Professional Documents
Culture Documents
Quality Mis July2020
Quality Mis July2020
3 Best Practices
4 Concrete Details
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
Total
Others
Labours
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
DETAILS OF MA
PROJECT :
Date of Date of
Sr.
Month Material Material Type of Material
No.
Receipt Rejected
Rejected Quantity
Quantity Received Material
Description of Material Rejected Reason for Rejection
(MT/ Sqft / (MT/ Sqft / Rejected By
Nos) Nos)
NA NA 200 PCS NA NA
NA NA 2500 LTR NA NA
NA NA 1150 NO. NA NA
NA NA 200 PCS NA NA
NA NA 7000 LTR NA NA
NA NA 2 MT NA NA
NA NA 2800 LTR NA NA
NA NA 272 SHEETS NA NA
NA NA 19636 RFT NA NA
NA NA 300 BAGS NA NA
NA NA 707 CFT NA NA
NA NA 707 CFT NA NA
NA NA 233 CFT NA NA
% Material
Procured
Rejection Remarks
By
Per Month
CBPL NA MAKE-SOMANY
1 False Ceiling For Toilet 15.06.2020 15.06.2020 Tower A 1st Floor Unit
101 Toilet
2
3
4
5
6
7
8
9
10
11
K-UP ACTIVITIES
- Sunil Sharma
BEST PRACTICES LOG
PROJECT :
BEST PRACTICES
S. No. Issue Month Date Trade Area/Location Description
G
Benefits of
Issued by Remarks
Best Practice
To be filled in
Site QAQC/Co
by Project
QAQC/Site
Head if
Exec.
required
PROJECT :
Consumption factors of Site Batching Plant for the month (kg/m 3 of concrete)
20mm Coarse
Admixture Water Month (cum) Project (cum) Min.
Aggregates
28 Days Compressive
Strength (MPa) Standard
Deviation for
28 Days Remarks
Compressive
Strength
Max.
External Testing Det
S. No. Description of Material to be Manufacturer Batch No. Material Material Reciept
Tested Reciept No. Date
nal Testing Details of Materials/Product
Date of Testing Description of Tests Conducted Contractor Report No. Name of External
Testing Lab.
Conformity Status Remarks