6
Giving direction Y N Y N
towards the weigh Safety Hazard: While
scale. taking out the hook, it
may hit the person on
way. Operator may
come in contact with
6 other FG equipment/
Wooden saddle/
packaging material.
B RM HANDLING
Y N Y N Health Hazard:NIL
Safety Hazard: Strap
Cutting the radial may hit if he is not
1 standing at opposite
strip of the RM.
side of cutting
Y N Y N Health Hazard:NIL
Placing the RM Safety Hazard: Coil
2 above & in between May topple if the
2 RMs. placement is not
proper.
Y N Y N Health Hazard:NIL
Safety Hazard: Leg
Coil Seaching cramp may happen if
3 apprached on uneven
through RM area
floor without noticing
ID/OD Scrap
F
HANDLING
Bringing of nylon Health Hazard:NIL
belt by
1 carryinging it Y N N N Safety Hazard:
from its place of
keeping.
Health Hazard:NIL
Insertion of belt
2 through the edge Y N N N
of the sheets. Safety Hazard: Belt
may slip
Health Hazard:NIL
Pulling of belt for
3 insertion in other Y N N N
side edge. Safety Hazard:
Health Hazard:NIL
Loading 2-3 slings
4 Y N N N
at a time. Safety Hazard:
Health Hazard:NIL
Providing 2-3
5 slings towards the Y N N N
truck. Safety Hazard:
Health Hazard:NIL
Placing the ID/OD
6 Y N N N
scrap on the truck. Safety Hazard:
Health Hazard:NIL
The driver boards
7 Y N N N
on the truck. Safety Hazard:
Health Hazard:NIL
Releasing the belt
8 from the side Y N N N
edges. Safety Hazard:
Health Hazard:NIL
Sometimes by just
hoisting up the
9 Y N N N Safety Hazard:
crane the belt is
released.
Health Hazard:NIL
Keeping the belt
10 Y N N N
in its place. Safety Hazard:
G Coil Packaging
Y N N N Health Hazard:NIL
Safety Hazard: Sheets
may damage if the
placement is not
proper on wooden
donnage. Sheets may
Placing sheets on hit person placing
wooden donnage. HDPE and LDPE on
1 Sheets packet. Crane
Placing all
packaging items. operator may get
injured if sharp edges
may come in contact
with body parts.
Consequences: Numerous Fatalities-100, Multiple fatalities-50, Fatalities-25, Serious Injury-15, Casulty Treatment-05 & First ai
Probability (P): Almost possible-10, Quite Possible-6, Unusual but possible-3, Remotely possible-1, Very unlikely-0.5 & Practically impos
Exposure (E): Continuous-10, Frequent-06, Occasional-03, Infrequent-02, Rare-01& Very Rare-0.5
Risk Score: Multiplication of values of the three ( C x P x E ) - Risk score < 200 - Acceptable. Risk Score > 200 - Not Acceptable
Risk Score bands - VH- Very high risk >400, H-High risk 200-400, S- Substantial Risk 80-200, M-Moderate risk 20-80,A- Probably accept
Risk Acceptability - Acceptable - A, Not Acceptable (Emergency measures are required) - NA
S-Safety, H-Health, B-Behaviour, E-Ergonomics
Dated - 06.03.2020
Revision No- 00
Evaluation
Affacted
Risk Level
Potential /Persons
D/I R/ NR N/Ab/Em (VH/HS/M
Harm C E P Score (Anexure-
/A)
I)
NIL D R N 15 1 3 45 A NA
Physical
Injury/Mat
erial
Damage
NIL D R N 5 1 1 5 A NA
Physical
Injury
NIL D R N 15 1 1 15 A NA
Physical
Injury
D R N 5 1 1 5 A NA
NIL
Physical
Injury
D R N 5 3 1 15 A NA
NIL
Physical
Injury
D R N 5 3 3 45 A NA
NIL
Physical
Injury
D R N 5 1 3 15 A NA
NIL
Physical
Injury
D R N 5 1 1 5 A NA
NIL
Physical
Injury
D R N 5 3 3 45 A NA
NIL
Physical
Injury
D R N 5 1 1 5 A NA
NIL
Physical
Injury
D R N 5 1 1 5 A NA
NIL
Physical
Injury
D R N 5 1 1 5 A NA
NIL
Physical
Injury
D R N 5 1 1 5 A NA
NIL
Physical
Injury
NIL D R N 15 1 1 15 A NA
Physical
Injury
O Admin
Control
SSOP-Crane ,
SSOP-loading ,
SSOP-loading
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control SSOP-Crane ,
SSOP-S&L
O Admin
Control SSOP-Crane ,
SSOP-S&L
O Admin
Control SSOP-Crane ,
SSOP-S&L
O Admin
Control SSOP-Crane ,
SSOP-S&L
O Admin
Control SSOP-Crane ,
SSOP-S&L
O Admin
Control SSOP-Crane ,
SSOP-S&L
O Admin
Control SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
O Admin
Control SSOP-Crane ,
SSOP-S&L
O Admin
Control
SSOP-Crane ,
SSOP-S&L
Plant Head: B.K.Dey
HAZARD IDENTIFICATIO
Putting up of Health
rods for Hazard:NIL NIL
support the
Safety Hazard: Physical
4 coil in the coil Y N N N Injury/Mat
coil may fall
car erial
during the man
movement Damage
Feeding of Health
coil to the Hazard:NIL NIL
uncoiler
5 Y N N N
Feeding of
coil to the
uncoiler
Safety Hazard: 1. Physical
Coil may slip Injury/Mat
from expandable erial
uncoiler Damage
5 Y N N N 2. Human body
may get damaged
if comes in coil
motion path
Positioning of Health
coil centre Hazard:NIL NIL
along with
Safety Hazard: Physical
the Machine Injury/Mat
Coil may slip
centre erial
from uncoiler &
6 Y N N N Damage
may harm
somebody
working at that
place.
