3. Tools and tackles required : Mobile crane, Trailor, Red flags, caution
tapes, wooden sleepers, skid rollers, chain
pulley block, slings. D shackles, Nylon ropes.
2. Transportation of Toppling of the vehicle and 1) Ensure speed limit for the tailor
transformer equipment leading to speed should be below 5Km/h.
accident 2) Make sure that road is leveled
and compacted clear.
3) Continuous observation of the
equipment during
transportation by deployment
of dedicated observer/persons.
4) Ensure good condition of Tailor
and road.
5) Operator & rigger should have
qualified and trained.
6) Experienced signal man should
deployed.
3. Shifting a) Slippage of the 1) Check the access to approach.
Transformer from transformer. 2) Review the procedure of
Tailor to Location shifting and initiate necessary
measures.
7. Filling of oil if a) Slipping the person due 1) Before filling of oil ensure that
transformer is oil to spillage of oil. transformer all valves should
type be closed.
2) Stop oil filling if oil spillage is
there due to leaking of valves.
3) Clean oil from floor before
starting job.
4) Stop oil filling machine
immediately.