You are on page 1of 1

REINFORCED

CONCRETE BEAM
LINE OF ALUMINUM
FRAME (INTERIOR PART)
12mm THK. GYPSUM BOARD
0.20m ON LIGHT GAUGE METAL
FRAME SUPPORT SYSTEMS
(FLAT LATEX PAINT FINISH).
DETAIL 1 REINFORCED
CONCRETE SLAB
DETAIL 1
CHB WALL PARTITION
0.40m 0.7
SECOND FLOOR LINE

0.70m

0.20m 0.90m
LOWEST PORTION OF RC BEAM

3.80m
CEILING LINE PROPOSED CEILING LINE

2.70m
CEILING CAVITY
GROUND FLOOR LINE CONVENTION HALL 1 HALLWAY
SECTION A
0.70m
REINFORCED
CONCRETE BEAM
CHB WALL PARTITION DETAIL - 2
0.7m
SECOND FLOOR LINE
LOWEST PORTION OF RC BEAM 12mm THK. GYPSUM BOARD ON
PROPOSED CEILING HEIGHT LIGHT GAUGE METAL FRAME
SUPPORT SYSTEMS. (FLAT
3.8m

CEILING LINE DETAIL 2 LATEX PAINT FINISH).

2.7m
CEILING CAVITY
GROUND FLOOR LINE CONVENTION HALL - 1
25 24
SECTION B
PARTIAL CEILING PLAN GROUND FLOOR LEVEL

You might also like