Start Health
hydraulic Hazard:NIL NIL
pump &
Safety Hazard:
7 lubricating Y N N N Pumps may run at
pumps of
either no or less
uncoiler
pressure
flattener &
shearing
Cutting ofunit Health
circum strap Hazard:NIL NIL
from the
8 Y N N N Safety Hazard: Physical
slitted coil
Cut Strap may hit Injury
the person
Loosing of Health
brake Hazard:NIL NIL
Safety Hazard: Physical
9 Y N N N For manual break Injury
loosing body part
may get affected
Adjust Health
vertical guide Hazard:NIL NIL
roll Safety Hazard: Physical
Intetferance Injury/Mat
between machine erial
14 Y N N N Damage
element(hyd
hoses) & body
motion path
Cheching of Health
the burr Hazard:NIL NIL
Safety Hazard: Physical
18 Y N N N May cause injury Injury
if checked with
hands
Changing of Health
shearing Hazard:NIL NIL
blades Safety Hazard: Physical
19 Y N N N Hand may get cut Injury
if not handled
properly
Clearance Health
adjustment Hazard:NIL NIL
Safety Hazard: Material
20 Y N N N May damage the damage
finger if not done
properly
Health
Hazard:NIL NIL
Adjust Safety Hazard: Length
21 measuring Y N N N May cause length variation/
variation if not Material
roll pressure
properly adjust. damage
Health
Hazard:NIL NIL
Set the length Safety Hazard: Physical
& cut the May hit the body Injury
22 strip as per Y N N N part(hand) if body
desired motion comes in
length sheet movement
path
Health
Hazard:NIL NIL
Setting of
sheet holder
23 Y N N N
of the stacker
unit
Setting of Safety Hazard: Physical
sheet holder Material may Injury/Mat
23 Y N N N
of the stacker scattered and hit erial
unit the body part if Damage
not set properly
Health
Hazard:NIL NIL
Dropping of Safety Hazard: Physical
24 sheet into the Y N N N May hit the body Injury
stacker part if not handled
properly
Health
Pushing of Hazard:NIL NIL
packet Safety Hazard: Physical
outside May harm the Injury
25 Y N N N
through body part if came
roller in motion of
convayor convayor unit
Health
Hazard:NIL NIL
Safety Hazard: 1) Physical
Fingers may get Injury/Mat
cut material may erial
damage Damage
Packaging To
be done as
26 per the Y N N N 2) Scrap
packaging dispenser kept on
norms walk way, due to
this person got
trapped with this.
Do stickering Health
& move the Hazard:NIL NIL
pkt at its
marked place
by means of
inline crane
27 Y N N N
Do stickering
& move the
pkt at its
a) Safety Hazard: Physical
marked place Injury/Mat
Pkt may fall from
by means of erial
the crane
inline crane Damage
Unusual body
motion at crane
movement area
will cause injury .
b) During
lifting sheet pkts
27 Y N N N Crane operatotr
must insure that
no body is in
range of lifting
area and Lift the
pkts after getting
signal from crane
helper.
Scrap Health
handling Hazard:NIL NIL
Safety Hazard: Physical
28 Y N N N Handling of Injury
scraps with bare
hands may cut the
body parts
Probability (P): Almost possible-10, Quite Possible-6, Unusual but possible-3, Remotely possible-1, Very unlikely-0.5 & Prac
Exposure (E): Continuous-10, Frequent-06, Occasional-03, Infrequent-02, Rare-01& Very Rare-0.5
Risk Score: Multiplication of values of the three ( C x P x E ) - Risk score < 200 - Acceptable. Risk Score > 200 - Not Accep
Risk Score bands - VH- Very high risk >400, H-High risk 200-400, S- Substantial Risk 80-200, M-Moderate risk 20-80,A- Pro
Risk Acceptability - Acceptable - A, Not Acceptable (Emergency measures are required) - NA
S-Safety, H-Health, B-Behaviour, E-Ergonomics
D R N 5 1 1 5 A NA O
D R N 5 6 2 60 A NA O
D R N 25 1 1 25 A O
NA
D R N 5 1 0.5 2.5 A O
NA
D R N 5 1 0.5 2.5 O
NA
D R N 5 1 1 5 A O
NA
D R N 1 2 0.5 1 A O
D R N 1 2 6 12 A O
NA
D R N 1 6 0.5 3 A O
NA
