Contractor Name -
Subject -
Date -
Risk Identification Desired Controls and Existing Gaps, If Any Risk Assesment Recommended Control Actions Action By Remarks
to Reduce the Risk Level
SN Activity Activity Type Hazards Condition Associated Desired Control Gaps If Any Probability(P) Impact(I) Risk Risk
R/NR (N/AN/E) Risk Measures R=P*I Classification
MF HIGH RISK
5 5
10 15 20 25
MI
2 4 6 8 10
2
SI LOW RISK
1 3 4 5
1 2
Risk Rating = Impact * Probability
Low Risk £ 3
4 £ Moderate Risk ³ 9
High Risk ³ 10
Impact-
SI- Slight Injury, MI - Minor Injury, MJ - Major Injury, SF- Single Fatality, MF -
Multiple Fatality
Probability
UL:Unlikely, L:Likely, VL:Very Likely, FR: Frequent, C:Continuous