, Htoon, Alarm Connection, Earthing,Lightning Arrester Volt

&Ammeter Selector Switch Connection, ATS Main Cable Termination,Panel inatallation

Direct Online,Star-Delta,Forward&Reverse,VFD,Timer,Relay installation,Generator Main

Cable Termination,Light&Motion Sensor Connection,Neutral & Earth installation , Earth

Testing,Magger insulation testing for single & Three Phase Motor,Water Pump Motor Wire

Installation,Temperature Sensor installation,I checked electrical,aircon ,plumbing&sanitary

with contractors ,Electrical fault trouble shooting, Electrical Single line drawing,I discuss

my manager& foreinger all electrical problems.

Electrical Maintenance Supervisor (3.11.2019 To 5.5.2020) 6 Months

Double Packing Myanmar Co.,Ltd

Total = 3 Years and 6 Months


Single & Three Phase Motor Termination, Socket & Lighting Termination, Panel Installation,

Temperature sensor, Temperature Controller, Plastic Machine, Direct Online,Star-


Delta,Forward &Reverse, VFD, Timer ,Relay,AC –DC Convector Installation,Electrical
Fault Trouble Shooting, Water Pipe Installation,Water Pump installation, Volt
Meter&Ammeter Installation, Transformer Oil checked every months, Air Conpressor
Installation,I discuss foreinger all electrical problems.Fan Installation.PNP & NPN
Sensor,Single & Three Phase Breaker Installation, Limit Switch Installation,

REASONS FOR LEAVING


- I would like to try in new environment to get new experiences.
- I would like to upgrade my future and engineering knowledge.

Thank you for your attention.


The information contained in this application is a true, complete and accurate account.
Yours Faithfully
U Aung Myo Win

You might also like