D R N 5 1 0.5 2.5 A O
NA
D R N 0 A O
NA
D R N 1 6 1 6 A O
NA
D R N 1 6 0.5 3 A O
NA
D R N 1 6 0.5 3 A O
NA
D R N 5 2 0.5 5 A O
NA
D R N 5 6 1 30 M O
NA
D R N 1 6 1 6 A O
NA
D R N 1 3 1 3 A O
NA
D NR EM 5 3 1 15 A O
NA
D R N 0 A O
NA
D R N 0 A O
NA
D R N 1 6 0.5 3 A O
NA
D R N 5 6 1 30 M O
NA
D R N 5 6 1 30 O
NA
D R N 1 6 0.5 3 A O
NA
D R N 1 6 1 6 A O
NA
D R N 1 6 0.5 3 A O
NA
D R N 5 3 1 15 A O
NA
D R N 5 3 1 15 O
NA
D R N 5 3 3 45 M O
NA
SSOP-
Crane
Admin
Control
SSOP-
Crane
Admin
Control
SSOP-
Crane
Admin
Control
SSOP-
Crane
Admin
Control
SSOP -CTL
Admin
Control
SSOP -CTL
Admin
Control
SSOP -CTL
Admin
Control
SSOP-
Crane
Admin
Control
SSOP -CTL
Admin
Control
SSOP -CTL
Admin
Control
SSOP -CTL
Admin
Control
SSOP -CTL
Admin
Control
SSOP -CTL
Admin
Control
SSOP -CTL
Admin
Control
SSOP -CTL
PPE
SSOP -CTL
PPE
SSOP -CTL
PPE
SSOP -CTL
PPE
SSOP -CTL
PPE
SSOP -CTL
PPE
SSOP -CTL
Admin
Control
SSOP -CTL
SSOP -CTL
PPE
SSOP -CTL
PPE
SSOP -CTL
PPE
SSOP -CTL
SSOP -CTL
Nil
1) PPE
2)
Admin.
Control.
SSOP -CTL
Admin SSOP-
Control Crane
Admin SSOP-
Control Crane
PPE
SSOP
-Crane
PSPL STEEL PROCESSORS PRIVATE LIMITED,
JAMSHEDPUR
Document No : OHS/HR/HIRA/PROD/MOTHER COIL HANDLING.
Doc Revision No : 11
Document Revision Date : 11.07.2016
Sl. No.
Machines,
equipmen
t, Tasks
productio being
Type of Hazard Type of Hazard
n performe
processes d
or
locations
S H B E S H B
Searching
for
1 mother
coil
Y N N
Reporting
of vehicle
at the
Gate
2
respective
ly
Y N N
Y N N
Entry of
vehicle
through
3 gate as
well as
plant
Y N N
Collection
of paper
from the
Transport
er/Driver
4 by
Despatch
clark
Y N N
Physically
checking
of coil
with
5 sticker
with
paper
Y N N
Y N N
Writing
on the coil
6 by Chalk
Y N N
Inserting
crane C-
hook in
the
7 mother
coil on the
vehicle
Y N N
Y N N
Unloadin
g of the
TISCO
mother
8
coil from
the
vehicle
Y N N
Placing of
mother
coil in coil
stock area
9 on saddle
Y N N
Y N N
Releasing
10 of vehicle
from the
plant
Y N N
Consequences: Numerous Fatalities-100, Multiple fatalities-50, Fatalities-25, Serious Injury-15, Casulty Treatment-05 & First ai
Probability (P): Almost possible-10, Quite Possible-6, Unusual but possible-3, Remotely possible-1, Very unlikely-0.5 & Prac
Exposure (E): Continuous-10, Frequent-06, Occasional-03, Infrequent-02, Rare-01& Very Rare-0.5
Risk Score: Multiplication of values of the three ( C x P x E ) - Risk score < 200 - Acceptable. Risk Score > 200 - Not Accep
Risk Score bands - VH- Very high risk >400, H-High risk 200-400, S- Substantial Risk 80-200, M-Moderate risk 20-80,A- Pro
Risk Acceptability - Acceptable - A, Not Acceptable (Emergency measures are required) - NA
S-Safety, H-Health, B-Behaviour, E-Ergonomics
Hazard
E C E P Score
Health D R N 5 6 3 90
Hazard:NI
L
NIL
Safety Material
Hazard: disallocati
Possibility on
of slip
N while
searching
for mother
coil in
mother
coil area
Health D R N 1 6 1 6
Hazard:NI
L
NIL
N
N Safety Material
Hazard: disallocati
Entry at on
the gate
without
security
check
N NIL
Safety coil may
Hazard: fall if loose
Improper bindings
road are there
condition
Health D R N 1 6 0.5 3
Hazard:NI
L
N NIL
Safety Physical
Hazard: injury
Do not
cllect the
paper by
getting
into the
vehicle
Health D R N 5 2 0.5 5
Hazard:NI
L
NIL
N
N Safety Physical
Hazard: injury
Watch
your steps
on the
triler
platform
during
walking
Health D R N 1 6 1 6
Hazard:NI
L
NIL
Safety Physical
Hazard: injury
Unsafe
N body
motion
during
writing
may cause
accident
Health D R N 1 6 1 6
Hazard:NI
L
NIL
N
Safety Physical
Hazard: injury
Perform
this
operation
N only if the
person
writing on
mother
coil and
driver get
down from
the
vehicle.
