WORK EXPERIENCE ABOUT ME


2 Years and 6 Months A skilled electrical engineer with inherent leadership abilities, project
management skills and extensive on-site and project experience in Oil and
AGE
24 Gas experience/ Solar Power Plant. Being a goal oriented person and a team
player, can work well under pressure to deliver result.

Education

Bachelor of Technology (ELECTRICAL) Graduated, June 2016


BP Poddar Institute of Management and Technology Percentage of Marks- 81%
West Bengal University of Technology Division : First
Kolkata, West Bengal
Higher Secondary Graduated, May 2012
A.D.L.S Sunshine School Percentage of Marks- 90%
ICSE Board Division: Distinction
Jamshedpur, Jharkhand
Secondary Graduated, May 2010
A.D.L.S Sunshine School Percentage of Marks- 88%
ICSE Board Division: Distinction
Jamshedpur, Jharkhand

Professional Vocational Training

 POWER TRANSMISSION SYSTEM


Industry Name: WBSETCL (BEHALA JOKA SUBSTATION), Kolkata
nd th
Period: 2 January to 16 January 2015 (Two weeks)
 POWER GENERATING STATION
Industry Name: N.T.P.C (Farakka), West Bengal
th th
Period: 16 May to 13 June 2015 (One month)
Skills

 Planning and Supervision


 Team work
 Manpower Management
 Effective Communication
 Inspection

Work Experience
May 2018 to till date
Site Engineer (Electrical) – Substation Control and Installation, cable laying, termination and Site execution.
RR POWER SOUTION

Project: 4.9 MW Solar Power Plant, Sangola, Maharashtra


Client: Mitcon Consultancy and Engineering Services Pvt Ltd.

Key Responsibilities
 Erection and Commissioning of 33/0.55kV 5.6 MVA Power Transformer (Make: Raychem).
 Installation of 33kV Switchgear (Make: Schneider), ACDB and PLC panel.
 In this project I supervise laying of 85m HV cable (3CX300 sq mm, 11 kV earthed, Polycab make).
 HV, LV, Control cable laying and Termination.
 Indoor and Outdoor Lighting and Overall Earthing of Plant.
 110V Battery and battery charger Installation.
 Review of AFC drawings for Grid Stations, Switchgears, HV cable laying & terminations and Control-
protections of the Substation equipments.

Project: 40 MW Solar Power Plant, Padampur, Orissa.


Client: General Electric (Transmission & Distribution limited).

Key Responsibilities
 Erection and Commissioning of 132/11kV 40 MVA Power Transformer (Make: Voltamp, Sl.No: JN: 22823).
 Installation of 11kV Switchgear (10 no’s Make: Schneider), 132 kV Control and Relay panel, RTCC panel,
ACDB and PLC panel.
 Erection and Commissioning of 10 No’s of 11/0.55kV 4 MVA Transformer (Make: Raychem).
 In this project I supervise laying of 14km HV cable (3CX300 sq mm, 11 kV earthed, KEC MAKE).
 HV, LV, Control cable laying and Termination.
 22 NOS 3CX300 sq mm Straight Joints, Indoor and Outdoor End termination.
 Indoor and Outdoor Lighting and Overall Earthing of Plant.
 110V Battery and battery charger Installation.
 Review of AFC drawings for Grid Stations, Switchgears, HV cable laying & terminations and Control-
protections of the Substation equipments.
 Installation of other equipments of 132kV Switchyard and their control wiring.
 Overall supervision of construction, erection and commissioning work of electrical distribution system at
site, solution of technical problems, monitoring of site work.

June 2016 – April 2018


Electrical Engineer
POWERGEN TECHNICAL SERVICES
Project: Electrical Work
Client: Indian Oil Corporation Limited (Digboi Refinery).
Duration: June 2016 – March 2017

 Installation of 6.6 kV Switchgear (3 no’s Make: Siemens).


 HV, LV, Control cable laying and Termination for the above switchgear.
 Indoor and Outdoor Lighting and Transformer Earthing.
 Preparation of Electrical Load list and Single Line Diagram (SLD).
 Relay setting & co-ordination.
 Proposing modification in load shedding, protection scheme.
 Equipment sizing for transformer, current transformer, potential transformer, Circuit breaker &
underground cables etc.
 Selection of switchgear & different electrical equipment based on different ratings
 Prepares Bill of Material (BOM) based on the electrical drawings.

Project: Electrical Work


Client: Indian Oil Corporation Limited (Barauni Refinery).
Duration: June 2016 – March 2017

 Erection and Commissioning of 2 No’s of 11/0.433kV 2 MVA Transformers.


 In this project erection of 1 no of auxiliary transformer (100 kVA Make: Power ware).
 Cable laying and terminations and coordination with Testing and commissioning team.
 Indoor and Outdoor Lighting.
 Preparation of Electrical Load list and Single Line Diagram (SLD).
 Relay settings and relay coordination studies covering transformer, motor and bus bar protections, back up
over current and earth fault protection coordination and settings at all 33kv, 11kv, 6.6kv, 3.3kv and 415 v
incomers and all out going feeder of the electrical system.
 Prepares Bill of Material (BOM) based on the electrical drawings.

Computer Proficiency
 Operating Systems: Microsoft Windows 98/2000/XP/Vista/7/8/10.
 Project Scheduling: MS Project.
 Designing: AutoCAD
 Proficient: Ms Excel, Word, PowerPoint.
Languages
 English
 Hindi

Personal Interests

 To know about other's past experiences and learn from them.


 To know about the new invention in science & technology.
 Travelling and cooking food.

Personal Details

 Father’s Name :Md Nasim Ansari


 Marital Status :Single
 Birthday :March 25, 1994
 Gender :Male
 Permanent Address : H.no-11, Rd.no-27, B Block
Noor Colony, Mango, Jamshedpur,
Jharkhand-832110, India

Passport Details

 Passport No. : R4496339


 Date of Issue : 27.11.2017
 Date of Expiry : 26.11.2027
 Place of Issue : Ranchi

Declaration
I, hereby declare that the information contained herein is true and correct to the best of my knowledge and belief.

_________________________
Mohammad Farhan Nasim

Sangola, Maharashtra
Nov 7, 2018