ACTIVITY:
Persons at Risk (delete as applicable) Contractor Clients Personnel Visitor Others:
Reviewed by:
Signature:
Signature: Signature: Name :
Name : Poong We Rick Name : Michael Ng Date:
Date: 28th September 2020 Date: 28th September 2020 Designation :
Designation : Engineer Designation : Manager
Likelihood Severity Risk
No Activity Consequences Actions PIC
(L) (S) (R)
1 Material Handling Worker carry 3 2 6 a) Minimum two person is assigned to carry Linde
and excess load. each section/length of pipe (weight = Project
Loading/Unloading 3kg/m). Supervisor
by Manual Lifting
b) Max weight for manual handling =
20kg/person
Cut by rotating drill 3 3 9 a) Ensure the drill bit stop completely before Linde
bit changing the drill bit. Project
Supervisor
b) Ensure ELCB set to 30 A for tool operation.
Noise Hazard 4 2 8 a) All workers shall wear ear plug or ear Linde
muff. Project
Supervisor
b) Blow down the line slowly to ensure that
gas rushing out does not disturb any
workers in surrounding area and to
minimize the noise generated.