NIL
Safety Physical
Hazard: Injury/Mat
N erial
Coil may
fall from Damage
the C hook
& can
injured
any person
Health D R N 15 3 6 270
Hazard:NI
L
NIL
N
Safety Physical
Hazard:Co Injury
N il may fall
if the coil
is placed
wrongly
on saddle
or saddle
is not
grouted
properly
Safety Officer
- Phase - I
A NA O
Admin S&L
control Procedure
A NA O Admin
control
S&L
Procedure
S&L
Procedure
A NA O Admin
control
S&L
Procedure
A NA O Admin
control
S&L
Procedure
A O Admin
control
S&L
NA Procedure
S&L
NA Procedure
A O Safety
Instruction
S&L
Na Procedure
A O Safety
Instruction
SSOP-
NA Crane
SSOP-
NA Crane
A O Admin
control
SSOP-
NA Crane
H O Engineerin
g Control
OHSJ/MP
-
NA 01/PROD/
Jul'14
OHSJ/MP
-
NA 01/PROD/
Jul'14
A O Instruction
(Road
Safety)
Material S&L
damage Procedure
Administrative control
&warning, PPEs
OCP-Operational Control
Procedure
Associate
HAZARD IDENTIFICATION AND RISK A
Lowering Y N N N Health
the hoist. Hazard:NIL
NIL
Safety Physical
Hazard: Injury/Mat
2 Sling may erial
get Damage
damaged,ho
ok may fall
down.
Manual Y N Y N Health
direction Hazard:NIL
providing NIL
of the hook. Safety Physical
Hazard: Injury/Mat
The hook erial
3 may hit the Damage
helper who
is providing
the
direction.
Hoisting up Y N N N Health
the slitted Hazard:NIL
FG. NIL
4
Hoisting up Y N N N
the slitted
FG.
Safety Physical
Hazard: If Injury/Mat
the mother erial
coil breadth Damage
is more
4 than the
hook of the
crane than
there is a
chance of
slipping of
the slit.
Giving Y N N N Health
direction Hazard:NIL
towards the NIL
weigh Safety Physical
scale. Hazard: Injury/Mat
5 Sling may erial
get Damage
damaged,ho
ok may fall
down.
Giving Y N N N Health
direction Hazard:NIL
towards the NIL
weigh Safety
scale. Hazard:
While
6 taking out
the hook
from ID of
the coil it
may hit the
person on
way.
Storage of Y N N N Health
occuts Hazard:NI
L NIL
8
Storage of Y N N N
occuts
Safety Physical
Hazard: Injury
8 coil may
fall on the
floor if not
stored in
racks
TINPLAT
E/BINA
B METAL
LOADING
Y N N N Health
Hazard:NIL
NIL
Providing Safety Physical
the coil Hazard: Injury/Mat
1 Sling may erial
towards the
trailer. get Damage
damaged,ho
ok may fall
down.
Several Y N N N Health
operations Hazard:NIL
performing NIL
to fix the Safety Physical
coil Hazard: If Injury/Mat
properly on not erial
3 the trailer. properly Damage
placed on
the trailer
the coil
may roll
down.
TELCO
C LOADING
Providing Y N N N Health
the crane Hazard:NIL
towards the NIL
hook
-keeping
1 rack near
WIP rack.
Providing Y N N N
the crane
towards the
hook Safety Physical
-keeping Hazard:Slin Injury/Mat
1 rack near g may get erial
WIP rack. damaged,ho Damage
ok may fall
down.
Providing Y N N N Health
the crane Hazard:NIL
towards the NIL
hook Safety Physical
-keeping Hazard: Injury
rack near Several
2 WIP rack. operations
at a time
may lead to
loose
control.
While Y N N N Health
loading the Hazard:NIL
second/thir NIL
d slit the Safety Physical
khalasi Hazard: Injury/Mat
provides a The erial
wooden wooden
3 Damage
block block may
vertically in slip at any
between time & the
two coils. coil may
fall at any
side.
LUDHIAN
A
D LOADING
Since it is Y N N N Health
loaded with Hazard:NIL
3 slits in NIL
max at a Safety Physical
time,if all Hazard: Injury
three are While
not taking the
together,the
last slit the
y are taken hook,alread
1 together. y loaded
with 2 slits
may hit the
coil & it
may fall
down.
Insertion of Y N N N Health
the hook Hazard:NIL
into the NIL
nose of the
tilter.
2
Insertion of Y N N N
the hook
into the
nose of the Safety Physical
tilter. Hazard: If Injury
not
2 properly
controlled
the material
may fall
down.
Y N N N Health
Hazard:NIL
NIL
The tilter
special Safety Physical
hook is Hazard: injury
manually While
4 dragged to dagging the
place it hook if not
below the properly
slits from balanced,th
both sides. e helper
may fall.
Y N N N Health
Hazard:NIL
NIL
It is placed Safety Physical
below the I- Hazard: Injury
shaped While
5 coils placing the
mounted on hook if not
the tilter properly
nose. balanced,th
e helper
may fall.
Y N N N Health
Hazard:NIL
It is placed NIL
below the I-
shaped
6 coils
mounted on
the tilter
nose.
Y N N N
It is placed
below the I- Safety Physical
shaped Hazard: Injury/Mat
6 coils The hook erial
mounted on loaded with Damage
the tilter coils may
nose. hit the
driver &
khalasi.
