REPORT ON SUBSOIL INVESTIGATION FOR THE PROPOSED C/O
Building For AIIMS At Deoghar in (Jharkhand)
Table 1. FIELD TESTS RESULTS & OBSERVATIONS Table 2. RESULTS OF LAB TESTS
Trx.comp.test
Sp.gr. Bulk Moist. Atterberg's Uniax. Cohe- Ang. of Compr.
TCR *
limits Compr. sion int.fric. Index
RQD
(solids) dens.
cont.
Depth SPT 'N' values Visual description and Sample Gs g m LL PL Str. c F Cc
(m) Obs. IS Classification of soil No. & type g/c.c. % % % % % Kg/cm2 kg/cm2 deg.
Table 1. FIELD TESTS RESULTS & OBSERVATIONS Table 2. RESULTS OF LAB TESTS
Trx.comp.test
Sp.gr. Bulk Moist. Atterberg's Uniax. Cohe- Ang. of Compr.
TCR *
RQD
(solids) dens. cont. limits Compr. sion int.fric. Index
Depth SPT 'N' values Visual description and Sample Gs g m LL PL Str. c F Cc
(m) Obs. IS Classification of soil No. & type g/c.c. % % % % % Kg/cm2 kg/cm2 deg.
Borehole : 2 Borehole : 2
0.0
1.5 13 2.62 1.87 32.9 NP
2.5 NP
3.0 15 2.62 1.86 33.8 NP
4.0 NP
4.5 33 NP DS 0.00 33.4
5.5 Reddish grey grevelly NP
SM
6.0 47 silty sand NP
7.0
NP
DS 0.00 33.4
7.5 50
8.5 NP
9.0 53 2.61 1.82 36.3
9.5
10.0
10.5 67 DS 0.00 33.8
11.0
11.5 Light grey grevelly silty
12.0 74 SP- 2.61 1.80 36.8
sand SM
12.5
13.0 (weathered Rock)
13.5 >100
Soiltech Consultants
Appendix-B2 House No. 42, Road No. 2, Nehru Nagar, Patna – 800 013 Job No.190107
REPORT ON SUBSOIL INVESTIGATION FOR THE PROPOSED C/O
Building For AIIMS At Deoghar in (Jharkhand)
Table 1. FIELD TESTS RESULTS & OBSERVATIONS Table 2. RESULTS OF LAB TESTS
Trx.comp.test
Sp.gr. Bulk Moist. Atterberg's Uniax. Cohe- Ang. of Compr.
TCR *
limits Compr. sion int.fric. Index
RQD
(solids) dens. cont.
Depth SPT 'N' values Visual description and Sample Gs g m LL PL Str. c F Cc
(m) Obs. IS Classification of soil No. & type g/c.c. % % % % % Kg/cm2 kg/cm2 deg.
14.0
14.5
15.0 >100
DS 0.00 34.3
NP = Non Plastic, DS = Direct Shear Test, UU = Unconsolidated Undrained Test
Soiltech Consultants
Appendix-B2 House No. 42, Road No. 2, Nehru Nagar, Patna – 800 013 Job No.190107