You are on page 1of 3

Job Name- Chennai-Trichy-Madurai Pipeline Augmentation Project (CTMPL AUG)

Contractor Name - M/S TUAMAN Engineering Limited


Subject - JSA of Rod Binding/ Rod Cutting
Date -

Recommended Control Actions


Risk Identification Desired Controls and Existing Gaps, If Any Risk Assesment to Reduce the Risk Level Action By Remarks

Activity Type Condition Associated Desired Control Risk Risk


SN Activity R/NR Hazards (N/AN/E) Risk Measures Gaps If Any Probability(P) Impact(I) R=P*I Classification

i)Personal Injury
i) Injury of body parts during i) All the PPE's to be maintained properly specially face shield
rod cutting/ manual ii) Fatality and hand gloves.
handling. iii) Electrical Short Ii) Limit Switch for Bar bending machine to be checked for its
Ii) Hit by reinforcement Circuit from burried proper functioning. 1. Internal Communication
Rod Binding/ Rod during Rod bending. cable damage during Iii) Electrical cables,cable joints and connections to be checked during the work among the Risk rating reduces after 1. Proper and periodic training.
1 R N excavation. FR MJ M taking desired control 2. By passing of safety devices to
Cutting Iii) Eye injury during cutting and secured properly. workers.
Iv) Trapped within the measures. be avoided.
work by metal particles. collapsed soil of iv) During Reinforcement shifting hand gloves to be worn on
Iv) Electric Shock / excavated area. priority basis.
Electrocution. v) No unwanted person to be allowed inside the reinforcement
yard.

Likelihood - Possibility of occurrence of risks based on present gaps(Technological/operational/competence/measurement and monitoring


UL:Unlikely, L:Likely, VL:Very Likely, FR: Frequent, C:Continuous
Impact-
SI- Slight Injury, MI - Minor Injury, MJ - Major Injury, SF- Single Fatality, MF - Multiple Fatality
Level of Consequences - Refer guidence criteria for this i.e.Possible degree of damage.
Condition - N: Normal, AN-Abnormal, E- Emergency
Activity Type -: R- Routine, NR- Non-Routine
Risk -
L - Low Risk, M-Moderate Risk, H-High Risk
Impact Probability
UL - 1 L-2 VL - 3 FR -3 C-4

MF HIGH RISK
5 5
10 15 20 25

SI- Slight Injury, MI - Mi


SF
4 8 12 16 20
4

MODERATE
RISK UL:Unlikely, L:Like
MJ
3 6 (ALARP) 12 15
3 9

MI
2 4 6 8 10
2

SI LOW RISK
1 3 4 5
1 2
Risk Rating = Impact * Probability
Low Risk £3
4 £ Moderate Risk ³ 9
High Risk ³ 10
Impact-
SI- Slight Injury, MI - Minor Injury, MJ - Major Injury, SF- Single Fatality, MF -
Multiple Fatality

Probability
UL:Unlikely, L:Likely, VL:Very Likely, FR: Frequent, C:Continuous