Health
Hazard:NIL
NIL
Safety Physical
Hazard: Injury
The
operator
Climbing may slip
up the stair while
7
to board on
Y N N N
climbing,ke
the trailer. eping eye
on the crane
rather than
on the
steps.
Health
Hazard:NIL
NIL
Safety Physical
Hazard:The Injury
operator
may slip
Climbing while
down the climbing
8
stair to
Y N N N
down,keepi
floor. ng eye on
the crane
rather than
on the
steps.
OWN
STOCK
F
LOADIN
G
pkts/coil -
safe Health
distance to Hazard:NI
be L
1 maintained
Y N Y N NIL
between the Safety Physical
sheetslit Hazard: Injury
packed
pkts/coil
coils / Health
sheet pkts Hazard:NI
placed on L
2 Y N N N NIL
the truck
vertically Safety Physical
Hazard: Injury
on some
wooden
The chain Health
is Hazard:NI
realeased L
3 Y N N N NIL
from the
length of Safety Physical
Hazard: Injury
the bundle
towards
Health
the outside
Hazard:NI
of the
L
4 vehicle Y N N N NIL
with one Safety Physical
part of the Hazard: Injury
chain
Thestill
Health
wooden
Hazard:NI
block
L
5 splits out Y N N N NIL
side from Safety Physical
below the Hazard: Injury
bundle
LOADIN
G
G
PICKLE
D COILS
Health
Hazard:NI
Providing
L
1 the felt on Y N N N NIL
the FG. Safety Physical
Hazard: Injury
Health
Fastening Hazard:NI
the chain L
2 Y N N N NIL
across the
the felt. Safety Physical
Hazard: Injury
Health
Hazard:NI
L
NIL
Safety Physical
Hazard: Injury
Resting of Coil may
coil on slip from
3 Y N N N
Trailer Trailer
bed bed during
Loading of
coil.
Providing
crane Health
towards Hazard:NI
the FG L
4 Y N N N NIL
with chain
hanging Safety Physical
from the Hazard: Injury
hook.
onsequences: Numerous Fatalities-100, Multiple fatalities-50, Fatalities-25, Serious Injury-15, Casulty Treatment-05 & First aid treatmen
Probability (P): Almost possible-10, Quite Possible-6, Unusual but possible-3, Remotely possible-1, Very unlikely-0.5 & Practically im
Exposure (E): Continuous-10, Frequent-06, Occasional-03, Infrequent-02, Rare-01& Very Rare-0.5
Risk Score: Multiplication of values of the three ( C x P x E ) - Risk score < 200 - Acceptable. Risk Score > 200 - Not Acceptable
Risk Score bands - VH- Very high risk >400, H-High risk 200-400, S- Substantial Risk 80-200, M-Moderate risk 20-80,A- Probably ac
Risk Acceptability - Acceptable - A, Not Acceptable (Emergency measures are required) - NA
S-Safety, H-Health, B-Behaviour, E-Ergonomics
Dated - 06.03.10
Revision No- 03
D R N 15 1 0.5 7.5 A NA
D R N 15 1 0.5 7.5 A NA
D R N 15 1 3 45 M
NA
D R N 15 1 3 45 A
NA
D R N 15 1 3 45 A
NA
NA
NA
D R N 5 1 1 5 A
NA
D R N 15 3 3 135 A
NA
D R N 15 3 3 135 A
NA
D R N 15 1 0.5 7.5 A
NA
D R N 15 1 1 15 A
NA
D R N 0 A
NA
D R N 15 1 0.5 7.5 A
NA
D R N 15 1 0.5 7.5 A
NA
D R N 5 1 1 5 A
NA
D R N 15 2 0.5 15 M
NA
D R N 15 1 0.5 7.5 A
NA
D NR EM 15 1 1 15 A
NA
D NR EM 15 1 1 15 A
NA
D R N 15 1 0.5 7.5 A
NA
D R N 5 1 1 5 A
NA
D R N 5 1 1 5 A
NA
D R N 15 1 1 15 A
NA
D R N 15 1 1 15 A
NA
D R N 5 1 1 5 A
NA
D R N 5 1 1 5 A
NA
D R N 5 1 2 10 A NA
D R N 5 6 2 60 A NA
D R N 5 6 6 180 A
NA
D R N 15 1 6 90 M
NA
O NA Admin
Control
SSOP-
Crane
O NA Admin
Control
SSOP-
Crane
O NA Admin
Control
SSOP-
Crane
O NA Admin
Control
SSOP-
Crane
O NA Admin
Control
SSOP-
Crane
O NA PM
SSOP-
Crane
O NA Safety
Instruction
SSOP-
Crane
O NA Safety
Instruction
SSOP-
Crane
O NA engineerin
g control
OHSJ/MP-
01/PROD/
April-14
O NA engineerin
g control
OHSJ/MP-
01/PROD/
April-14
O NA PM
SSOP-
Crane
O NA Safety
Instruction
SSOP-
Crane
O NA Admin
Control by
placing
wheel
chock
before
loading SSOP-
Crane
O NA PM
SSOP-
Crane
O NA PM
SSOP-
Crane
O NA Admin
Control
SSOP-
Crane
O NA Now steel
rack has
been made
as per the
coil width.
