HAZARD IDENTIFICATION, RISK ASSESSMENT & RISK CONTROL ( HIRARC ) REGISTER

Function / Department : MAKMAL GEOTEKNIK 2


Title of Activity : SIEVE ANALYSIS

Legal : ACT 514 / ACT 139 / ACT 302 / ACT 127

Job performed by : NUR HANIM SURAYA BINTI MIAN Section :


Checked by / Date : Approved by / Date :
Prepared by / Date : NUR HANIM SURAYA BINTI MIAN / 22/12/2023

RISK CONTROL
HAZARD IDENTIFICATION RISK ASSESSMENT
Recommendation
No. Sub-Activity Type Hazard Effect Existing Risk Control L S RPN = L x S RC Recommended Risk Control Person in Charge/Due date/ Status

Dust,Spill,Fallin
1 Cleaning apparatus R Irritation Face mask, Safety boot, Jacket 1 2 2 1
g Object
Record the weight of each sieve and file the pan size
2 R Falling object Injury Housekeeping, Safetyboot, Jacket 2 2 4 1
accordingly

3 Take out 500g sample, transfer to top sieve pan R Dust, Spill Irritation Face mask, Safety boot, Jacket 2 2 4 1

Transfer file on pan into sieve machine and lock the


4 R Falling object Injury Housekeeping, Safetyboot, Jacket 1 2 2 1
sieve
Electrical Dry hand, Housekeeping, Safetyboot,
5 Set timer to 5 minutesand switch ON sieving machine R Switch, Noice 2 2 4 1
Shock Jacket
Electrical Dry hand, Housekeeping, Safetyboot,
6 Switch OFF and unlock the sieve R Switch 2 2 4 1
Shock Jacket

7 Take out file of pan from the sieve machine R Falling object Injury Housekeeping, Safetyboot, Jacket 1 1 1 1

Dust,Spill,Fallin Irritation, Face mask, Housekeeping, Safety boot,


8 Record weight off each sieve with sample R 2 1 2 1
g Object Injury Jacket
Cleaning apparatusand stored sieve in the original
9 R None None Housekeeping, Safetyboot, Jacket 2 1 2 1
place

Type of Activity
R = Routine Rating Likelihood (L) Description
Risk Priority Number ( RPN ) Risk Category Risk Level Action and Time Scale
NR = Non Routine 1 Inconceivable Is practically impossible and has never occurred
( RC )
2 Remote/unlikely Has not been known to occur after many years A risk identified as LOW may be considered as
Conceivable acceptable
3 Might be occur at sometimes in future
1-4 I Tolerable and further reduction may not be necessary.
4 Possible Has a good chance of occurring and is not unusual However, if the
Most likely risk can be resolved quickly and efficiently, control
5 The most likely result of the hazard/ event being relized measures
A MEDIUM risk requires a planned approach to controlling
the hazard and applies temporary measure if required.
Severity ( S )
5 - 12 II Significant Actions taken must be documented on the risk assessment
Form including date for completion.
Rating Nature of Injury / ill health Estimate loss (RM) UiTM Reputation
1 First Aid only < 10 Slightly effected
2 Minor injury (1 day MC) < 100 Discussion at the management level A HIGH risk requires immediate action to control the hazard
3 Major injury (> 4 days MC) < 1000 Becomes an issue to the clients as detailed in the hierarchy of control. Actions taken must
15 - 25 III Intolerable be Documented on the risk assessment form Including date
4 Permanent disability < 10,000 Becomes an issue among the public Universities for completion.
5 Fatal > 10,000 Becomes an issue at the level of the Ministry of Higher Education

Page 1 of 1

You might also like