You are on page 1of 3

NATIONAL HIGHWAY AUTHORITY OF INDIA

MAINTANANCE OF BANGALORE-HOSKOTE-MULBAGAL SECTION FROM KM:237+700 TO KM:318+000 OF NH-4 IN THE


STATE OF KARNATAKA UNDER NHDP PHASE IIIA ON BUILD,OPERATE AND TRANSFER (BOT) BASIS.

Client : National Highway Authority Of India.


Consultant :

Concessionaire : Lanco hoskote highway Pvt Ltd.


EPC Contractor : Lanco Infratech Limited.
Laboratory : Kolar

BULK DENSITY OF FINE AGGREGATE


Lab Job No. - Date of Sampled 10 /12/ 2007

Location/Source (km) Devarayanahalli Date of Testing 11 /12/ 2007

Type of Material Sand Sampled by Mr. Masthan Roa / Mr. Chinnavali

Proposed Use Concrete & F.D.T Tested by Mr. Masthan Roa / Mr. Chinnavali

Description of Test Trail I Trail II Trail III Average

Wt. of Empty Cylinder in 'gm' (A) 3403 3403 3403 3403

Wt. of Cylinder with sample in 'gm' (B) 8357 8363 8355 8358

Wt. of sample in 'gm' (B-A) 4954 4960 4952 4955

Volume of the Cylinder in 'cc' (C) 2940 2940 2940 2940

Bulk Density (in gm/cc) (B-A)/C 1.685 1.687 1.684 1.685

Remarks:

Contractor Representative Concessionaire Representative Consultant Representative

Date Date Date


National Highways Authority of India

Project : "4 Lanning of Saoner - Dhapewada - Kalmeshwar - Gondkhairi, NH-547E, Package-II from Km 4.700
to Km 33.575 in the state of Maharashtra on EPC Mode"

Client National Highways Authority of India

Authority Engineer Theme Engineering Pvt.Ltd.

EPC Contractor M/S Dilip Buildcon ltd.

BULK DENSITY OF AGGREGATE


As Per IS 2386 (Part 3)

Lab Job No. Date of Sampling

Location/Source (km) Date of Testing

Type of Material Sampled by

Tested by

Description of Test Trail - I Trail - II Trail - III Average

Weight of Empty Cylinder in (gm) (A)

Weight of Cylinder with sample in (gm) (B)

Weight of sample in (gm) (B-A)

Volume of the Cylinder in (cc) (C)

Bulk Density in (gm/cc) (B-A)/C

Remarks:

EPC Contractor's Representative Authority's Engineer Representative

You might also like