SSOP-
Crane
O NA
Loading SSOP-
Instruction Crane
O NA Admin
Control
SSOP-
Crane
O NA Admin
Control
SSOP-
Crane
O NA Admin
Control
SSOP-
Crane
O NA
Loading SSOP-
Instruction Crane
O NA
Loading SSOP-
Instruction Crane
O NA Safety
Instruction(
While
loading
Driver &
khalasi is SSOP-
not allowed Crane
in to the
vehicle)
O NA Safety
Instruction(
While
loading
Driver &
khalasi is SSOP-
not allowed Crane
in to the
vehicle)
O NA Movable
stair has
been made
and
available on
floor
SSOP-
Crane
O NA Movable
stair has
been made
and
available on
floor
SSOP-
Crane
NA
Admin SSOP-
O
Control Crane
NA Admin
Control
SSOP-
O
Crane
NA Admin
Control
SSOP-
O
Crane
NA Admin
Control
SSOP-
O
Crane
NA Admin
Control
SSOP-
O
Crane
O NA Admin
Control
SSOP-
Crane
O NA Admin
Control
SSOP-
Crane
O NA
Visual SSOP-
Control Crane
O NA Admin
Control
SSOP-
Crane
g control, Administrative
ol &warning, PPEs
tional Control Procedure
HAZARD IDENTIFICATION
t, Tasks
Sl. No. productio being Type of Hazard Hazards Potential D/I
n performe S H B E Harm
processes Packagin
d Y N N N Health D
g To be Hazard:NI
done as L
NIL
per the
packaging Safety Physical
Hazard: Injury/MAt
norms
1 Fingers erial
may get Damage
cut by
strap or
wire.
Packagin Y N N N Health D
g to be Hazard:NI
done on L
NIL
the
stacker Safety Physical
Hazard: Injury
Leg may
2
got
cramped
in the rolls
FOR
WCTL
Packing Y N N N Health D
of the Hazard:NI
material L
NIL
having
length out
3 of the
stacking
length
Packing Y N N N D
of the
material
having
length out Safety Material
3 of the Hazard : Damage
stacking During
length handling
hand may
cut
Do Y N N N Health D
stickering Hazard:NI
& move L
NIL
the pkt at
its Safety Physical
Hazard: Injury/MAt
marked
Pkt may erial
place by Damage
means of fall from
inline the crane
crane Unusual
4 body
motion at
crane
movement
area will
cause
injury
Probability (P): Almost possible-10, Quite Possible-6, Unusual but possible-3, Remotely possible-1, Very unlikely-0.5 & Prac
Exposure (E): Continuous-10, Frequent-06, Occasional-03, Infrequent-02, Rare-01& Very Rare-0.5
Risk Score: Multiplication of values of the three ( C x P x E ) - Risk score < 200 - Acceptable. Risk Score > 200 - Not Accep
Risk Score bands - VH- Very high risk >400, H-High risk 200-400, S- Substantial Risk 80-200, M-Moderate risk 20-80,A- Pro
Risk Acceptability - Acceptable - A, Not Acceptable (Emergency measures are required) - NA
S-Safety, H-Health, B-Behaviour, E-Ergonomics
R N 2 5 3 30 M NA O
NR N 1 3 1 3 A NA O
NR N 1 3 1 3 A NA O
R N 5 3 3 45 M NA O
SSOP-
Packaging
PPE &
Admin
control
SSOP-
Packaging
Admin
control
SSOP-
Packaging
PSPL ST
HAZARD I
Document No: OHS/HR/HIRA/QAPC/(16-17)
Risk Score: Multiplication of values of the three ( C x P x E ) - Risk score < 200 - Acceptable. Risk Score > 200 - Not Acceptable
ye
s
No
Evaluation
R/ NR
N/Ab
/Em
D/I
Hazards Potential Harm
C E P Score
< 200 - Acceptable. Risk Score > 200 - Not Acceptable Type of Hazard
Safety S
Behavioural B
Ergonomic E
Dated - 15.10.12
Revision No -04
Risk Level Affacted Business (Anexure-II) Current method of Reference Document:
(VH/HS/M/A) /Persons Concern risk control (use HOC) OCP/MP
(Anexure-I) L/O/I/T/E
TSPDL/HR/JSR/SSOP/Slittin
A NA O Awareness
g
TSPDL/HR/JSR/SSOP/Slittin
A NA O Awareness
g
A NA O Awareness
A NA O Awareness
A NA O Engg Control
A NA O Awareness
A NA O Engg Control
Engg Control
A NA O
Engg Control
A NA O
Engg Control
A NA O
OHS/ANNEX-
A NA O II/QAPC/16 Engg Control OHS/MP/QAPC/(13-14)/2
OHS/ANNEX-
M NA O
II/QAPC/17 Engg Control OHS/MP/QAPC/(14-15)/1
OHS/ANNEX-
A NA O
II/QAPC/18 Engg Control OHS/MP/QAPC/(14-15)/2
OHS/ANNEX-
S NA O
II/QAPC/19 Engg Control
OHS/ANNEX-
S NA O
II/QAPC/20 Engg Control
OHS/ANNEX-
H NA O
II/QAPC/21 Engg Control
Risk Acceptability
Acceptable A Direct D
Not Acceptable (Emergency NA Indirect I
measures are required) Routine R
Business Concern Non Routine NR
Legal L Normal N
Operational O Abnormal AB
Interrested partys concern I Emergency EM
Technologically feasible T
Economical E
Loaded vehicle
The vehicles move from the parking
2 reports at weigh lot to the weigh bridge for recording
bridge for recording
gross weight. tare weight.
yes No No No
Parking of empty The empty trailors should be parked
3 trailors at the mantaining a safe distance of 5 feet
designated parking
from all sides from one another.
lot.
yes No No No
1) The unloading point should be
checked to facilitate coil unloading.
