Job Name-

Contractor Name - TUAMAN Engineering Limited


Subject - HIRA for Bitumin Melting
Date - 27.01.2020

Recommended Control Actions


Risk Identification Desired Controls and Existing Gaps, If Any Risk Assesment Action By Remarks
to Reduce the Risk Level

SN Activity Activity Type Hazards Condition Associated Desired Control Gaps If Any Probability(P) Impact(I) Risk Risk
R/NR (N/AN/E) Risk Measures R=P*I Classification

i) Area of heating must be clean at away from any


combustiable/inflammable storage/source.
ii) Hard barricading/screening to be provided at the area of bitumin
heating.
1. Fire due to the contact with
cobustiable materials/ iii) Workers engaged for the same activities must be with all the
inflammable substances. requiste PPEs to prevent any Burn Injury.
2. Contact with Skin/Body iv) Portable Fire Extinguishers (DCP/Mech. Foam Type) to be provided 1. Strict monitoring and area
Part. i) Fire Hazard. at the location of heating with adequate supply of Fire Water and i) High Wind Risk rating reduces after separation to be ensured in case of
1 Bitumin Melting NR N ii) Burn of Body Part. other standard Fire Fighting equipments. Velocity. FR MF M taking desired control P.Majumdar/T.Ghosh
3. Spillage of Material and presence of bulk flammable
ii) Environmental pollution. v) LPG Cylinder used for the heating of Bitumin Drum must be placed measures.
earth contamination. at least 2mtr away from the heating oven. storage(Oil/Gas).
4. Mechanical Failure of vi) Cap of the Bitumin Drum must be removed before Heating.
Heating System (LPG Cylinder vii) Strict Monitoring to be ensured during heating to prevent any
and Oven).
overflow or deviation of heating mechanism.
viii) All the spillages must be collected for Hazardous disposal and to
be handed over to Owner.

Likelihood - Possibility of occurrence of risks based on present gaps(Technological/operational/competence/measurement and monitoring


UL:Unlikely, L:Likely, VL:Very Likely, FR: Frequent, C:Continuous
Impact-
SI- Slight Injury, MI - Minor Injury, MJ - Major Injury, SF- Single Fatality, MF - Multiple Fatality
Level of Consequences - Refer guidence criteria for this i.e.Possible degree of damage.
Condition - N: Normal, AN-Abnormal, E- Emergency
Activity Type -: R- Routine, NR- Non-Routine
Risk -
L - Low Risk, M-Moderate Risk, H-High Risk
Impact Probability
UL - 1 L-2 VL - 3 FR -3 C-4

MF HIGH RISK
5 5
10 15 20 25

SI- Slight Injury, MI - Mi


SF
4 8 12 16 20
4

MODERATE
RISK UL:Unlikely, L:Like
MJ
3 6 (ALARP) 12 15
3 9

MI
2 4 6 8 10
2

SI LOW RISK
1 3 4 5
1 2
Risk Rating = Impact * Probability
Low Risk £3
4 £ Moderate Risk ³ 9
High Risk ³ 10
Impact-
SI- Slight Injury, MI - Minor Injury, MJ - Major Injury, SF- Single Fatality, MF -
Multiple Fatality

Probability
UL:Unlikely, L:Likely, VL:Very Likely, FR: Frequent, C:Continuous