4 2) The coil condition,
Despatch Associte is coil number, size, grade packing
informed for vehicle condition and weight of the coils should
unloading. be checked with the Invoice / DC.
yes No yes No
Vehicle helper wearing proper
Vehicle entry at PPEs(arm guard, leg guard, safety
5 loading point. helmet,safety shoes)should guide the
vehicle towards the loading point.
yes No yes No
Handbrakes are applied, keys are
6 Vehicle engine is taken out of the key slot and scotch
turned off.
blocks are put on the vehicle tyres.
yes No yes No
Risk Score: Multiplication of values of the three ( C x P x E ) - Risk score < 200 - Acceptable. Risk Score > 200 - Not Acceptable
HOC- Elimination, Substitution, Engineering control, Administrative control &warning, PPEs
yes
No
Evaluation
N/Ab/E
R/ NR
D/I
Hazards Potential Harm
m
C
Too much vehicle congestion may lead to Injury can occur to the
resticted movement of vehicles by which driver and vehicle damage D R N 15
they can hit one another. may take place.
Health H
Behavioural B
Ergonomic E
LIMITED,
ASSESSMENT
Drivers,
2 3 90 S O
helpers
Vehicles and
persons
1 3 45 M moving on O
the main
road.
2 3 90 S Drivers, O
helpers
0 0 0 A Nil O
Vehicle
0.5 3 45 M helper O
Loader,
3 1 45 M Crane O
operator
3 1 45 M Vehicle
helper
3 1 45 A Vehicle O
helper
Vehicle
0.5 0.5 5 M helper O
Vehicle
3 1 45 H
helper
O
Vehicle
3 1 45 S
helper
O
Vehicle
3 1 45 H helper O
3 1 45 S Anyone O
3 1 45 S Anyone O
Economical E
TSPDL/S&L/2010/01;
Administrative control
Rev/02
PPEs TSPDL/S&L/2010/01;
Rev/02
TSPDL/S&L/2010/01;
Administrative control Rev/02
PPEs TSPDL/S&L/2010/01;
Rev/02
PPEs TSPDL/S&L/2010/01;
Rev/02
PPEs TSPDL/S&L/2010/01;
Rev/02
D
I
R
NR
N
AB
EM
cer and OHS Cordinator
Document No: OHS/HR/HIRA/S& L /Vehicle Unloading For coil by Mobil crane /01
Type of Hazard
Machines, equipment,
Sl. No. production processes Tasks being performed
or locations S H B E
yes No No No
Before entering into premises, ensure
1 Loaded vehicle Report Vehicle fitness/ licenced driver is
at Gate no -3 driving the vehicle & training pack of
TSPDL
yes No No No
Loaded vehicle
reports at weigh The vehicles move from the parking
2 bridge for recording lot to the weigh bridge for recording
gross weight. tare weight.
yes No No No
Parking of empty The empty trailors should be parked
trailors at the
3 designated parking mantaining a safe distance of 5 feet
from all sides from one another.
lot.
yes No No No
1) The unloading point should be
Despatch Associte is checked to facilitate coil unloading.
4 informed for vehicle 2) The coil condition,
unloading. coil number, size, grade packing
condition and weight of the coils should
be checked with the Invoice / DC.
yes No yes No
Vehicle helper wearing proper
Vehicle entry at PPEs(arm guard, leg guard, safety
5 Trading area loading
point. helmet,safety shoes)should guide the
vehicle towards the loading point.
yes No yes No
Handbrakes are applied, keys are
Vehicle engine is
6 turned off. taken out of the key slot and scotch
blocks are put on the vehicle tyres.
Driver must ensure that the yes No No No
handbrakes are applied and scotch
Drivers responsibility blocks are provided.
7 while unloading of Ignition key should be
Mother coil removed from key slot.
yes No No No
Proper height ladder should be used
Ladder is placed so that the helper involved in Coil &
8 against the trailor sheet packet placement do not fall
bed. down from the trailor bed and get
hurt.
yes No No No
Match coil No with T.C & in sticker &
Identification of write width ,thick,grade on side
9 correct coil to be
loaded on the vehicle. surface by chalk ( mention tube
/tisco/own as applicable )
yes No yes No
Driver / Helper
10 involved in removing
chains from the D- Ensure no hand or any body parts get
shackles injured while removing the sling.
Ensure no stuck of sling
below the load before lifting
yes No No No
Removal of Sling from 1) No person is allowed in the vicinity of
12 coils after coil placing hook. 2)
on saddles Safety latch should be available and
functional.
yes No No No
The ladder and scotch blocks are
Removal of ladder removed from the vehicle bed and
13
and wheel stoppers. vehicle tyres respectively to allow its
exit from the plant.
yes No No No
Movement of vehicle
The vehicle driver in consultation
14 from loading point to from the vehicle helper takes out the
weigh Bridge &
vehicle out vehicle from the plant .
Risk Score: Multiplication of values of the three ( C x P x E ) - Risk score < 200 - Acceptable. Risk Score > 200 - Not Acceptable
yes
No
Evaluation
N/Ab/Em
R/ NR
D/I
Hazards Potential Harm
C
Nil D R N 0
Proper Vigilance on the vehicle to follow the
TSPDL Logistics safety Norms to ensure
driving discipline.
If the engine is not turned off then the Major injury leading to
vehicle may roll out and hit the Vehicle fracture of body parts.
helper or crane operator. D R N 15
Behaviour : scotch blocks are not put on the serious injury
vehicle tyres
Major injury leading to D R N 15
fracture of body parts.
Safe parking of vehicle .
Scotch Blocks to be placed in a safe manner.
Health H
Behavioural B
Ergonomic E
LIMITED,
ASSESSMENT
2 3 90 S Drivers, O
helpers
Vehicles and
persons
1 3 45 M moving on O
the main
road.
Drivers,
2 3 90 S helpers O
0 0 0 A Nil O
Vehicle
0.5 3 45 M helper O
Loader,
3 1 45 M Crane O
operator
3 1 45 M Vehicle
helper
Vehicle
3 1 45 A O
helper
Vehicle
3 1 45 H
helper
O
Vehicle
3 1 45 S helper O
Vehicle
3 1 45 H helper O
3 1 45 S Anyone O
3 1 45 S Anyone O
Economical E
TSPDL/S&L/2010/01;
Administrative control Rev/02
TSPDL/S&L/2010/01;
Administrative control Rev/02
PPEs TSPDL/S&L/2010/01;
Rev/02
TSPDL/S&L/2010/01;
Administrative control
Rev/02
TSPDL/S&L/2010/01;
PPEs Rev/02
PPEs TSPDL/S&L/2010/01;
Rev/02
TSPDL/S&L/2010/01;
PPEs
Rev/02
D
I
R
NR
N
AB
EM
2
Shifting Vehicle reports at PPEs(arm guard, leg guard, safety yes
helmet,safety shoes)should guide
No yes No
Trading area for coil shifting.. the vehicle towards the loading
Handbrakes are applied, keys are yes No yes No
Shifting Vehicle engine is
6
turned off. taken out of the key slot and scotch
blocks are put on the vehicle tyres.
yes No No No
Proper height ladder should be
Ladder is placed against the used so that the helper involved in
7 Coil & sheet packet placement do
trailor bed. not fall down from the trailor bed
and get hurt.
Safe lifting of Coil & sheet packets
Coil & Sheet packet loading from the FG area by engaging wire yes No yes No
9 on the vehicle bed by Mobile sling and placing them on the
cranes.
vehicle bed. yes No No No
yes No No No
yes No No No
The vehicle driver in consultation
15 Signal for trailer movement from the vehicle helper takes out
from loading point to unloading the vehicle from the plant .
point inside plant
yes No yes No
Vehicle helper wearing proper
PPEs(arm guard, leg guard, safety
5 Shifting vehicle entry at helmet,safety shoes)should guide
loading point.
the vehicle towards the loading
point.
yes No yes No
Handbrakes are applied, keys are
Shifting Vehicle engine is
6 turned off. taken out of the key slot and scotch
blocks are put on the vehicle tyres.
yes No No No
Proper height ladder should be
used so that the helper involved in
8 Ladder is placed against the
trailor bed. Coil & sheet packet placement do
not fall down from the trailor bed
and get hurt.
yes No No No
10
Ensure no hand or any body parts get
Driver / Helper involved in injured while removing the sling.
removing chains from the D- Ensure no stuck of
shackles sling below the load before lifting
Risk Score: Multiplication of values of the three ( C x P x E ) - Risk score < 200 - Acceptable. Risk Score > 200 - Not Acceptable
R/ NR
N/Ab
/Em
D/I
Hazards Potential Harm
C E
Health H
Behavioural B
Ergonomic E
E LIMITED,
ASSESSMENT
3 90 S Drivers, helpers O
3 45 M Vehicle guide O
Loader, Crane
1 45 M operator O
Loader, Crane
1 45 H operator O
1 45 S Loading helper. O
1 45 H Loading helper. O
1 45 VH Loading helper. O
1 45 S Anyone O
1 45 S Anyone O
Vehicle helper
3 45 M O
Loader, Crane
1 45 M operator O
1 45 M Vehicle helper
1 45 A Vehicle helper O
1 45 S Vehicle helper O
1 45 H Vehicle helper O
1 45 S Anyone O
ds Risk Acceptability
00 VH Acceptable A Direct
0 H Not Acceptable (Emergency NA Indirect
80-200 S measures are required) Routine
-80 M Business Concern Non Routine
able risk<20 A Legal L Normal
Operational O Abnormal
Interrested partys concern I Emergency
Technologically feasible T
Economical E
Dated - 20.10.2013
TSPDL/S&L/2010/01;
PPE
Rev/02
TSPDL/S&L/2010/01;
PPEs Rev/02
TSPDL/S&L/2010/01;
PPEs Rev/02
PPEs TSPDL/S&L/2010/01;
Rev/02
D
I
R
NR
N
AB
EM